Joseph Jones

Construction Manager at Buckley Cable Construction Co
  • Claim this Profile
Contact Information
Location
Greater Boston

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United States
    • Telecommunications
    • 1 - 100 Employee
    • Construction Manager
      • Aug 2022 - Present
    • United States
    • Mechanical Or Industrial Engineering
    • 1 - 100 Employee
    • Project Manager
      • Jan 2022 - Aug 2022

      Run field operations. Oversee all onsite and offsite construction to monitor compliance and safety regulations. Accurately forecast resource requirements. Ensure quality construction standards and techniques. Communicate with customer. Review tasks and reports, ensuring completeness, and compliance. Develop strong working relationship with managers to maximize new opportunities for revenue. Lead a team of subcontracted Technicians in the field. This is a Node Split Project, working at an extremely fast pace, with the highest quality standards. Publish a thread every morning for team communication. Maintain The Bridge, a direct customer conference call, all day long. Show less

    • United States
    • Telecommunications
    • 1 - 100 Employee
    • Project Manager
      • 2021 - 2022

      Established goals and milestones. Established standardized project documentation and directives for the project. Conducted pre-construction proofing. Closed a project by completing daily production sheets, verifying proper levels after activation, Documentation, QC and invoicing. Coordinated with subcontractors and vendors to facilitate project completion. Managed and maintained fleet vehicles and equipment. Kept MSO coordinators updated. Tracked revenue flow. Recruited into this position to provide focus, leadership and deep industry expertise. Established a large warehouse, stocked with outsourced materials from vendors and customer supply materials. Led successful turnaround – bringing the project to profitability within seven months. Led “Last Mile Zero” projects as well as and Business as Usual (BAU) projects. Show less

    • United States
    • Telecommunications
    • 100 - 200 Employee
    • Construction Manager
      • 2020 - 2021

      Conducted pre-construction site surveys, as-built mapping, and documented any potential customer, utility, and civil engineering issues as well as roadblocks. Coordinated operations with the customer representatives, DOT, city engineers, public and private utilities for design approval, permitting, traffic control, and product placement. Managed workflow intake, distribution, and completion. Worked as part of the Last Mile Project, a national fiber buildout mandated and funded by the federal government. Subcontractor for Frontier Communications and Spectrum. Conducted supervision of underground construction in Amsterdam, New York. Show less

    • United States
    • Project Manager/Majority Business Partner
      • 2017 - 2020

      Conducted pre-construction survey, as-builts and documented any potential customer, utility, and civil engineering issues and roadblocks. Coordinated operations with city engineers as well as public and private utilities for design approval, permitting, traffic control, and product placement. Supervised multiple underground missiles, trenching, horizontal directional drilling, aerial and MDU/MTU crews. Contracted for projects with four national corporations – STAR, Comcast, Irvin, AXS, Verizon and AT&T. Show less

    • United States
    • Telecommunications
    • 1 - 100 Employee
    • Construction Manager
      • 2016 - 2017

      Conducted pre-construction survey, as-builts and documented any potential customer, utility, and civil engineering issues. Coordinated operations with Metro Nashville engineers and utilities for design approval, permitting, traffic control and product placement. Directed control and supervision of multiple underground missiles, horizontal directional drilling, aerial and MDU crews. Shifted crews into a “recovery/repair mode” after Hurricane Irma. Led “Node Plus Zero” projects for Comcast, changing the electronics to expand bandwidth – as well as and Business as Usual (BAU) projects. Show less

    • Construction Supervisor
      • Jun 2016 - Oct 2016

      Supervised and inspected crews conducting horizontal directional drilling, trenching and missile operations for the placement of underground conduit for Google Fiber. Conducted daily safety and technical specification update meetings with field operators. Inspected all placements of conduit, vaults, pedestals and aerial strand and fiber. Coordinated all operations with Google and Metro Nashville engineers as well as all public and private utilities for design approval, permitting, traffic control and placement of product. Served as liaison for Bechtel and Google Fiber with private residence, business owners and home associations for the placement of Google Fiber Conduit. Lead on Google FTTH Fiber Ring project. Show less

    • United States
    • Business Consulting and Services
    • 200 - 300 Employee
    • Construction Manager
      • 2015 - 2016

      Performed pre-construction, as-builts, walkout of nodes and submitted field design changes. Issued approved work packages for nodes to construction company. Performed daily QC and safety inspection on aerial and UG construction crews. Project was subcontracted. The client was Comcast, in direct competition with Google. The project was a “Node Plus Zero” project – a major upgrade. This was the first of five positions in Nashville area over a period of more than four years. Performed pre-construction, as-builts, walkout of nodes and submitted field design changes. Issued approved work packages for nodes to construction company. Performed daily QC and safety inspection on aerial and UG construction crews. Project was subcontracted. The client was Comcast, in direct competition with Google. The project was a “Node Plus Zero” project – a major upgrade. This was the first of five positions in Nashville area over a period of more than four years.

    • Telecommunications
    • 200 - 300 Employee
    • Lead Lineman Climbing Instructor
      • 2013 - 2015

      Completed aerial and underground heavy construction. Completed site surveys, as-builts and design for new plant extensions. Trained new Lineman and Service Technicians in cable and fiber construction techniques. Completed aerial and underground heavy construction. Completed site surveys, as-builts and design for new plant extensions. Trained new Lineman and Service Technicians in cable and fiber construction techniques.

    • United States
    • Telecommunications
    • 1 - 100 Employee
    • Project Manager
      • 2008 - Jan 2010

      Directed a team of up to 30 subcontracted installers, who were responsible for “triple play” (phone, internet, television) installations for Insight. At time of hire, inherited a team of nine Triple Play Technicians. Given the charge to grow the territory. Built the team up to 30 Technicians. Increased Field Profit Percentage by 61% (from 22% to 36%). Directed a team of up to 30 subcontracted installers, who were responsible for “triple play” (phone, internet, television) installations for Insight. At time of hire, inherited a team of nine Triple Play Technicians. Given the charge to grow the territory. Built the team up to 30 Technicians. Increased Field Profit Percentage by 61% (from 22% to 36%).

    • United States
    • Telecommunications
    • 1 - 100 Employee
    • Area Operations Manager
      • 2006 - 2008
    • Principal Owner/Operations Manager
      • 1995 - 2006

Education

  • John C Calhoun State Community College
    Computer and Information Systems Security/Information Assurance
    2010 - 2012

Community

You need to have a working account to view this content. Click here to join now