José Luís Tavares

Supervisor de grandes corretivos at GE Vernova
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Viana do Castelo, Viana do Castelo, Portugal, PT
Languages
  • Inglês Full professional proficiency
  • Espanhol Full professional proficiency
  • Português Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Gwo SLS - Slinger signaller
    OnRope
    Aug, 2022
    - Nov, 2024
  • Competence for LMB & Hailo Safety Ladder
    windhunter® academy Germany
    Aug, 2021
    - Nov, 2024
  • Gwo BTTS - Basic Technical Training Standard
    OnRope
    Jan, 2020
    - Nov, 2024
  • Tecnologia do processo de soldadura Mig/Mag
    ISQ
    Mar, 2016
    - Nov, 2024
  • Desenho técnico
    ENERCON
    Jun, 2011
    - Nov, 2024
  • Scada
    ENERCON
    Jun, 2011
    - Nov, 2024
  • Eletrónica, automação e comando (UFCD)
    IEFP
    Feb, 2011
    - Nov, 2024
  • Execução de caixas de média tensão
    IEP - Instituto Electrotécnico Português
    Jul, 2009
    - Nov, 2024
  • Manutenção de motoredutores
    NORD Drivesystems Pvt. Ltd.
    Apr, 2009
    - Nov, 2024
  • Bsts, Art-H, Sart-H
    Global Wind Organisation
    Aug, 2022
    - Nov, 2024
  • HWS 01 L – Operation of ladder-guided service lift TOPlift L + H200 SL-L incl. Daily Check
    Hailo Wind Systems GmbH & Co. KG
    Aug, 2022
    - Nov, 2024
  • HWS 01 R – Operation of rope-guided service lift GLOBALlift R + H200 SL-S incl. Daily Check
    Hailo Wind Systems GmbH & Co. KG
    Aug, 2022
    - Nov, 2024
  • National Safety Passport
    EMSS
    Mar, 2020
    - Nov, 2024

Experience

    • Electric Power Generation
    • 700 & Above Employee
    • Supervisor de grandes corretivos
      • Aug 2023 - Present

      Responsável pela gestão do site, O&M. Gestão das equipas mecânica e de gruas. Responsável por fazer cumprir procedimentos, regras de segurança, planos de elevação, prazos e valores da empresa. Responsável por reportar aos Project managers. Responsável pela elaboração de relatórios. Responsável pela gestão do site, O&M. Gestão das equipas mecânica e de gruas. Responsável por fazer cumprir procedimentos, regras de segurança, planos de elevação, prazos e valores da empresa. Responsável por reportar aos Project managers. Responsável pela elaboração de relatórios.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Supervisor de grandes corretivos
      • Aug 2022 - Aug 2023

      Responsável pela gestão do site, O&M. Gestão das equipas mecânica e de gruas. Responsável por fazer cumprir procedimentos, regras de segurança, planos de elevação, prazos e valores da empresa. Responsável por reportar aos Project managers. Responsável pela elaboração de relatórios. Responsável pela gestão do site, O&M. Gestão das equipas mecânica e de gruas. Responsável por fazer cumprir procedimentos, regras de segurança, planos de elevação, prazos e valores da empresa. Responsável por reportar aos Project managers. Responsável pela elaboração de relatórios.

    • Denmark
    • Wind Electric Power Generation
    • 700 & Above Employee
    • Installation Team leader/Supervisor
      • Mar 2021 - Nov 2021

      Responsável pela instalação mecânica de turbinas eólicas Enercon. Responsável pela instalação mecânica de turbinas eólicas Enercon.

    • Portugal
    • Construction
    • 300 - 400 Employee
    • Installation technician
      • Aug 2018 - Jul 2020

      Installation of wind turbines. Preparation and pre-installation work. Mechanical and electrical installation of Vestas, Senvion, GE and Nordex turbines. Main component installation work, turning gear, torque and tensioning with electrical and hydraulic tools, cable installation work, generator alignment, installation of hydraulic, mechanical and electrical systems, lock down work. Installation of wind turbines. Preparation and pre-installation work. Mechanical and electrical installation of Vestas, Senvion, GE and Nordex turbines. Main component installation work, turning gear, torque and tensioning with electrical and hydraulic tools, cable installation work, generator alignment, installation of hydraulic, mechanical and electrical systems, lock down work.

    • Portugal
    • Renewable Energy Semiconductor Manufacturing
    • Installation technician
      • Aug 2017 - Jan 2018

      Wind turbine generator installation. Installation of tower sections of Enercon towers. Wind turbine generator installation. Installation of tower sections of Enercon towers.

    • Germany
    • Renewable Energy Semiconductor Manufacturing
    • 700 & Above Employee
    • Mainteneance technician
      • Oct 2008 - Jul 2017

      Troubleshooting and prevention at industrial level. Prevention work on high power electrical systems, prevention work on paint robots, electric ovens, control and power boards. Installation of mechanical, hydraulic, pneumatic and electrical equipment. Maintenance of electrical and pneumatic tools. Electrical tool testing. Measurement and calibration of precision tools such as manual and pneumatic torque wrenches and their repair. Verification and validation of cargo equipment. Operation of overhead cranes, forklifts and lifting platforms. Metalworks. Building maintenance work. Show less

    • Portugal
    • Manufacturing
    • 700 & Above Employee
    • Maintenance technician
      • Aug 2005 - Oct 2008

      Installation and maintenance of hotel equipment. Installation of all types of coffee machines, coffee mills and accessory hotel equipment. Preventive maintenance and repair. Installation and maintenance of hotel equipment. Installation of all types of coffee machines, coffee mills and accessory hotel equipment. Preventive maintenance and repair.

    • Nigeria
    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Maintenance technician
      • Oct 2003 - Aug 2005

      Preventive maintenance of industrial BOC testing machinery. (Integrated circuits for RAM memories) Preventive maintenance of industrial BOC testing machinery. (Integrated circuits for RAM memories)

Education

  • ESTEL - Escola Profissional de Tecnologia e Eletrónica
    Técnico nível lV, Automação, Eletrónica e Computadores
    2000 - 2003

Community

You need to have a working account to view this content. Click here to join now