Jose Fernandez Hickman

Mechanical Design Engineer at S I Sealy & Associates
  • Claim this Profile
Online Presence
Contact Information
Location
Sale, England, United Kingdom, GB
Languages
  • Spanish Native or bilingual proficiency
  • English Full professional proficiency

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • IOSH Working Safely
    PJH Safety Training Ltd
    Apr, 2016
    - Sep, 2024
  • Environmental Awareness - UK
    HSS Training
    Aug, 2015
    - Sep, 2024
  • Level 2 Award in F Gas and ODS Regulations: Category I 500/5730/3
    City & Guilds
    Aug, 2014
    - Sep, 2024
  • Specialist HVACR test (RAAC)
    CITB
    Aug, 2014
    - Sep, 2024
  • Basic Offshore Safety Induction & Emergency Training including EBS (Emergency Breathing System)
    Falck Safety Services (Global)
    Nov, 2012
    - Sep, 2024
  • Helicopter Underwater Escape Training, with Emergency Breathing System (HUET + EBS)
    Falck Safety Services (Global)
    Nov, 2012
    - Sep, 2024
  • Industry Acreditation - CSCS
    Welplan Ltd
    Sep, 2014
    - Sep, 2024

Experience

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Mechanical Design Engineer
      • Apr 2021 - Present

    • Mechanical Assistant Design Engineer
      • Sep 2018 - Mar 2021

    • United Kingdom
    • Higher Education
    • 700 & Above Employee
    • PROJECT MECHANICAL INSPECTOR
      • Sep 2016 - Aug 2018

      My role as a PM inspector includes: Planning, programming, arrange and supervise new mechanical installation works across the University estate and ensure all works are designed, installed and commissioned in accordance with University standards.• Support the Principal Mechanical and Energy Engineer and the team in delivering quality mechanical installation work• Responsible for ensuring a multi facet of policies and Codes of Practices associated with mechanical installations within the built environment are implemented. Also, ensuring all activities undertaken are in accordance with Health & Safety policies and procedures, and particularly the Health & Safety at Work Act and all subordinate legislation• Work with both internal and external designers and oversee/monitor witness testing duties including water/air measurement and HVAC systems controls• Manage activities such us; coordination of testing, commissioning activities and installation sequences. I also co-ordinate and program Continuous Professional Development (CPD) and Lunch Seminars for my team.http://www.estates.manchester.ac.uk/services/psu/

    • Mechanical Maintenance Building Services Technician
      • Mar 2015 - Sep 2016

      As a Mechanical Maintenance Technicians will carry out maintenance work on all the University’s premises to include, but not restricted to, Mechanical installations, Mechanical equipment, mechanical plant and associated controls, limited plumbing services, all to a level of competence which is proven and/or to a level of training which has been certificated and proven.Assist all grades of Building Services Technicians in the full range of installation, improvement and maintenance activities on Mechanical and HVAC/Steam Boiler plant.Contribute to the development of a customer focused service, with a view to improving, enhancing and promoting the status of the Directorate of Estates and Facilities by establishing and maintaining working relationships throughout the UniversityContribute in the development and implementation of efficient, cost-effective working practices and quality service standards to improve and enhance the provision of an effective maintenance service to ensure the highest achievable standard, demonstrating value for moneyEnsure all activities undertaken by you and or people working in conjunction with you are carried out in accordance with the requirements of the University and Directorate Health & Safety policies and procedures, and particularly the Health & Safety at Work Regulations and all subordinate legislation

    • United States
    • Facilities Services
    • 700 & Above Employee
    • Mechanical - Heating Engineer
      • Aug 2014 - Mar 2015

      Preventive/Reactive PPM maintenance of industrial heating, ventilation and air-conditioning systems such as Fan Coils, Air Handling Unit, Plant Room checks.Ensure all activities undertaken by you and or people working in conjunction with you are carried out in accordance with the requirements of the Company Health & Safety policies and procedures, and particularly the Health & Safety at Work Regulations and all subordinate legislation

    • Wholesale Import and Export
    • Independent Professional
      • Jan 2014 - Jul 2014

      Structural DrawingsPersonal and professional improvement in areas such CAD system Solidworks 2014New Technology

    • Italy
    • Engineering Services
    • 700 & Above Employee
    • Mechanical Maintenance Engineer, HVAC Department
      • Oct 2012 - Nov 2013

      The Offshore Mechanical Maintenance Engineer HVAC Department is required to work onboard SAIPEM vessels worldwide under a rotation of 2 months offshore, and 1 month rest.Report to the offshore Chief Engineer when offshore. On the vessel, it is required to work 12 hour shifts and provide engineering assistance during vessel operations and sailing to Chief Engineer and Engine Control Room (ECR) shall ensure engineering reviews of documents, prepare detailed maintenance task plan to execute the work in a safe manner, advise best practices, ensure operations are executed in accordance with the plan and procedures.On board the Castorone, with accommodation to up to 702 crew Pipelay VesselMechanic Foreman for the HVAC Department. This Department is involved on the preventive and corrective maintenance of the Air Conditioning and Ventilation systems of the Vessel such as Fan Coils, Air Handling Units, Splits, Chillers. Creation of Material Request, and follow the Request until the order is placed, purchased and received on the Vessel. Minimize the equipment breakdown Also, as part of the job, I have to take care of the acclimatization for the accommodation area, large working areas like Engine Room, Switch Board Room HV Transformers /LV Switchgear (including Data Centre PDU’s) , cranes and Crane Switch Board Room, in order to keep each area under the temperature requirement. All the maintenance is monitored following the maintenance with the Computerized Maintenance Management System AMOSTeam work coordination, creation of Permit to work and Job Safety Analysis•Using AMOS to create short/long term schedules•Reading technical drawings for all equipment•Communicating with onsite engineers such as First Engineer and/or Chief Engineer when problem solving•Planning and executing work•Preventative and reactive maintenance

    • Poland
    • Restaurants
    • 1 - 100 Employee
    • Waiter
      • May 2012 - Oct 2012

    • Waiter
      • Aug 2011 - May 2012

    • Spain
    • Software Development
    • 1 - 100 Employee
    • HVAC Technician Installation and Maintenance
      • Oct 2009 - Jun 2011

      Installation and preventive/corrective maintenance of industrial heating, ventilation and air-conditioning systems As part of the team, As a part of the team we were responsible of the installation and maintenance of industrial, heating, ventilation and air-conditioning systems such as Fan Coils, Air Handling Unit, Splits all around the Hospital Ramon y Cajal premises.

    • Netherlands
    • Architecture and Planning
    • 1 - 100 Employee
    • Management Associate
      • Nov 2008 - Sep 2009

      Definition and monitoring of reform projects and interventions in construction. I was working as a partner in a small company doing the definition and monitoring of reform projects and interventions in construction Control, and reception of material and work tools. Management of work force

    • Spain
    • Construction
    • 1 - 100 Employee
    • Installation Supervisor
      • May 2007 - Aug 2008

      Godur Andalucia is a small company which installation of non-slip flooring systems, self-levelling, anti static, decorative epoxy resin, cements mortar, and polyurethanes are his main workload. I joined the team for a year and my role was supervised different jobs, all of them in Andalucia

    • Assistant Manager
      • Feb 2004 - Feb 2007

      After finishing my degree, I started to work at this company as assistant manager. Transporte San Luis de Lara is engaged in the distribution of fuel to gas stations in Lara. My work, among others, involved coordination and oversight of the operation and preventive and corrective maintenance of fuel transport trucks, and representing the company interests in many areas such as: public associations, governmental institutions.

    • Project Engineer, Industrial Placement
      • Sep 2003 - Apr 2004

      Performing various tasks related with the last year university course Plans for improving quality, safety and health, budgeting, development of maintenance manuals Production supervisor deputy supervisor of production for quality control of spare parts for production chain for Coca Cola FEMSA Venezuela deputy supervisor of production for quality control of spare parts for production chain for OSTER Venezuela

Education

  • Brunel University London
    with Sustainable Energy, Master of Science in Building Services with Sustainable Energy
    2016 - 2020
  • University of Liverpool
    IELTS - Academic Version, English, IELTS - Academic Version, English
    2016 -
  • Universidad Politécnica de Madrid
    Bachelor's Degree, Industrial Technical Engineering Mechanics Speciality
    -
  • Universidad Fermín Toro
    Bachelor's Degree, Mechanical Engineering
    1999 - 2004
  • Deusto Formacion
    ISO course, Quality Control Technology/Technician
    2009 - 2010
  • Grupo Euroinnova
    Course Autocad V,2008 2D and 3D, Architectural Drafting and Architectural CAD/CADD
    2009 - 2010
  • San Vicente de Paul
    -

Community

You need to have a working account to view this content. Click here to join now