Josean J. Velez

Plant Manager at Cummings Resources
  • Claim this Profile
Contact Information
Location
Enterprise, Alabama, United States, US
Languages
  • English Full professional proficiency
  • Spanish Native or bilingual proficiency

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
AnnMarie Cross

I had the great pleasure of hiring Josean Velez to join the Watchfire team as a new graduate. Josean was everything I strive to find -- inquisitive, analytical, passionate, AND a people person to boot! As the head of HR during his tenure, I greatly enjoyed watching Josean develop and grow his talents. I found him to be an exceptional engineer with a real drive to understand the people in his challenges first and foremost. I gladly recommended Josean for his promotion to supervision, and enjoyed interacting with him as he grew in that position as well. Josean is an exceptional employee at every level. I wish him all the best in his future positions and would gladly provide further information if desired.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Six Sigma Green Belt
    Sigma Dynamics, LLC
    May, 2017
    - Sep, 2024
  • Occupation Completion Point A – Electrical Helper (300 Hours)
    -
    May, 2010
    - Sep, 2024
  • Occupation Completion Point B – Residential Electrician (450 Hours)
    -
    May, 2010
    - Sep, 2024
  • Occupation Completion Point C – Commercial Electrician (450 Hours)
    -
    May, 2010
    - Sep, 2024

Experience

    • United States
    • Construction
    • 1 - 100 Employee
    • Plant Manager
      • Oct 2021 - Present
    • United States
    • Appliances, Electrical, and Electronics Manufacturing
    • 400 - 500 Employee
    • Engineering Manager
      • Mar 2018 - Oct 2021
    • Production Supervisor
      • Apr 2017 - Mar 2018

    • Manufacturing Engineer
      • May 2015 - Apr 2017

    • Project Specialist II
      • Jun 2014 - May 2015

      •Improved customer satisfaction by providing domestic and international customers with bilingual technical support in Spanish and English. •Support proprietary billboard operation software, account manager and users. •Improved documentation by submitting new monthly troubleshooting articles. •Schedule service providers to repair billboards within 8 hours of a reported issue. •Provide technical troubleshooting of components to minimize repair time and cost of dispatch. •Served as… Show more •Improved customer satisfaction by providing domestic and international customers with bilingual technical support in Spanish and English. •Support proprietary billboard operation software, account manager and users. •Improved documentation by submitting new monthly troubleshooting articles. •Schedule service providers to repair billboards within 8 hours of a reported issue. •Provide technical troubleshooting of components to minimize repair time and cost of dispatch. •Served as a Project Manager for a new billboard customer order valued at $200k, coordinating with electrical, structure and installation companies to complete requirements of the project two weeks before installation. •Used AutoCAD to create electrical schematics provided to customer in order to reduce the chances of an installation delay due to an electrical service issue. •Managed a 4 month Lamar Advertising controller upgrade project. •Directed a CBS conversion project for 5 LED billboards, coordinating the logistics of parts and availability of technicians for installation, all valued at $50k.

    • Ireland
    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Industrial Engineering Intern
      • Feb 2013 - May 2014

      •Performed time studies that identified and eliminated waste. •Shadowed plant supervisors to reduce the number of redundant steps in their daily tasks. •Presented data through graphs and presentations to illustrate areas of highest opportunity. •Created standard work instructions for use of management and machine operators. •Generated lockout/tagout procedures for all plant machinery to comply with OSHA standards. •Updated and monitored chemical inventory to fulfill OSHA’s hazard… Show more •Performed time studies that identified and eliminated waste. •Shadowed plant supervisors to reduce the number of redundant steps in their daily tasks. •Presented data through graphs and presentations to illustrate areas of highest opportunity. •Created standard work instructions for use of management and machine operators. •Generated lockout/tagout procedures for all plant machinery to comply with OSHA standards. •Updated and monitored chemical inventory to fulfill OSHA’s hazard communication standard. •Implemented 5s practices in production areas as assigned, optimizing productivity and 5s scores. •Participated in the collection of data to project savings of $100,000 in energy conservation. •Provided daily support and assistance to managers and engineers. •Managed and completed safety and production projects under a limited budget. •Communicated effectively with all levels of the organization, outside vendors and contractors. Show less •Performed time studies that identified and eliminated waste. •Shadowed plant supervisors to reduce the number of redundant steps in their daily tasks. •Presented data through graphs and presentations to illustrate areas of highest opportunity. •Created standard work instructions for use of management and machine operators. •Generated lockout/tagout procedures for all plant machinery to comply with OSHA standards. •Updated and monitored chemical inventory to fulfill OSHA’s hazard… Show more •Performed time studies that identified and eliminated waste. •Shadowed plant supervisors to reduce the number of redundant steps in their daily tasks. •Presented data through graphs and presentations to illustrate areas of highest opportunity. •Created standard work instructions for use of management and machine operators. •Generated lockout/tagout procedures for all plant machinery to comply with OSHA standards. •Updated and monitored chemical inventory to fulfill OSHA’s hazard communication standard. •Implemented 5s practices in production areas as assigned, optimizing productivity and 5s scores. •Participated in the collection of data to project savings of $100,000 in energy conservation. •Provided daily support and assistance to managers and engineers. •Managed and completed safety and production projects under a limited budget. •Communicated effectively with all levels of the organization, outside vendors and contractors. Show less

    • IT Services and IT Consulting
    • 1 - 100 Employee
    • Industrial Engineering Intern
      • Sep 2012 - Aug 2013

      •Utilized HOMER optimization modeling software to provide customers with cost effective and reliable micro-grids. •Combined multiple power sources to create micro grid systems and test feasibility of new technology in domestic and international locations. •Organized weekly meetings establishing deadlines to facilitate the timely completion of projects. •Compiled outcomes used in presentations directed to Jabil’s Supply Chain team, illustrating cost and profit used to make investment… Show more •Utilized HOMER optimization modeling software to provide customers with cost effective and reliable micro-grids. •Combined multiple power sources to create micro grid systems and test feasibility of new technology in domestic and international locations. •Organized weekly meetings establishing deadlines to facilitate the timely completion of projects. •Compiled outcomes used in presentations directed to Jabil’s Supply Chain team, illustrating cost and profit used to make investment decisions. Show less •Utilized HOMER optimization modeling software to provide customers with cost effective and reliable micro-grids. •Combined multiple power sources to create micro grid systems and test feasibility of new technology in domestic and international locations. •Organized weekly meetings establishing deadlines to facilitate the timely completion of projects. •Compiled outcomes used in presentations directed to Jabil’s Supply Chain team, illustrating cost and profit used to make investment… Show more •Utilized HOMER optimization modeling software to provide customers with cost effective and reliable micro-grids. •Combined multiple power sources to create micro grid systems and test feasibility of new technology in domestic and international locations. •Organized weekly meetings establishing deadlines to facilitate the timely completion of projects. •Compiled outcomes used in presentations directed to Jabil’s Supply Chain team, illustrating cost and profit used to make investment decisions. Show less

    • Industrial Engineering Intern
      • May 2012 - Sep 2012

      •Provided manufacturing engineers with results of time studies, used in team meetings to generate standard work time and identify cycle times. •Assisted in corporate safety programs, resulting in the reduction of employee blood lead levels. •Used AutoCAD software to remodel the tool room to increase storage capacity and inventory. •Collected battery lead straps to provide quality control with thickness data used to design experiments in order to find the root cause of the excess in… Show more •Provided manufacturing engineers with results of time studies, used in team meetings to generate standard work time and identify cycle times. •Assisted in corporate safety programs, resulting in the reduction of employee blood lead levels. •Used AutoCAD software to remodel the tool room to increase storage capacity and inventory. •Collected battery lead straps to provide quality control with thickness data used to design experiments in order to find the root cause of the excess in thickness. Show less •Provided manufacturing engineers with results of time studies, used in team meetings to generate standard work time and identify cycle times. •Assisted in corporate safety programs, resulting in the reduction of employee blood lead levels. •Used AutoCAD software to remodel the tool room to increase storage capacity and inventory. •Collected battery lead straps to provide quality control with thickness data used to design experiments in order to find the root cause of the excess in… Show more •Provided manufacturing engineers with results of time studies, used in team meetings to generate standard work time and identify cycle times. •Assisted in corporate safety programs, resulting in the reduction of employee blood lead levels. •Used AutoCAD software to remodel the tool room to increase storage capacity and inventory. •Collected battery lead straps to provide quality control with thickness data used to design experiments in order to find the root cause of the excess in thickness. Show less

    • United States
    • Higher Education
    • 700 & Above Employee
    • Project Manager Assistant
      • Aug 2010 - May 2012

      •Generating project quotes and estimations for subcontractors. •Proficient in meetings and setting deadlines, developing and planning methods for computerizing variety of business tasks. •Communicating and submission of project related information to project contractors. •Developed problem solving and optimum troubleshooting abilities. •Generating project quotes and estimations for subcontractors. •Proficient in meetings and setting deadlines, developing and planning methods for computerizing variety of business tasks. •Communicating and submission of project related information to project contractors. •Developed problem solving and optimum troubleshooting abilities.

Education

  • University of South Florida
    Bachelor of Science (BS), Industrial Engineering
    2010 - 2014
  • Professional and Technical High School
    Electrical Helper Certification, Residential Electrician Certification, Commercial Electrician, Electrical Wiring
    2006 - 2010

Community

You need to have a working account to view this content. Click here to join now