Jose Juan Piñon Chavez

Senior Logistics Manager at Brembo México S.A.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Saltillo, Coahuila, Mexico, MX

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Mexico
    • Motor Vehicle Manufacturing
    • 100 - 200 Employee
    • Senior Logistics Manager
      • May 2022 - Present

    • China
    • Motor Vehicle Manufacturing
    • 700 & Above Employee
    • Senior Materials Manager
      • Jul 2019 - Feb 2022

      Responsibilities, · Manage and plan production schedules daily for Molding Injection and Trim subassembly processes · Responsible for Buildout(end of model year truck), launch of new model, annual physical inventory, system initialization · Responsible for departmental operative KPI's · Responsible to meet monthly targets for Inventory and Premium Freight(Cost$) · Develop Six Sigma and Lean Manufacturing projects based on Cost saving · 5S’s project leader to maintain the operational areas Achievements, · Reduced inventory levels from $9.3 M usd to $3.2 M usd, by analyzing the highest items and take specific actions for each one · Developed saving projects on molding injection machines, with an amount of $450 K usd by eliminating the use of cardboard and redefining standard pack, · Reduced line shutdown from 5 hours to 20 minutes per week by re design materials routings, training the personnel and implementing a material pull system · Reduced the monthly transportation cost from $50 K to less than $5 K usd Show less

  • Chrysler de México
    • Saltillo, Coahuila de Zaragoza, México
    • Planning, Timing & Control Manager
      • Nov 2012 - Jul 2019

      Responsibilities, · Participate with plant Management staff to review Safety, Cost, and Operations KPI’s on a daily frequency · Manage and plan production schedules for Assembly, Body in White and Painting plants, · Projects implementation using the World Class Manufacturing(WCM) methodology, VSM, Lean Manufacturing, Continuous Improvement · Responsible for the complete Supply Chain Management from the suppliers until delivery of material at the plant, 1013 trucks produced per day, $27 M usd worth of daily incoming material, · Managing 20 administrative and 40 team members Achievements, · High performance team to support the increase production from 38 to 45 trucks per hour · Implementation of electronic KanBan, eliminate on 85% the starving of the assembly line · Transportation savings by $800 K usd, by re arrange the milk runs on US carriers · VSM project implementation with local suppliers to improve the flow of incoming trucks and reduced inventory, estimated savings of $300 K usd · Cero line shutdown and cero parts missing during the phase in/out of the year model change · Developed strategies to maintain minimum inventory levels of productive material and spare parts Show less

  • Stabilus de Mexico
    • Saltillo, Coahuila de Zaragoza, México
    • Senior Materials Manager
      • Jul 2010 - Nov 2012

      Responsibilities, · Responsible to generate the Master Production Schedule based on customer’s demand, · Generate the plant capacity report to determine actions, such as increasing\decreasing manning, overtime, · Generate daily production schedule for 11 production lines · In charge of the Supply Chain operations to support the customers’ requirements · System used: SAP · Managing, 10 Salary and 36 Team members Achievements, · Reduced line shutdown due to lack of inhouse fabricated components by keeping a safety stock through scheduling · Implemented KanBan process to reduce line shutdown due to starving material · Accomplished 100% scorecard on OEM on time delivery Show less

  • Metalwork & Stamping S.A de C.V.
    • Saltillo, Coahuila de Zaragoza, México
    • Materials & Operations Manager
      • Jun 2007 - Jun 2009

      Responsibilities, · Responsible of Supply Chain process, (Materials Planning for galvanized steel requirements 6 months forecast), · Responsible to generate Production reports (OEE, down time, delivery performance, cost per project) · In charge of generating the plant capacity report and to balance production lines to maximize resources available. · In charge of Production, Maintenance and Tooling departments · Team leader of Lean and Six sigma projects · Managing 15 administrative and 260 team members Achievements, · Implemented Lean and Six sigma projects to improve production on the welding cells by reducing waste in the process · 100% of the projects delivered on time at customer requirements, · Improved production on press area by implementing a conveyor, used as a manual tandem Show less

  • Mabe S.A de C.V
    • Saltillo, Coahuila de Zaragoza, México
    • Senior Materials Manager
      • Jun 2005 - Jul 2007

      Resonsibilities, · Planned, organized and controlled production for 3 plants: Washer machine assembly, Aluminum gas burners injection and Gears for Washer machines. · Owned the plant metrics, Fill Rate, Service Call Rate, Mix/Volume · Owned 2 warehouses of raw and direct material, target: To maintain minimum stock levels with a reliability of 98%, method used, cyclic counts. · Managed 52 personnel distributed on 3 plants. · Lean Manufacturing and Six Sigma knowledge, also expertise with MRP systems (BaaN V, MAPICS, MES) Show less

  • General Electric (EDESA)
    • Saltillo, Coahuila de Zaragoza, México
    • Master Production Scheduler
      • Jun 2002 - Jul 2005

      Responsibilities, · In charge of the production schedule for 24 production lines based on the orders received from customers · Responsible to lead daily meetings with purchasing, quality, engineering and warehouse departments · Responsible to maintain optimal stock level of items (Fill Rate) for more than 250 end catalogs in two USA warehouses · Responsible for shipping area, coordinating 6 daily outbound trucks to warehouses located in USA · Reduced on 80% the critical orders shown on the critical list report; $5K on critical; 5 items on List; 5 days in transit Show less

  • Magna Powetrain
    • Atlanta, Georgia, Estados Unidos
    • IT Manager
      • Mar 1998 - Jun 2002

      Responsibilities, · Implemented XPPS MRP system modules: Finance, Logistics, Production, Materials, EDI with suppliers, under AS/400. · PMS (Production Manufacturing System) administrator · FLEX system administrator, access daily production schedule from General Motors located in Doraville (Atlanta, GA · Broadcast system administrator for GM plants in Warren MI, Doraville GA, Ramos Arizpe Mx Responsibilities, · Implemented XPPS MRP system modules: Finance, Logistics, Production, Materials, EDI with suppliers, under AS/400. · PMS (Production Manufacturing System) administrator · FLEX system administrator, access daily production schedule from General Motors located in Doraville (Atlanta, GA · Broadcast system administrator for GM plants in Warren MI, Doraville GA, Ramos Arizpe Mx

Education

  • Instituto Tecnológico de Saltillo
    Ingeniero en Sistemas Computacionales, Tecnología de la información
    1990 - 1995

Community

You need to have a working account to view this content. Click here to join now