Jorge Luis Villegas Albis

at SINOHYDRO CORPORATION LIMITED - SUCURSAL BOLIVIA
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Bolivia, BO

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Bolivia
    • Construction
    • 100 - 200 Employee
      • Dec 2022 - Present

      Construction of the IVIRIZU hydroelectric plant, located in the department of Cochabamba, Bolivia.For the construction contract, it has been divided into 4 groups, of which we are in charge of Group II: SEHUENCAS and JUNTAS adduction tunnels, SEHUENCAS collection tower, JUNTAS water intake, access roads, supply, assembly and start-up of hydromechanical equipment and installations associated with the SEHUENCAS and JUNTAS and complementary works of the IVIRIZU hydroelectric projectThe hydroelectric project IVIRIZU (PHI) will have a production of 280 megawatts of electricity (SEHUENCAS with 189 MW and JUNTAS with 91 MW), that will be intregrated to the national system of Bolivia (SIN), the project will require an investment of 550 million dollars. Show less

      • Nov 2017 - Nov 2022

      Construction of the IVIRIZU hydroelectric plant, located in the department of Cochabamba, Bolivia.For the construction contract, it has been divided into 4 groups, of which we are in charge of Group II: SEHUENCAS and JUNTAS adduction tunnels, SEHUENCAS collection tower, JUNTAS water intake, access roads, supply, assembly and start-up of hydromechanical equipment and installations associated with the SEHUENCAS and JUNTAS and complementary works of the IVIRIZU hydroelectric projectThe hydroelectric project IVIRIZU (PHI) will have a production of 280 megawatts of electricity (SEHUENCAS with 189 MW and JUNTAS with 91 MW), that will be intregrated to the national system of Bolivia (SIN), the project will require an investment of 550 million dollars. Show less

    • Spain
    • Civil Engineering
    • 1 - 100 Employee
    • Waterworks Engineer (Civil Supervisor)
      • Nov 2015 - Nov 2017

      The hydroelectric project San Jose (PHSJ) will have a production of 124.9 megawatts of electricity (San José with 55 MW and San José 2 with 69 MW), that will be intregrated to the national system of Bolivia (SIN), the project will require an investment of 252 million dollars. The hydroelectric project San Jose is possibly the most beneficial Hydroelectric Project for the interests of the country, as does the use of water turbinate prov: - Hydroelectric power stations; San Jose 1 (55 MW) and San Jose 2 (69 MW) - Tunnels (16 Km) - Reservoirs regulation; Aguas Claras (130,000 m3) and Miguelito (35,000 m3) - Roads (35 Km) - Electrical substations and transmission line Show less

    • Bolivia
    • Renewable Energy Semiconductor Manufacturing
    • 100 - 200 Employee
    • Construction Engineer (Civil Supervisor)
      • May 2015 - Oct 2015

      The Transportadora de Electricidad S.A. provides continuity with project supervision at the hydroelectric project Misicuni Misicuni is a project of great importance for the department of Cochabamba which form the hydroelectric project to generate energy not only conventional but also renewable. The Renewable Energy Hydroelectric Project Misicuni (PHM) is part of Project Multiple Misicuni. It aims to hydraulic utilization of the waters of the dam Misicuni, which will trasvasadas through the tunnel of 20 km and will provide an estimated 3.2 (m3/s) annual average flow. The PHM includes: - Extension of the existing tunnel at 700 (m) - Steel pipe pressure of 1.6 (m) in diameter and 3,800 (m) length - House of machines - Compensation reservoir 7 (ha) located next to the power plant - Electric Substation and transmission line at high voltage. Show less

    • Canada
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Construction Engineer (Civil Supervisor)
      • Dec 2014 - May 2015

      The hydroelectric project Misicuni will have a production of 120 megawatts of electricity, and will be intregrated to the national siytem of Bolivia (SIN), the project will require an investment of 137 million dollars. Misicuni is a project of great importance for the department of Cochabamba which form the hydroelectric project to generate energy not only conventional but also renewable. The Renewable Energy Hydroelectric Project Misicuni (PHM) is part of Project Multiple Misicuni. It aims to hydraulic utilization of the waters of the dam Misicuni, which will trasvasadas through the tunnel of 20 km and will provide an estimated 3.2 (m3/s) annual average flow. The PHM includes: - Extension of the existing tunnel at 700 (m) - Steel pipe pressure of 1.6 (m) in diameter and 3,800 (m) length - House of machines - Compensation reservoir 7 (ha) located next to the power plant - Electric Substation and transmission line at high voltage. Show less

  • Sugar Company San Buenaventura EASBA
    • San Buenaventura, La Paz, Bolivia
    • Civil Works Specialist - Fiscal of Civil Construction
      • Feb 2014 - Nov 2014

      "Engineering, Procurement, Construction, Installation and Commissioning of Industrial Plant Sugar and Sugar Derivatives Company San Buenaventura" $ 174 million dollars in the sugar project in San Buenaventura based in San Buena Ventura in the department of La Paz. Job Purpose: Perform functions and duties related to the area of competence concerning the audit for the implementation of pilot, industrializadora plant and related works, as may be assigned by the immediate superior or the industrial manager (fiscal general). Propose and / or approve as appropriate, amendments to the technical specifications, design or details of the work that may lead to changes in volumes or amounts of budgets and can complement the technical and economic justification for the change order if will be necesary. Check the technical specifications or terms of reference for monitoring the execution of works, infrastructure and services according to the requirements and projections or payment certificates. Require to the contractor oversight the technical documents required to process the payment certificates. Show less

  • Tucons SRL
    • Cochabamba, Bolivia
    • Resident Engineer - Civil Engineer
      • Dec 2013 - Feb 2014

      "Sacta Fruit Processing Plant" Design, Engineering, Construction and Installation of the food processing plant at a cost of 1.4 million U.S. dollars, located in the province of Chapare, Cochabamba. Job Purpose: Participation in the design, structural analysis and presentation of the technical proposal for final approval and implementation of the construction phase. "Sacta Fruit Processing Plant" Design, Engineering, Construction and Installation of the food processing plant at a cost of 1.4 million U.S. dollars, located in the province of Chapare, Cochabamba. Job Purpose: Participation in the design, structural analysis and presentation of the technical proposal for final approval and implementation of the construction phase.

    • Peru
    • Construction
    • 200 - 300 Employee
    • Project Control
      • Jun 2012 - Dec 2013

      “ Toromocho Mining Project” 4800 Million Dollars Mining Project in Toromocho Area northern Lima Peru. SERPETBOL is a direct contractor for JACOBS. The contract is Miscellaneous type (Mechanical, Pipping, Civil and Electrical). Functions to meet: • Develop or update project plans specifying information such as project objectives, technologies, systems, information specifications, programs, funds and personnel. • Manage projects to ensure compliance with the budget, planning and scope. • Prepare project status reports by collecting, analyzing for the summary information and trends. • Coordinate the recruitment and selection of project staff. • Develop and manage annual budgets for projects of the company. • Develop implementation plans that include cost-benefit analysis or return on investment. Show less

  • BARTOS & CIA Construction Company.
    • “ Paving Construction Chaquimayu - Quintanilla ", Cochabamba Bolivia
    • Soil Laboratory Manager
      • Jul 2006 - Aug 2007

      "Paving Construction Chaquimayu - Quintanilla" Where was performed: -Construction of the embankment -Conformation subbase layer, base layer -Diluted bitumen production and priming. -Production and asphalt concrete placed. "Paving Construction Chaquimayu - Quintanilla" Where was performed: -Construction of the embankment -Conformation subbase layer, base layer -Diluted bitumen production and priming. -Production and asphalt concrete placed.

Education

  • San Simon University
    Degree in Civil Engineering, Civil Structural Engineering
    2006 - 2010
  • Del Valle University
    Construction Management Diplomaed, Construction Management
    2010 - 2010
  • Instituto Boliviano de Normalización y Calidad - IBNORCA
    Specialist in Environmental Management Systems NB/ISO 14001:2008, ISO 14001:2008
    2011 - 2011
  • Instituto Boliviano de Normalización y Calidad - IBNORCA
    Specialist in Quality Management Systems NB/ISO 9001:2008, ISO 9001:2008
    2011 - 2012
  • UNPRG- Facultad de Ingeniería Mecánica y Eléctrica
    Specialization in Welding and Cutting Processes
    2010 - 2011
  • Universidad de Ciencias Administrativas y Tecnológicas UCATEC
    "Higher Education - Teaching Mention" Diplomaed, Teaching
    2012 - 2013
  • Centro Empresarial Latinoamericano CEMLA
    "Management of Occupational Health and Safety" Diplomaed, ISO 18001:2007
    2012 - 2013

Community

You need to have a working account to view this content. Click here to join now