Jordy Watson, PMP, P.E.

Consultant - Project Controls at Sand Hill, Inc.
  • Claim this Profile
Contact Information
Location
Atlanta Metropolitan Area, US

Topline Score

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 2 ratings
  • (2)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

You need to have a working account to view this content. Click here to join now
Adrian Saldanha, P.E, PMP

I worked with Jordy for three years during his time at PCL. I found Jordy to be a big picture thinker who is adept at connecting strategies with processes efficiently and effectively. Jordy is detail oriented and understands the importance of comprehensively evaluating wastage that can lead to savings. Outside of work, I found Jordy to be team oriented, taking the time to know his coworkers and build deeper working relationships. Overall, I would recommend Jordy for any Project/Program Management work and hope to work with him again in the future.

Michael Schoor

Jordy is a diligent and caring person who brings his personal humanity to all he does in his career.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Shutdown Turnaround Optimization
    IDCON INC
    Mar, 2020
    - Sep, 2024
  • Professional Engineer
    Georgia Board of Professional Engineers and Land Surveyors
    Mar, 2018
    - Sep, 2024
  • Project Management Institute
    Associated Builders and Contractors
    Dec, 2016
    - Sep, 2024
  • Engineer in Training
    Texas Board of Professional Engineers
    Jun, 2012
    - Sep, 2024
  • Project Management Professional
    Project Management Institute
    Dec, 2015
    - Sep, 2024

Experience

    • United States
    • Business Consulting and Services
    • 1 - 100 Employee
    • Consultant - Project Controls
      • Aug 2017 - Present

      Project controls and business process improvement consulting for global leader in the Paper and Packaging Industry. Deployed to Major Projects to identify and implement processes contributing to the overall maturity of the project management approach, methodology and strategy. Entrusted with driving an organizational culture of enhanced project execution. Project controls and business process improvement consulting for global leader in the Paper and Packaging Industry. Deployed to Major Projects to identify and implement processes contributing to the overall maturity of the project management approach, methodology and strategy. Entrusted with driving an organizational culture of enhanced project execution.

    • Canada
    • Construction
    • 700 & Above Employee
    • Proposal Manager
      • Dec 2016 - Jul 2017

      Located in the district office, responsible for management of various proposals from receipt of proposal package through submission, post bid clarifications and negotiations, and turnover/initial setup with the operations team.

    • Project Controls Manager
      • May 2015 - Dec 2016

      The Westlake Petro 1 Expansion project, located in Lake Charles, LA, involves three areas of an existing ethylene unit. The scope of work includes installation and demolition of structural steel, mechanical equipment, and process piping during both pre-turnaround and turnaround phases of the overall expansion.

    • Lead Engineer
      • Jul 2014 - Apr 2015

      Wacker Polysilicon Poly 11- Charleston,TNThis new polysilicon plant, located in Charleston, Tennessee, will serve the solar and computer industries and will be one of the largest producers of hyperpure polysilicon in North America. PCL’s scope of work consists of mechanical, piping, electrical and instrumentation procurement, and installation of the plant’s major process areas, including those for distillation, generation and recovery of hydrochloric acid, tank farm, conversion, scrubber, cleaning, hydrogen recovery, and carbon monosulfide reaction.

    • Piping Field Engineer
      • Apr 2013 - Jul 2014

      Progress Energy Mayo FGD Wastewater ZLD-Roxboro, North CarolinaPCL is the general contractor responsible for the construction, installation and services required to build a Zero Liquid Discharge (ZLD) facility for Progress Energy Carolinas in their existing Mayo Plant near Roxboro, NC. The scope of work includes all civil, structural, mechanical, piping, and electrical work as well as the management of the owner’s pre-engineered building contractors.

    • QA/QC Coordinator
      • May 2012 - Apr 2013

      Enbridge Ajax Gas Plant-Wheeler,TXThe Enbridge Ajax Gas Processing Plant in Wheeler, Texas, is a cryogenic natural gas processing plant with a capacity of 150 million cubic feet per day. The new plant is designed to extract natural gas liquids and produce pipeline-quality natural gas from wellhead-quality natural gas streams. PCL Industrial Construction Co. (PICCo) installed all structural steel, equipment, piping, and electrical work, including switchgear and transformers, and more than 16,000 linear feet of cable tray and 280,000 linear feet of cable and wire.

    • Field Engineering Intern
      • May 2011 - May 2012

      Motiva Crude Expansion Project-Port Arthur,TXThe Crude Expansion Project (CEP) will increase current capacity at the Port Arthur Refinery from 275,000 barrels to day to more than 600,000 barrels per day, making it the largest refinery in the U.S. and one of the top 10 in the world. The OSBL packages are the portion of the project that connects the existing plant to the new hydrocarbon processing units and provides additional infrastructure capacity for the increase in production.

    • Oil and Gas
    • 1 - 100 Employee
    • Project Controls Intern
      • Jul 2008 - Aug 2010

      Golden Pass LNG Project-Sabine Pass,TXCB&I has complete EPC responsibility for the terminal, which will have an import capacity to process 15.6 million tons per year (MTA) of LNG, which is equivalent to approximately 2 billion cubic feet per day of natural gas. The project includes two ship unloading berths; five full-containment LNG storage tanks, each with a capacity of 155,000 cubic meters; a regasification and sendout system; and related ancillary buildings and systems. Golden Pass LNG Project-Sabine Pass,TXCB&I has complete EPC responsibility for the terminal, which will have an import capacity to process 15.6 million tons per year (MTA) of LNG, which is equivalent to approximately 2 billion cubic feet per day of natural gas. The project includes two ship unloading berths; five full-containment LNG storage tanks, each with a capacity of 155,000 cubic meters; a regasification and sendout system; and related ancillary buildings and systems.

Education

  • Lamar University
    B.S.C.E., Civil Engineering
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now