Jordan Brown
Quality Control Manager at Professional Wind Services- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Credentials
-
Vestas level D installation
VestasJun, 2022- Sep, 2024 -
RUK/GWO FIRE AWARENESS SAFETY TRAINING
-Jan, 2018- Sep, 2024 -
Siemens level 4
Siemens GamesaAug, 2017- Sep, 2024 -
OPITO BANKSMAN AND SLINGER STAGE 1
OPITOMar, 2020- Sep, 2024 -
RUK/GWO FIRST AIDS
-Feb, 2017- Sep, 2024 -
RUK/GWO MANUAL HANDLING TRAINING
-Feb, 2017- Sep, 2024 -
RUK/GWO SAFETY TRAINING SEA SURVIVAL MODULE
-Feb, 2017- Sep, 2024 -
RUK/GWO WORKING AT HEIGHTS AND RESCUE TRAINING
-Feb, 2017- Sep, 2024 -
EMERGENCY FIRST AIDS TRAINING
-Feb, 2017- Sep, 2024 -
ABRASIVE WHEELS TRAINING
-May, 2018- Sep, 2024 -
Electrical safety v5
-Jan, 2018- Sep, 2024 -
QA LEVEL TWO FIRST AIDS OUTDOOR TRAINING
-May, 2018- Sep, 2024 -
ACCESS TO SUB STATION & SWITCH ROOM ELECTRCIAL
- -
BTT technical training
Windhoist Ltd -
CCNSG client/contractor national safety group passport
ECITB -
Chester step test
- -
HUET under water training
- -
Siemens gamesa technical training
- -
Slinger/Banksman
-
Experience
-
Professional Wind Services
-
Australia
-
Services for Renewable Energy
-
1 - 100 Employee
-
Quality Control Manager
-
Oct 2022 - Present
-
-
-
REMO
-
Advertising Services
-
1 - 100 Employee
-
QA/QC Manager
-
Jan 2022 - Aug 2022
Quality assurance & inspections on EnVentus Vestas V162 platforms.Arranging and completing internal & external walk downs & handovers with clientsAll reporting of NCR's and time delays relating to projects. Quality assurance & inspections on EnVentus Vestas V162 platforms.Arranging and completing internal & external walk downs & handovers with clientsAll reporting of NCR's and time delays relating to projects.
-
-
-
RWE Renewables
-
Germany
-
Renewables & Environment
-
100 - 200 Employee
-
Commissioning Offshore technician
-
Feb 2021 - Jan 2022
Commissioning Vestas V164 9.5MW WTG on 90 offshore platforms on Triton Knoll.Working closely with SAPS to record and maintain inspections throughout commissioning worksHandling of specialised tooling for commissioning works. Commissioning Vestas V164 9.5MW WTG on 90 offshore platforms on Triton Knoll.Working closely with SAPS to record and maintain inspections throughout commissioning worksHandling of specialised tooling for commissioning works.
-
-
-
Muehlhan Wind
-
Denmark
-
Wind Electric Power Generation
-
700 & Above Employee
-
Wind Turbine Technician
-
Apr 2020 - Jan 2021
Offshore pre assembly mechanical technician working on Siemens 7MW offshore platforms.Mechanical building and completion of entrance platforms including installation of service lifts internally.Installation of towers including stretching, tensioning and final works. Offshore pre assembly mechanical technician working on Siemens 7MW offshore platforms.Mechanical building and completion of entrance platforms including installation of service lifts internally.Installation of towers including stretching, tensioning and final works.
-
-
-
Muehlhan Wind Service
-
Denmark
-
Wind Electric Power Generation
-
700 & Above Employee
-
Offshore service technician
-
Sep 2019 - Jan 2020
Team member working offshore on East Anglia one on the Siemens 7MW wind turbines as part of the 500hr and commissioning team. Roles included but not limited too, fault finding, retro fits, upgrades, service work and inspections. Team member working offshore on East Anglia one on the Siemens 7MW wind turbines as part of the 500hr and commissioning team. Roles included but not limited too, fault finding, retro fits, upgrades, service work and inspections.
-
-
-
Windhoist Ltd
-
United Kingdom
-
Renewable Energy Semiconductor Manufacturing
-
Team Lead for Avanti XL SWP and mechanical divison
-
Sep 2018 - Sep 2019
.Mechanical finishing/completion on Siemens Gamesa SWT- 7MW wind turbines for Hornsea stage one.. Mechanical team lead on QYQYS works and NCR reports.Avanti XL SWP lead installer on over 150 Avanti lifts. . Health and safety representative .Mechanical finishing/completion on Siemens Gamesa SWT- 7MW wind turbines for Hornsea stage one.. Mechanical team lead on QYQYS works and NCR reports.Avanti XL SWP lead installer on over 150 Avanti lifts. . Health and safety representative
-
-
-
CPower Energy Ltd
-
United Kingdom
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
CP supervisor
-
Jun 2018 - 2019
Paint protection & repair project on Wikinger offshore wind farm-Providing detailed inspections on TP’s and sub stations - Working to a high standard to establish correct applications to damaged areas Paint protection & repair project on Wikinger offshore wind farm-Providing detailed inspections on TP’s and sub stations - Working to a high standard to establish correct applications to damaged areas
-
-
-
CWind
-
United Kingdom
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
Senior Mechanical Technician
-
Mar 2018 - Aug 2018
. Project: TP retro fitting to 4&6 MW turbines; Borkum Germany on Gode 1 & Borkum RIffgrund..Removed stanchions, repositioned GPS monitors and fitted MCG brackets with stanchions to the TP platform for Amplemen access..Complied with guidelines to facilitate a safe and productive work environment..Followed safe working practises and Wind Turbine safety rules. . Project: TP retro fitting to 4&6 MW turbines; Borkum Germany on Gode 1 & Borkum RIffgrund..Removed stanchions, repositioned GPS monitors and fitted MCG brackets with stanchions to the TP platform for Amplemen access..Complied with guidelines to facilitate a safe and productive work environment..Followed safe working practises and Wind Turbine safety rules.
-
-
-
WindCare
-
Renewable Energy Semiconductor Manufacturing
-
1 - 100 Employee
-
Mechanical Technician
-
Jun 2016 - Mar 2018
.Completed bolt tensioning work scopes/schedules..Ensured required torques are carried out on the towers, nacelles and blades..Led a squad of Technicians ensuring tasks are completed correctly and timely..Delivered Tool box talks and implemented Method statements and Risk assessments are followed..Ensured the completion of installations, repairs breakdowns and servicing..Disassembled/assembled multiple gearboxes within Wind Turbines. .Completed bolt tensioning work scopes/schedules..Ensured required torques are carried out on the towers, nacelles and blades..Led a squad of Technicians ensuring tasks are completed correctly and timely..Delivered Tool box talks and implemented Method statements and Risk assessments are followed..Ensured the completion of installations, repairs breakdowns and servicing..Disassembled/assembled multiple gearboxes within Wind Turbines.
-
-
-
-
Lead Technician
-
Jun 2012 - Mar 2017
.Managed a team of Technicians on the safe completion of work scopes..Oversaw the installation, servicing and repairs to various Wind Turbines including Vestas V27-V47’s..Completed time sheets, progress reports as well as actively leading and partaking in safety meetings. .Managed a team of Technicians on the safe completion of work scopes..Oversaw the installation, servicing and repairs to various Wind Turbines including Vestas V27-V47’s..Completed time sheets, progress reports as well as actively leading and partaking in safety meetings.
-
-