Jophel Evangelista

Technical Support Consultant at Magna Systems & Engineering
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Calabarzon, Philippines, PH
Languages
  • English -
  • Filipino -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Broadcast Media Production and Distribution
    • 1 - 100 Employee
    • Technical Support Consultant
      • Oct 2021 - Present

    • Philippines
    • Technology, Information and Internet
    • 1 - 100 Employee
    • Drive Test Engineer
      • Jun 2018 - Oct 2021

    • Project Engineer
      • Dec 2017 - Jun 2018

    • Drive Test Engineer
      • Jul 2016 - Dec 2017

    • China
    • Telecommunications
    • 700 & Above Employee
    • Site Engineer
      • Mar 2016 - Jun 2016

      Project: Belltel Project 2G/4G • Survey the site together with subcontractor to know the site condition (i.e. lessor issue, hoisting procedure, road blocking) • Supervise subcontractor during hoisting of equipment. Checking of delivered equipment and materials form the warehouse. Take note of lacking materials then request for D.O. • Supervise subcontractor during installation; antenna azimuth and height based on the approved DDD, installation standards, use of PPE, and safety of tools to avoid accident. • Update from time to time regarding site progress or any issues. If issues arise, solve it at once, but if can’t, escalate it to the higher office (zone manager, project manager) • Supervise subcontractor during rectification to ensure site readiness before acceptance. • Coordinate with Belltel Zone Manager and subcontractor during acceptance. • Simulate alarms on Delta cabinet during acceptance Show less

    • Telecommunications
    • 1 - 100 Employee
    • Team Member
      • May 2015 - Feb 2016

      Globe Vindicator Project (LTE) • Checking of delivered equipment and materials from the warehouse, checking if there are lacking materials then coordinate with Huawei site engineer • Site surveying to know if the site condition is matched to the approved TSSR. • Installation of the delivered materials: includes installation of BBU, DCDU, RRU, antenna, jumper and feeder cable, power, fiber optic and grounding cable, and power tapping. • Ensures VSWR and DTF testing for antenna to jumper cable, antenna to jumper-feeder-jumper cable • Performs rectification of site for pre-PAT and acceptance • Support Huawei Site Engineer for PAT(Provisional Acceptance Test) Globe Petal Project (3G expansion) • Checking of delivered equipment and materials from the warehouse, checking if there are lacking materials then coordinate with Huawei site engineer • Site surveying to know if the site condition is matched to the approved TSSR. • Installation of the delivered materials: Petal Project Equipment installation, antenna change-out, power tapping, integration and BFT. • Ensures VSWR and DTF testing for antenna to jumper cable, antenna to jumper-feeder-jumper cable before integration • Performs BFT after integration PLDT NGN • Helps in MSAN installation: equipment installation, power tapping, and tapping of subs cable at the Krone. Show less

Education

  • Rogationist College, Cavite
    electronics engineering
    2010 - 2015

Community

You need to have a working account to view this content. Click here to join now