jomy George

Senior MEP Coordinator at Debbas Group
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Qatar, QA
Languages
  • English, Full professional proficiency
  • Hindi Limited working proficiency
  • Malayalam Native or bilingual proficiency
  • Arabic Limited working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Aldo Bruno

Jomy is very good and serious worker and suitable to work in team.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certified International Project Manager, CIPM
    AAPM ® American Academy of Project Management ®
  • IMS Internal Auditor Certificate ISO 9001:2000, ISO 14001 & OHSAS 18001 Applus Velosi
    Applus Velosi
  • Master Construction Project Manager , MCPM
    AAPM ® American Academy of Project Management ®

Experience

    • Lebanon
    • Mechanical Or Industrial Engineering
    • 100 - 200 Employee
    • Senior MEP Coordinator
      • Dec 2018 - Present

    • Construction Manager
      • Dec 2018 - Present

    • Qatar
    • Executive Offices
    • 100 - 200 Employee
    • Head Of Electrical Divn
      • May 2014 - Present

    • United States
    • Retail
    • 700 & Above Employee
    • Electrical Maintenance Engineer
      • May 2012 - Sep 2013

    • Saudi Arabia
    • Executive Offices
    • 700 & Above Employee
    • Sr.Electrical Engineer
      • Jun 2010 - Sep 2011

      involves preparation for shop drawings , procurement of long lead items , , Review and approve sub contractor documents, instruction & Guidance to sub contractor, Project Monitoring ,and updates Progress schedules. Overall Monitoring of Electrical installations and Low current systems like Fire alarm , Public address , CCTV, Access controls, BMS Systems, Audio-visual systems, Lighting controls(DALI/EIB). Also Electrical Installation like cables, lighting and MCC Installation, Motor and LCS Installation, medium voltage panel , cathiodic protection Installation and testing primary and secondary Grounding, Review and approve of ITP’s and QA/QC documents. QC Inspections with TPI Checking of As-Built drawings and Preparation and clearing the Punch Lists., preparation for the dossiers etc. Show less

    • Industrial Machinery Manufacturing
    • 700 & Above Employee
    • Electrical Engineer
      • Oct 2008 - Sep 2009

      the Issuance of materials to sub contractor, , Review and approve sub contractor documents, instruction & Guidance to sub contractor, Project Monitoring ,and updates Progress schedules. Overall Monitoring of Electrical installation like cable installation, lighting and MCC Installation, Motor and LCS Installation, medium voltage panel , cathodic protection Installation and testing primary and secondary earthling ,Review and approve of ITP’s and QA/QC documents. QC Inspections with TPI Checking of As-Buit drawings and Preparation and clearing the Punch Lists, Preparation for the dossiers etc. Show less

    • Qatar
    • Oil and Gas
    • 200 - 300 Employee
    • Electrical field Engineer
      • Aug 2007 - Aug 2008

      the supervision of all Electrical installation like cable installation, lighting and MCC Installation, medium voltage panel and assisted for testing of electrical equipments, Preparation of 2 weeks look ahead schedule, weekly monitoring and updating progress schedules, preparation and clearing the punch lists etc.. the supervision of all Electrical installation like cable installation, lighting and MCC Installation, medium voltage panel and assisted for testing of electrical equipments, Preparation of 2 weeks look ahead schedule, weekly monitoring and updating progress schedules, preparation and clearing the punch lists etc..

    • Construction
    • 1 - 100 Employee
    • Sr.Electrical Engineer
      • Jul 1992 - Mar 2007

      • Project Monitoring and Control • Erection and Commissioning of Substation Equipments. • Installation and Commissioning of Low Current System • Bill of Quantities, Invoicing and Re-Measurement. • Design of Building Electrical systems • Procurement of Electrical materials • Estimation & Bidding of Projects • Preparation of Job Cards and JSA. • Preparation of Turn Over documents & Project Dossiers • Punch list clearance and Mechanical Completion. • Preparation of QA/QC Documents(ITP’s , method of statements etc) • Project Material Submittals , Shop Drawings& As-Built Drawings • Control & Issue of material to Subcontractor Show less

    • India
    • Utilities
    • 700 & Above Employee
    • PROJECT ENGINEER
      • Sep 1990 - Jun 1992

      WORKED FOR BHIRA-DHARAVI 220 KV TRANSMISSION LINE WORKED FOR BHIRA-DHARAVI 220 KV TRANSMISSION LINE

Education

  • MVJ College of Engineering
    Bachelor of Engineering (B.E.), Electrical Engineering
    1984 - 1989
  • St.THomas College , Kozhencherry, Kerala India
    Bachelor of Science (B.Sc.), Chemistry
    1980 - 1983
  • St.Thomas College Kozhencherry
    Bachelor of Science (B.Sc.), Chemistry
    1980 - 1983

Community

You need to have a working account to view this content. Click here to join now