Jojo Joy
Production Engineer at Redback Radiators- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
English Professional working proficiency
-
Malayalam Native or bilingual proficiency
-
Hindi Full professional proficiency
-
Tamil Full professional proficiency
Topline Score
Bio
Credentials
-
SOLIDWORKS 2021 Essential Training
LinkedInMar, 2021- Oct, 2024 -
Certified Professional AutoCAD 2013
AutoDeskFeb, 2014- Oct, 2024
Experience
-
Redback Radiators
-
Australia
-
Motor Vehicle Manufacturing
-
1 - 100 Employee
-
Production Engineer
-
Sep 2021 - Present
• Documenting New Processes, Process Changes, and developing Standard operating instructions for production activities. • Optimizing processes to maximize productivity and conducting Time study. • Investigating the Root Cause Analysis of Non-Conformances that are reported and identifying solutions and corrective actions. • Assist with the development of new and existing continuous improvement plans to achieve production efficiencies, generate production innovations, and implement safe workplace methods. • Maintaining improvement register for NCR. • Authoring Product Improvement Notices, Non-conformance Reports, and Engineering Change requests as part of internal/external component quality control. • Collaborate and coordinate with Project Managers for New Product Introductions (NPI) along the design stage to production. • Ensuring Stakeholder engagement with production staff and the engineering team to develop workable solutions to technical issues. • Conducting daily toolbox meetings, attending weekly Production meetings to plan and schedule priorities, and setting targets for production. • Review progress on the production schedule daily with Production Manager Oversee Production floor staff across key stages of assembly – fabrication, fitting, stores, and site. • Assist with review of Production Work Orders to plans to ensure processing accuracy and completeness before issuing to shop floor staff, and use of our ERP to interrogate discrepancies in factory documentation. • Assist with the coordination of annual stocktake and maintenance of accurate stock control. • Designing and manufacturing of jigs and fixtures to increase productivity Developing a scope of work, objectives, and budgets for projects. Extra Experience • Operating Amada ENSIS-3015. • Operating Ermaksan Power Bend.
-
-
-
Master Steel
-
Mexico
-
Automation Machinery Manufacturing
-
1 - 100 Employee
-
Project Engineer Intern
-
Apr 2021 - Sep 2021
Maintain project schedule, budget and monitor daily progress by coordinating activities and resolving problems. Communicating with stakeholders to interpret their need and on-site representation. Perform quality control and regularly reporting on project status. Review engineering deliverables and initiate appropriate corrective actions. Ensuring adequate standards, codes, QA/QC policies and specifications are followed. Communicate and cooperate effectively with project manager and other participants to assist and provide technical support.
-
-
-
Inkal Ventures Private Limited
-
India
-
Oil and Gas
-
1 - 100 Employee
-
Mechanical Piping Engineer
-
Sep 2016 - Aug 2018
Performed incoming material inspections Preparation of daily reports, including work, profess and manpower utilization rates. Presented weekly reports on total spool erection, isometric weight installed, welded inches of supports and joints and the remaining work front with the materials available. Supervised all piping works Ensured and complied with all OH&S requirements of the project Conducted line surveys and hydro tests of standards
-
-
ASSISTANT PROJECT ENGINEER – Execution & QA/QC
-
Oct 2015 - Sep 2016
PROJECT: Integrated Refinery Expansion Project• Performed incoming material inspections• Welding inspection of piping• Ensured all QA & QC documentation was managed accordingly and correctly filed• Liaised with engineering and construction teams to ensure client’s engineering requirements were met.• Ensured pipe erection operations and pipe support installation was in accordance with allocated schedules, procedures, specifications, priorities, and availability of materials.• Reported on daily work activity and updated progress reports• Performed mechanical clearance and hydro tests
-
-
-
-
JUNIOR MECHANICAL ENGINEER
-
Dec 2014 - Oct 2015
• PROJECT: Cross Country Pipeline & Mechanical Parts • Organised work scheduling • Ensured all QA & QC documentation was managed accordingly and correctly filed • Performed regular hydro tests and coordinated pig launching • PROJECT: Cross Country Pipeline & Mechanical Parts • Organised work scheduling • Ensured all QA & QC documentation was managed accordingly and correctly filed • Performed regular hydro tests and coordinated pig launching
-
-
-
Autokast Ltd (Govt of Kerala Undertaking)
-
India
-
Mining
-
1 - 100 Employee
-
Internship Trainee
-
Dec 2013 - Jan 2014
-
-
Education
-
Southern Cross University
Masters in Engineering Management, Engineering -
Southern Cross University
Masters in Business Administration, Engineering/Industrial Management -
Mahatma Gandhi University
Bachelor's degree, Mechanical Engineering -
Mar Baselious Institute of Technology and Science
Bachelor of Technology - BTech, Mechanical Engineering