John Young

Senior Project Engineer at Global Offshore
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Wallsend, England, United Kingdom, GB
Languages
  • English Native or bilingual proficiency
  • French Elementary proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Project Engineer
      • Apr 2021 - Present

    • France
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Project Engineer - Trident Okume
      • Dec 2020 - Apr 2021

      Senior Project Engineer responsible for co-ordinating and delivering project engineering deliverables on fast track subsea tie back project. Project includes installation of 2Qty inter platform electrical cables. Senior Project Engineer responsible for co-ordinating and delivering project engineering deliverables on fast track subsea tie back project. Project includes installation of 2Qty inter platform electrical cables.

    • Norway
    • Oil and Gas
    • 700 & Above Employee
    • Senior Project Engineer - Tendering
      • Oct 2018 - Nov 2020

      Senior Project Engineer working on multiple tendering projects. From receipt of prospective Client work scope, responsible for liaison with internal engineering departments and external suppliers to develop project technical method statements, schedules, clarifications and cost. Projects include shallow and deep water export and array cable installation, repair and burial, using multiple assets and equipment spreads.

    • Senior Project Engineer - JPS Nemo
      • Feb 2018 - Sep 2018

      Senior Project Engineer for project management and engineering associated with shallow water installation of Nemo HVDC Interconnector Cables from CLV Maersk Connector/MultiCat. Responsibilities included developing offshore procedural documentation for nearshore float/pull-in operations, delivery of design, mobilisation and operation of shallow water Multicat quadrant pull-in spread. Co-ordinated the mobilisation of trenching spread onboard the Skandi Constructor and oversaw subsea construction activities onboard. Focal point for onshore management of 3rd party nearshore diving operations. Offshore supervision of 3rd party Controlled Flow Excavation operations.

    • United Kingdom
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Project Engineer - NKT Stat Oil Johan Sverdrup
      • Oct 2017 - Feb 2018

      Senior Project Engineer for project management and engineering associated with CLV NKT Victoria installation of HVDC cables. Responsibilities include developing offshore procedural documentation for onshore pull-in, lay and platform pull-in operations.

    • Senior Project Engineer - NKT Victoria
      • Jan 2017 - Feb 2018

      Senior Project Engineer for project management and engineering associated with CLV NKT Victoria generic mooring study. Project management of mooring analysis with different mooring & winch configurations.

    • Package Manager - ENI EMAS OCTP
      • Oct 2016 - Nov 2017

      Package Manager responsible for engineering, procurement & construction of new-build basket carousel loading tower and 10Te tensioner. Supervision of subcontractor overseeing safe & successful delivery of the equipment. Project included on site management of mobilisation and operation of 5000Te flexible lay spread onboard Lewek Constellation during flexible loadout and installation operations.

    • Package Manager - 450Te Reel Drive System
      • Aug 2016 - Feb 2017

      Package Manager responsible for engineering, procurement & construction of new-build 450Te reel drive system.

    • Senior Project Engineer - ABB Rentel OWF Export Cable
      • Apr 2016 - Oct 2016

      Senior Project Engineer for project management and engineering associated with ABB Victoria beaching & mooring feasibility study for Rentel Offshore Wind Farm export cable installation. Development of beaching analysis, mooring analysis, anchor handling procedure, beaching procedure and onshore pull-in procedures.

    • Netherlands
    • Oil and Gas
    • Project Engineer- ABB Caithness-Moray-Shetland Project
      • Nov 2015 - Mar 2016

      Responsible for producing the shallow water Cable Lay Vessel anchor handling procedure & Cable Lay Vessel Pull-in Procedure. Project Management of Cable Lay Vessel mooring analysis. Responsible for producing the shallow water Cable Lay Vessel anchor handling procedure & Cable Lay Vessel Pull-in Procedure. Project Management of Cable Lay Vessel mooring analysis.

    • Oil and Gas
    • 700 & Above Employee
    • Senior Project Engineer- BP Quad
      • Sep 2014 - Aug 2015

      Senior Project Engineer for project management and engineering associated with installation of 10 Qty Control Distribution Assembly Structures and 2 Qty Manifold Structures (Combined weight > 1000Te) from the Siem Daya 2 and Viking Neptun. Headed up small team of engineers overseeing installation philosophy, production of installation documentation, design and procurement of installation aids. Onboard the Siem Daya 2 and Viking Neptun provided offshore supervision and support for all construction and installation activities associated with work scope.

    • Senior Project Engineer- BP Quad West of Shetland
      • Sep 2013 - Sep 2014

      Senior Project Engineer for project management and engineering associated with installation of 3 Qty SSIV and 3 Qty Manifold Structures from the Olympic Challenger and establishing onshore Flexible Jumper assembly operations in Invergordon yard. Headed up small team of engineers overseeing construction philosophy, production of installation/assembly documentation, design and procurement of installation aids associated with the workscopes. Onboard the Fugro Symphony provided offshore supervision and support for all construction and installation activities associated with mob, loadout and installation of 2Qty Umbilicals.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Lead Project Engineer- Chevron Gorgon Australia
      • Apr 2012 - Jul 2013

      Lead Project Engineer for project management and engineering associated with installation of 1 Qty Static Umbilical, 2 Qty Shoreside Pull-in Umbilicals and 3 Qty Manifolds. Headed up small satellite team of engineers overseeing installation philosophy, production of installation documentation, design and procurement of installation aids. Responsible for development and tracking of CTRs for duration of workscope. Onboard the MSV Seven Seas provided offshore supervision and support for all construction and installation activities associated with work scope.

    • Lead Project Engineer- ONGC G1 Indian Ocean
      • Oct 2011 - Apr 2012

      Lead Project Engineer for project management and engineering associated with installation of 4 Qty Static Umbilicals, 3 Qty Flowlines, 3Qty Flowline Jumpers, 2 Qty FTP Jumpers and 1 Qty Manifold. Reporting directly to Construction Manager responsibilities included developing methodology and procedures, schedule production, project management of 3rd party testing subcontractor, project management of internal ROV tooling, design review and SIT supervision of client FIM, client interface and supervision of project engineering.Onboard the MSV Skandi Seven provided offshore supervision for all construction and installation activities associated with work scope.

    • Senior Project Engineer- Nexen Blackbird North Sea
      • Jan 2011 - Sep 2011

      Senior Project Engineer/(Acting Project Engineering Manager) for project management and engineering associated with installation of 1Qty Suction Can, 1 Qty Dynamic Umbilical, 1Qty Static Umbilical, 2 Qty Flowlines, 2 Qty FTP Jumpers and 1 Qty Manifold c/w Piles. Reporting directly to Construction Manager responsibilities included developing methodology and procedures, schedule production, project management of 3rd party testing subcontractor, project management of internal ROV tooling, design review and SIT supervision of client FIM, client interface and supervision of project engineering.Onboard the MSV Seven Pacific provided offshore supervision for all construction and installation activities associated with work scope.

    • Senior Project Engineer- Anadarko Caesar Tonga (GoM)
      • Aug 2010 - Dec 2010

      Senior Project Engineer for project management and engineering associated with installation of 1Qty 18800m lng Dynamic Umbilical, 1Qty 6000m lng Infield Umbilical, 8Qty 7.69” OD Rigid M shaped Jumpers, Steel Tube, Electrical and Optical Flying Leads. Reporting directly to Project Manager responsibilities included developing methodology and procedures, schedule and budget production, project management of 3rd party umbilical testing subcontractor, project management of internal ROV tooling, design review and SIT supervision of client FIM, client interface and supervision of project engineering.Onboard the MSV Skandi Neptune provided offshore supervision for all construction and installation activities associated with work scope.

    • Senior Project Engineer- Anadarko Caesar Tonga (GoM)
      • Mar 2010 - Jul 2010

      Senior Project Engineer for project management and engineering associated with installation of 3qty Messenger Wires into Split Guide I Tubes and installation of 2 Qty ROV Bend Stiffener Latch Mechanisms to keel of Spar. Reporting directly to Project Manager responsibilities included developing methodology and procedures, schedule and budget production, project management of 3rd party pull-in winch and guide pipe fabrication subcontractor, project management of 3rd party down hole camera subcontractor, procurement management of 3rd party vendors supplying ROV tooling, design review and SIT supervision of client FIM, client interface and supervision of project engineering.Onboard the MSV Seven Oceans provided offshore supervision for all construction and installation activities associated with work scope.

    • Project Engineer- Marathon Droshky (GoM)
      • Oct 2009 - Feb 2010

      Project Engineer working within structural dept responsible for producing approved calculation and design package for design of Jumper installation rigging arrangement and seafastening of deck transportation spread. Project Engineer onboard Platform overseeing third party contractor performing pigging, hydrotesting and chemical flushing of flowlines.

    • Project Engineer- Petrobras Cascade Chinook (GoM)
      • May 2009 - Sep 2009

      Project Engineer working within structural dept responsible for producing DNV approved calculation and design package for design of installation aids and seafastening of deck equipment. Design package included general deck seafastening arrangements for a large winch unit, modifications to overboarding sheave frame and mudmat stacking frame.

    • Project Engineer- BP Atlantis (GoM)
      • Jan 2009 - Apr 2009

      Project Engineer responsible for overseeing production of procedural documentation and co-ordination of procurement of hardware and ROV equipment. Project included- Pigging Loop recovery, installation of Manifold, Rigid Jumpers, Pigging Loop and commissioning of Manifold.

    • Project Engineer- BP Thunderhorse (GoM)
      • Sep 2008 - Jan 2009

      Project Engineer responsible for overseeing production of procedural documentation and and co-ordination procurement of hardware and ROV equipment. Project included- mobilization of lay spread, Umbilical installation, Rigid Jumper recovery, installation of controls equipment.

    • Project Engineer- BP Thunderhorse (GoM)
      • Nov 2007 - Sep 2008

      Project Engineer responsible for overseeing production of procedural documentation and co-ordination of procurement of hardware and ROV equipment. Project included Umbilical relocation, Rigid Jumper installation, Controls Equipment installation.

    • Project Engineer- BP Thunderhorse (GoM)
      • Jun 2007 - Nov 2007

      Responsible for co-ordination and execution of construction equipment & ROV system spread onboard the Toisa Vigilant. Over saw execution of offshore works including subsea Structure installation, operation of ROV intervention tooling, including Pipeline Lifting Frames and hydraulically activated Hold Back Clamps.

    • Project Engineer- BP Atlantis (GoM)
      • Mar 2007 - Jun 2007

      Project Engineer responsible for mobilization of multi Reel Drive System lay spread on board Toisa Perseus. Oversaw offshore execution of umbilical installation. Daily responsibilities included ensuring execution procedural compliance, management of procedural change, shift instruction to vessel crew.

    • Project Engineer- VLS Study (GoM)
      • Sep 2006 - Feb 2007

      Responsible for production of sub-contractor technical equipment specifications for design of Vertical Lay System for Skandi Neptune. Management interface contact with subcontractor design house.

    • Project Engineer- Equipment Group (UK/GoM)
      • Mar 2006 - Aug 2006

      Responsible for providing internal technical support to project teams with regards Vertical Lay System onboard the Toisa Perseus. Over saw site interface testing and mobilisation of fibre rope Traction Winch system.

    • Project Engineer- Woodside Chinguetti (West Africa)
      • Sep 2005 - Feb 2006

      Responsible for overseeing execution of Flowline and Umbilical top side operations. Workscope included FPSO Flowline and Umbilical pull-in, commissioning and testing. Interface with commissioning sub contractor.

    • United Kingdom
    • Oil and Gas
    • 700 & Above Employee
    • Project Engineer- BP West of Shetland
      • Sep 2004 - Jul 2005

      Responsible for creating offshore installation procedures for installation of subsea Flexible Jumpers and subsea Structures. Remit included co-ordination of design analysis and fabrication of lifting equipment. Oversaw offshore campaign execution including utilization of DMaC subsea connection system. Responsible for creating offshore installation procedures for installation of subsea Flexible Jumpers and subsea Structures. Remit included co-ordination of design analysis and fabrication of lifting equipment. Oversaw offshore campaign execution including utilization of DMaC subsea connection system.