John V.

Senior Staff Drilling Engineer at Hibernia Resources, LLC
  • Claim this Profile
Contact Information
Location
US

Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Credentials

  • Engineer In Training
    Texas Board of Professional Engineers and Land Surveyors
    Oct, 2012
    - Sep, 2024

Experience

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Senior Staff Drilling Engineer
      • Oct 2021 - Present
    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Operations Engineer
      • Apr 2021 - Sep 2021
    • Oil and Gas
    • 700 & Above Employee
    • Drilling Engineer II
      • Jun 2016 - Mar 2020

      Design projects for field development, including but not limited to casing design, cement design, drilling fluids programs, directional services programs, and BHA design Supervision of field engineering and operations team of 50 people including employees, contract employees, and vendorsEngineering dynamics modeling including hydraulics, torque and drag modelingOptimize operations strategy to minimize expenditures, improve performance with innovation and technology, and reduce cycle timeManage operations as needed, $50M-$200M projects per yearResponsible for multiple production asset developments across corporation’s asset development basePrepare cost estimates and risk assessmentsQA/QC operations data reporting and real time data systemsEvaluate bids, secure services, manage logistics, provide project evaluation at completionProcess and audit invoices for services performed and manage monthly accrualsCoordinate projects with multiple asset teamsBenchmark capital spending and cost efficiencyPresent company performance data vs offset competitors to managementMentored a development engineer during their drilling rotation for six monthsEngineered and drilled around 10 horizontal wells in the Wichita Albany and San Andres formations in the Central Basin Platform Andrews County. Engineered and drilled a couple Devonian vertical wells in the Central Basin Platform Andrews County. Engineered and worked as a wellsite supervisor for around 25 Yeso horizontals in Eddy County New Mexico Northwest Shelf. For Bone Spring Sand horizontals, I've engineered approximately 40+ wells in both Eddy and Lea Counties of New Mexico. For unconventional reservoirs, I've engineered around 10 Wolfcamp horizontals in Upton County in Texas and Lea County in New Mexico.

    • Drilling Engineer I
      • Jun 2013 - Jun 2016

      Started in Houston, TX and completed schools in the following:Drilling fluids engineering with HalliburtonCementing engineering with HalliburtonHydraulic fracturing engineering with Baker HughesWireline training with SchlumbergerSpent time on drilling rigs or frac crews applying knowledge from the schools to help better gain experience from actual operations.Designed drilling programs for 2 rigs for the central basin platform to drill San Andres, Wichita Albany, and Devonian formations. Picked up a 3rd rig and designed drilling programs for vertical Yeso wells in New Mexico's Northwest Shelf.Shadowed a company man in the field for the first half of 2015 and then designed wells for drilling horizontal Yeso wells in New Mexico's Northwest Shelf utilizing a super single drilling rig.Spent 2016 QA/QC well data, invoices, etc...

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Field Engineer Intern
      • Jun 2012 - Aug 2012

      Shadowed and learned the roles that a pumper completed for a pumping route Learned about production equipment and different artificial lift designs Shadowed and learned the role of an instrumentation technician Intern project was over the utilization of produced water for drilling operation Shadowed and learned the roles that a pumper completed for a pumping route Learned about production equipment and different artificial lift designs Shadowed and learned the role of an instrumentation technician Intern project was over the utilization of produced water for drilling operation

Education

  • Texas Tech University
    Bachelor of Science - BS, Petroleum Engineering
    2010 - 2013

Community

You need to have a working account to view this content. Click here to join now