John Mitchell, EngNZ, MIET, CMSE®, FSEng TǕV

Engineering and Operations Manager at CR Automation at CR Automation
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Napier-Hastings Area, NZ
Languages
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 1 ratings
  • (1)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Kevin Breedveld

For a Kiwi to recommend a Pom (Britian) you know he is a very capable person. I was contracting to Ballance for over 8 years looking after their drafting requirements. I worked with John from the time he came out from England on a near daily basis. He is very organised and guides a project with a gentle controlled hand. Fantastic chap.

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Certified Machinery Safety Expert
    TUV Nord
    May, 2018
    - Nov, 2024
  • Functional Safety Engineer
    TÜV Rheinland Group
    Aug, 2018
    - Nov, 2024

Experience

    • New Zealand
    • Industrial Machinery Manufacturing
    • 1 - 100 Employee
    • Engineering and Operations Manager at CR Automation
      • Oct 2019 - Present

    • Automation Engineering Manager
      • May 2019 - Oct 2019

    • Senior Electrical Project Engineer
      • Oct 2018 - May 2019

    • Electrical and Control Systems Project Engineer
      • Jul 2016 - Oct 2019

    • High Voltage and System Engineer
      • Sep 2016 - Nov 2016

      I was engaged as an additional electrical engineering resource. The role involved checking modifications to the relay controlled interlock system to the test bay. Commissioning an 11/22kV switchboard, transformers and cabling. Designed and installed the hardwired part of the control system for controlling the switchboard and gathering current and voltage data. Improved a portable PD tester. Provided design drawings using Visio.

    • Electrical and Control Systems Project Engineer
      • Aug 2016 - Aug 2016

      Recently re-engineered a Twido PLC and a Magelis HMI for the "First Light" solar powered Bach controlling sun blinds.

    • Australia
    • Professional Services
    • 700 & Above Employee
    • Engineering Manager
      • Oct 2011 - Sep 2013

      Leading a team of multi discipline engineers, designers, contractors and other professionals. 40% was spent managing and 60% engineering.Responsible for managing resources for; food and beverage, the industrial project teams and the engineering team in Hawke's Bay. Improved employee utilisation from under 60% to over 85% by interfacing with other Engineering Managers throughout the country and effectively managing the work load to share resources as required between all engineering teams, engaging additional contract staff as required. Project Engineering Manager for a $600K Front End Engineering Design (FEED) for a biodiesel facility using twenty resources in four different locations in NZ. I also provided all electrical engineering services for this project.Provided electrical and control engineering technical support to regional offices in Auckland, Christchurch and Wellington.Provided electrical, control systems and safety systems, detailed design, construction issues resolution and commissioning support for a coal processing facility in Southland.Acted as Lead Electrical Engineer during the pre-turnaround work for Methanex, responsible for all electrical engineering for replacement UPS systems, batteries and 24VDC supplies for multiple safety shutdown systems. Show less

    • Project Support Services Engineer
      • Dec 2010 - Sep 2011

      Provided project support services to industry sector project managers and managed the professional resources to provide this support. Carried out various electrical and control engineering tasks for a variety of clients in the hydrocarbons, food and beverage and energy sectors.

    • Senior Project Engineer
      • Apr 2010 - Dec 2010

      Carried out the FEED and value engineering study for a $32M coal processing facility consisting of remote I/O, remote safety I/O, instrumentation and all low voltage equipment.Acted as site construction and commissioning manager, writing job hazard analysis documentation and issuing permits for construction staff to work on site. Developed the site induction pack and delivered the training to staff and contractors before working on site.Managed contractors and the client interface for an upgrade to a wine processing facility, including the control system, commissioning of pressure vessels, lifting plans and pipework. Managed the excavation, including pilling for a waste water buffer tank and the interfaces with the district council.Engineered the low voltage electrical system for an extension to the Yolla offshore platform, which required complex electrical interfaces with the existing platform for an Australian client.Engineered the replacement of DC drives with AC VSD’s for starting gas turbines / generators on an offshore platform.Designed the electrical and control interfaces for a new bagging line to a wood processing plant located in a zone 22 area.Managed the engineering resources for designing an earthing system for a 11kV / 400V distribution system. Show less

    • Senior Electrical & Controls Engineer
      • Jun 2008 - Apr 2010

      Designed, supervised the installation and commissioned a Rockwell PLC system with over 1200 I/O using remote I/O drops connected over a redundant fibre network. This was connected to a Wonderware SCADA and Historian system in the main control room for use in a $22M wood processing facility. Also engineered all of the low voltage distribution, standby power systems, lighting and the interfaces to both the control system and the safety system.Designed, supervised the installation and commissioned a Sick safety shutdown system to EN954-1 interfacing to multiple MCC’s using Category 3 principles to ensure redundant safety circuits for a spark detection system and a chemical suppressant system as part of a fire prevention system.Specified a CCTV system connected over a fibre network, with monitoring in the control room and computer based recording of images.Project managed, supervised the installation and commissioned a replacement 400V essential services main switchboard / MCC during a challenging shutdown window. Testing of various ABB smart motor controllers, soft starters and MCCB’s, which all communicated via Profibus networks to a central ABB AC800M PLC, which communicated over Ethernet to an ABB 800XA SCADA system. Received a management commendation for this project.Supervision of a team of fifteen multi-disciplined contractors and commissioned the controls for an existing HV Generator upgrade. This involved upgrading a Rockwell PLC; a new server based Wonderware SCADA, specifying new pressure instrumentation, additional hardwired trips, upgrades and interfaces to the HV protection relays using Modbus communications. Received a management commendation for this project.Electrical inspections of various establishments.General project work carried out included conceptual design and budgeting for approval, engineering of work, supervising drafting, organising work contracts and supervision of multi discipline teams and development of graduates. Show less

    • New Zealand
    • Farming
    • 400 - 500 Employee
    • Instrument & Electrical Engineer
      • Aug 2005 - Jun 2008

      Project managed the CAPEX, specification, installation and commissioning of the following instrumentation and electrical equipment projects: A VSD and PLC solution for the cooling tower fans which resulted in project cost payback within eighteen months. Road Tanker discharge remote telemetry system for a BOC nitrogen storage tank. Chlorine analysing and automatic dosing control system for the Site’s clarified water. Replacement of an acid dosing control system for The Effluent Treatment Plant. Replacement of an underground earth mat with an overhead earthing system using over a kilometre of 120mm2 cable. Interfacing an existing Modicon PLC to the site ABB 800XA SCADA system using Modbus over Ethernet. Improved the PLC control around weight accuracy in filling one and two tonne bags of product, improved overfill from 50kg to consistently less than 1kg. Designed the control loops for a gas powered compressor to monitor the spark detection system to ensure the machine was firing at the correct angle. Replacement of various chlorine and pH analysers in the Water Treatment Plant and Cooling Towers. Created a specification for new two radios to be used in a zone 1 hazardous area. Show less

    • United Kingdom
    • Chemical Manufacturing
    • 700 & Above Employee
    • Control Systems Engineer
      • Oct 2003 - Jun 2005

    • Control Systems Implementation Facilitator
      • Aug 2002 - Oct 2003

    • Safe Systems of Work Implementation Facilitator
      • Sep 2000 - Sep 2002

    • Control, Electrical & Instrumentation Technical Support
      • Feb 1996 - Sep 2000

    • Electrical Technical Support
      • Jun 1992 - Feb 1996

    • Assistant Team Leader (Electrical)
      • Feb 1990 - Jun 1992

    • Electrician
      • Aug 1987 - Feb 1990

    • Apprentice Electrician
      • Aug 1983 - Aug 1987

Education

  • Open Polytechnic
    NZQA Level 4 Electrical Engineering, AS/NZS 3000 Electrical Wiring Regulations
    2007 - 2007
  • West Cumbria College
    HND BTEC, Electrical and Instrumentation Engineering
    1997 - 1998
  • West Cumbria College
    HNC BTEC, Electrical and Instrumentation Engineering
    1996 - 1997
  • West Cumbria College
    ONC BTEC, Electrical and Instrumentation Engineering