John Koyi
SAP QM/PP Functional Consultant at Manildra Group- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
SAP Certified Application Associate - Business Process Integration with SAP S/4HANA 1809
SAPMay, 2020- Nov, 2024 -
SAP Certified Application Associate - Project Systems with SAP ERP 6.0 EHP7
SAPMay, 2020- Nov, 2024 -
SAP Certified Application Associate - SAP S/4HANA Sales 1909
SAPMay, 2020- Nov, 2024 -
SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing (1709)
SAPJul, 2019- Nov, 2024 -
MIEAust Certified Professional Engineer
Engineers AustraliaJun, 2019- Nov, 2024
Experience
-
Manildra Group
-
Australia
-
Food and Beverage Manufacturing
-
200 - 300 Employee
-
SAP QM/PP Functional Consultant
-
May 2022 - Present
Harvest Project - SAP S/4 Hana Greenfield Implementation Harvest Project - SAP S/4 Hana Greenfield Implementation
-
-
-
CSR Limited
-
Australia
-
Wholesale Building Materials
-
700 & Above Employee
-
SAP Supply Chain Analyst PP/QM Consultant
-
Feb 2020 - Apr 2020
Resolve all BOM, Routing, Work Centre and Material Master issues from ticket raised through Ivanti. Resolve all MRP related malfunctioning issues at the planning file entry using T code MDAB. Resolve product costing related issues in repetitive manufacturing using T code CK11N & CK24. Resolve all job backlog program issue using T code SM36, SM37 Involve in company code data cleanup of production version using T code C223 Involve in managing transporting updates in SPRO reference IMG from TEST, DEV and Production System using T code SE10 & STMS. Assist plant in mass processing of production order using T code COHV Resolving QM integration point in the material master by activating the QM view and assigning the relevant inspection type.
-
-
-
Simpbiz Consulting
-
Michigan USA
-
SAP PP/QM/APO-DP Consultant (Remote Role)
-
Feb 2019 - Sep 2019
In-depth involvement in the Configuration of SAP PP including Demand Management, Advanced Planning & Optimization, Demand Planning, Production Planning Detailed Scheduling, Supply Network Planning, Available To Produce, Core Interface, Transportation Planning , Production Planning & Detail Scheduling for manufacturing industry while providing inputs on the project strategy. In–depth involvement in Configuration of PP-Process Instruction Process Order, Resource, Production Version and Master Recipe. Execute Process Planning, Process Management and Process Order Execution and Order completion Sound involvement in SAP QM including Quality Plan, MIC, sample drawing procedure, Dynamic Modification Rule, QM lifecycle.
-
-
-
Pact Group Holdings Ltd
-
Australia
-
Packaging and Containers Manufacturing
-
400 - 500 Employee
-
SAP Manufacturing Super User Support Role
-
Jul 2017 - Aug 2019
• Assist production planner in creating production order for WIP and Finished good using CO01• Updated the factory documentation in the Routing and classification view using CA22 & MM02• Update changes made in BOM or routing in Production Order through Read PP master data using T code CO02• Adjusted BOM composition in the production order to accommodate various raw material active variation in production order of (WIP) using T Code CO02.• Create Quality Plan for new SKU using QP01.• Assign inspection type to newly activate quality management view using MM02• Released raw and packaging material to production team using relevant Transaction Code QA32.• Released Production Order (WIP) to production team after performing and recording various QC test using relevant Transaction Code QA32• Moved batch managed and non-batch managed Non-Conforming Material to quarantine bin using QAC2 and MB1B Transaction Code• Reversed Usage Decision and Stock for batch managed product using T Code ZQM004.• Generated Certificate of Analysis for all finished product using QC22.• Run customized Traceability report for Bill of Material component for Audit purpose using customizing T code Zmbtrace & Zssc.
-
-
Quality Control Supervisor
-
Jul 2016 - Aug 2019
• Reviewed Factory Product Line Specification to reduce wastage during filling on the line by evaluating the formulation specific gravity against the product weight and the machine mid filled weight.• Reviewed and managed insecticide formulation to accommodate variation in the active ingredient which occur as a result of variation in the of the active percentage in various batch of raw material received.• Inaugurated a verification process in the quality control laboratory using SAP to ascertain that the correct quantity of raw material as stated in the batch sheet is used by the compounding team in each batch making process.• Reviewed Standard Operating Procedure for raw material release processes to eradicate time wastage and increase efficiency. • Develop & manage a quick process in raising non-conforming raw and packaging materials and closing in timely manner all corrective and preventative action in FIORI.• Reviewed all Factory Documentation in SAP of any error, to ensure correct and up-till date information is given to the production crew every time for manufacturing processes.
-
-
-
-
SAP QM Consultant (Remote Role)
-
Jun 2018 - Dec 2018
• Analyze the current system and business processes and help core team in preparing and creating necessary documentation.• Activated Quality Management View for material code in customizing.• Configured QM parameter in material master and assigned relevant Inspection type with material codes.• Configured in customizing catalogue and code group for usage decision, quality notification and master inspection characteristics and assigned relevant selected set to inspection type.• Configured QM master data which includes Quality planning, Quality Info Record, Master Inspection Characteristics, sample procedure, sample drawing procedure and certificate profile.• Configured and executed the shop Floor activities including quality notification, batch Managed quality certificate, release raw material, WIP and finished goods and creating a sales order.• Configured and executed Quality inspection cycle for all bulk delivery, raw material and WIP material that requires sample drawing procedure.• Configured and executed Quality inspection cycle for a product which requires quality inspection before product release and also for product that doesn’t requires quality inspection before release
-
-
SAP PP Consultant (Remote Role)
-
Oct 2017 - May 2018
• Created raw, finished, semi-finished and packaging material code for the production cycle.• Configured relevant material group and material type need in the material master.• Configured in customizing demand management plant parameters for MRP such as MRP groups, MRP controllers, MRP types, planning calendar and lot sizing procedures.• Worked on customization setting for PP Master Data which includes BOM, Routing and work centres and Routing and Control Key in a discrete manufacturing environment.• Configured make to order and make to stock strategies.• Configured PP-MRP processes, classification, batch management and capacity planning.• Configured MRP Total and Single item planning, BOM status and explosion, planning runs and scheduling.• Configured and executed the Shop Floor activities including creation of orders, conversion of planned orders, order release, availability check and order confirmation.• Configured Integration of PP with MM in goods movement, production version, backflushing, automatic good receipt, production order, purchase requisition and purchase order.• Configured and executed production cycle for a product with multi BOM structure and single BOM structure.• Developed user-friendly documentation guide.
-
-
-
Willock Technical Services Design Consult
-
Porthacourt ,Nigeria
-
Process Engineer
-
Jul 2009 - Dec 2012
Developed HYSYS simulation model using Natural Gas Dehydration for the removal of water vapour from gas stream with Tri-ethylene glycol (TEG) to lower the temperature at which water will condense in the stream of NLNG project. Developed HYSYS simulation model using Acid Gas Sweetening for the removal of contaminant like CO2 and H2S with Diethanolamine (DEA) from the NLNG project. Developed HYSYS simulation model for changing the destination condition’s of the fluid of the NLNG project through Compression Stages for pipeline transportation. Gathering gases from different well with different topography for the NLNG project by HYSYS simulation model. Developed HYSYS simulation model for Energy and Material Balanced for the NLG project. Developed HYSYS simulation model for achieving the hydrocarbon dew point of the fluid in the Refrigerated Gas Plant of the NLG project. Developed HYSYS simulation model for NGL Fractionating Train for the separation of heavier hydrocarbon to achieve different specification of the hydrocarbon composition for the LPG component. Provided support for other engineering disciplines and equipment Vendor's on process related issues.
-
-
Education
-
Ladoke Akintola University of Technology
Bachelor of Technology - BTech, Chemical Engineering