John Haug
Sr. Staff Engineer at Interstate Treating Inc- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Missouri Professional Engineer
Missouri Department of Insurance, Financial Institutions & Professional RegistrationJan, 2016- Oct, 2024 -
Texas Professional Engineer
Texas Board of Professional EngineersJan, 2019- Oct, 2024
Experience
-
Interstate Treating Inc
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Sr. Staff Engineer
-
Dec 2018 - Present
Sr. Staff Engineer focusing on natural gas amine treaters and triethylene glycol dehydration proposals for upstream and refining applications. Originate RFQ equipment datasheets for proposal RFQ inquiries. Participate in proposal cost estimating process. Use Promax to troubleshoot/advise clients of their process options. Professional engineer registration in Missouri and Texas. Participated in registering Interstate treating, Inc. as Professional Engineering Firm in the State of Texas. This position requires a State of Texas Professional Engineer License. Background: Use NGPSA, ASTM, ANSI, ASME (including Boiler and Pressure Vessel code) industry code standards. Participate in P&ID reviews, PHA’s, HAZOP’s, Design Reviews, and PSSR’s. Perform QA/QC and/or delegate as appropriate. Use Promax to size Absorbers, separators TEMA and aerial exchangers, pumps and compressors. Review P&ID against Promax SIM sheet PFD, heat and material balances.
-
-
-
The Bergaila Companies
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Project Process Engineer
-
Aug 2018 - Oct 2018
Process Facilities Engineer: Provided engineering assistance in pre-planning Facilities 2019 CAPEX…Reviewed Resolute 2019 production flow forecasts – identify Resolute needs from a facilities perspective… ie: tanks, pumps, pipeline gathering, vessels, compression, compressors, swd’s, Oil, gas, water take away capacities, etc.. Work on facility design, upgrades and process improvements based on flows & flow forecasts. Process modeling, three phase production line sizing calculations., & bench mark capacity of facilities. Identify problems, and capacity issues, increase efficiencies and reduce operational expense Develop project design packages to allow bids for project works. Uses industry experience in production battery, SWD, pipeline gathering, compressor and compressor station experience and knowledge.
-
-
-
Benham, a Haskell Company
-
Architecture and Planning
-
100 - 200 Employee
-
Project Manager
-
Jan 2012 - Mar 2017
* Establish design basis or scope of work via interfacing meetings with client. Identify project deliverables * Collaborate and coordinate discipline leads to produce project deliverables for process, mechanical, electrical, & instrument disciplines. * Work with process engineers to obtain PFDs/PIDs and corresponding heat and material balance. * Prepare equipment data sheets for all equipment, allowing RFQs, budgets, schedules, bid tabs and purchase requisitions to be issued. * Work with discipline engineers to complete detailed engineering packages for client construction management bidding effort.
-
-
-
Kern Oil & Refining Co
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Project Manager
-
Jan 2007 - May 2011
• Prepared AFEs, budget estimates, schedules, work scopes, RFQs for all project labor, materials and equipment, bid tabs and purchase requisitions • Mentored new engineers in the art of project engineering work • Prepared AFEs, budget estimates, schedules, work scopes, RFQs for all project labor, materials and equipment, bid tabs and purchase requisitions • Mentored new engineers in the art of project engineering work
-
-
-
Farnsworth Group, Inc
-
United States
-
Design
-
300 - 400 Employee
-
Senior Project Engineer
-
Jan 2002 - Jan 2003
Developed bid packages for Horizontal Directional Drilling Pipeline crossings Most notable: 10” products line beneath IC/CN railroad yard (19 sets tracks) in Effingham, IL for Marathon Ashland Pipeline Developed bid packages for Horizontal Directional Drilling Pipeline crossings Most notable: 10” products line beneath IC/CN railroad yard (19 sets tracks) in Effingham, IL for Marathon Ashland Pipeline
-
-
-
CTI Field Services Inc
-
United States
-
Construction
-
1 - 100 Employee
-
Senior Project Engineer
-
Sep 1998 - Apr 1999
Prepared Equipment and piping specifications for quotation, bid tab and purchase to BPRP’s. Performed Caesar thermal stress calculations on all hot lines. Prepared budgets and schedules. Prepared Equipment and piping specifications for quotation, bid tab and purchase to BPRP’s. Performed Caesar thermal stress calculations on all hot lines. Prepared budgets and schedules.
-
-
-
Shafer, Kline & Warren
-
United States
-
Construction
-
1 - 100 Employee
-
Project Engineer
-
Oct 1996 - Mar 1998
Developed turnkey bid packages for Horizontal Directional Drilling Pipeline crossings. Most notable is a 24” Missouri River Crossing at Kansas City’s Chouteau Bridge for MGE. Developed turnkey bid packages for Horizontal Directional Drilling Pipeline crossings. Most notable is a 24” Missouri River Crossing at Kansas City’s Chouteau Bridge for MGE.
-
-
-
-
Project Engineer
-
Dec 1995 - Sep 1996
Directed the work of URS engineers to a black book for overall refinery budget: performed project-engineering duties as an in-house client representative to oversee Pritchard engineers for SRUs. Directed the work of URS engineers to a black book for overall refinery budget: performed project-engineering duties as an in-house client representative to oversee Pritchard engineers for SRUs.
-
-
-
Technology Plus, Inc.
-
United States
-
IT Services and IT Consulting
-
1 - 100 Employee
-
Project Manager
-
Sep 1994 - Nov 1995
Guided John Brown discipline engineers to produce engineering project documents and install a Naphtha Splitter Revamp at IRLP. Produced a PFD and material balance for plant wide fuel gas study for future IRLP coker unit, by walking down all fuel gas lines. Successfully prepared scopes, budgets and schedules for 15 Bayer Corporation’s FOE off-site projects. Guided John Brown discipline engineers to produce engineering project documents and install a Naphtha Splitter Revamp at IRLP. Produced a PFD and material balance for plant wide fuel gas study for future IRLP coker unit, by walking down all fuel gas lines. Successfully prepared scopes, budgets and schedules for 15 Bayer Corporation’s FOE off-site projects.
-
-
-
Consultant
-
United States
-
Advertising Services
-
Professional Engineer
-
May 1992 - Aug 1994
Prepared pre-bid engineering packages, including scope definition and utility upgrades, for refinery environmental work, primarily for McDowell Engineering clients: Clark, Amoco, Heritage. Prepared piping bid estimates for Natkin’s successful Foundation Water Project submittal to Anheuser Busch. Prepared pre-bid engineering packages, including scope definition and utility upgrades, for refinery environmental work, primarily for McDowell Engineering clients: Clark, Amoco, Heritage. Prepared piping bid estimates for Natkin’s successful Foundation Water Project submittal to Anheuser Busch.
-
-
-
-
Various - See description
-
Nov 1988 - Apr 1992
Project Engineering Manager: Assesses customer needs via meetings and job specifications. Coordinated all engineering disciplines activity to assure successful completion of design, engineering, procurement, and construction of projects. Initiates and approves ECNs. Process Engineer: Interacts with clients and vendors, develops process control and economics, prepares Process Flow Diagrams, P&IDs; line, instrument, and equipment requirements; safety studies, and safety valve sizing. Piping Engineer: Performs design and engineering of process piping system including stress analysis, shop-fab pipe specifications, conformance to piping codes and client specifications.
-
-
-
PANHANDLE EASTERN PIPELINE
-
United States
-
Oil and Gas
-
1 - 100 Employee
-
Various - see description
-
May 1979 - Nov 1988
Division Engineer: Member of Gas Research Institute and American Gas Association technical marketing committees assessed industrial gas markets to allocate corporate and industry funds for new technology development and report findings to Board of Directors & marketing. Responsible for start-up and commissioning of pipeline projects. Engineer: Produced equipment specifications and matching design guides for project engineering use. Created Panhandles first master PFD/P&ID template. Performed vapor-liquid equilibria studies for all Panhandle’s pipeline systems. Assistant Engineer: Resident field engineer for 5 pipeline station construction projects. Design, optimize, inspect, start-up, and troubleshoot natural gas processing plants. Developed a simple repeatable field air compressor test.
-
-
Education
-
University of Missouri-Rolla
Bachelor’s Degree, Chemical Engineering -
University of Missouri-Kansas City
Master of Business Administration (M.B.A.), Finance