John-Eric Guillory

Project Engineer at EXP Engineering International, LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Fort Worth, Texas, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Oil and Gas
    • 1 - 100 Employee
    • Project Engineer
      • Sep 2014 - Present

      Project Engineer providing electrical and mechanical engineering expertise to various projects. Performed a storage facility infrastructure debottlenecking FEED study for increased throughput. • Performed hydraulic analysis of existing infrastructure to determine expected future output. Analysis examined terminal header sizes, terminal interconnecting pipeline sizes and pump sizes. • Engineered solutions to minimize bottlenecks at existing terminals. • Collaborated with Operations and Commercial group to develop cost estimates for future delivery points. Marathon Oil Project – Kenedy, TX (July 2012 – August 2015) • Designed and supervised construction of gathering facility designed to handle 30,000 barrels of oil and 80 MMCF of gas per day. • Designed and installed 10 Reid Vapor Pressure (RVP) reduction systems and 10 RVP analyzer systems at existing facilities. Systems consisted of: pumps, heaters, vapor recovery towers, tanks and analyzers. • Designed chassis layouts and I/O lists for facility PLC (Allen Bradley ControlLogix) from facility P&IDs. • Designed card layouts and I/O lists for facility liquid and gas measurement flow computers (Emerson ROC800) • Specified and ordered instruments (pressure, temperature and flow transmitters), PLC’s, PLC cabinets and other equipment for gathering and processing facilities. • Specified and ordered 480V Motor Control Centers based on current and future facility load demands. • Loop checked, tested and commissioned new instruments and control valves, shutdown valves and ESD systems for new facility builds and expansions. • Commissioned startup of new facilities and existing facility expansions. • Participated in design review meetings, PHAs, and other project meetings to provide feedback for any issues that arose. • Engineered solutions to reliability issues that arose with facility instruments. Show less

    • Oil and Gas
    • 100 - 200 Employee
    • Engineer II
      • Mar 2011 - Sep 2014

      Marathon Oil Project – Kenedy, TX (July 2012 – August 2015) Served as 3rd Party Contract I&E Project Engineer providing support to Eagle Ford Shale Asset Team. • Designed and supervised construction of gathering facilities designed to handle 20,000 barrels of oil and 60 MMCF of gas per day. Completed packages consisted of: cable schedules, wiring diagrams, load lists, typical instrument installation drawings, one-lines and area classification drawings. • Designed chassis layouts and I/O lists for facility PLC (Allen Bradley ControlLogix) from facility P&IDs. • Designed card layouts and I/O lists for facility liquid and gas measurement flow computers (Emerson ROC800) • Specified and ordered instruments (pressure, temperature and flow transmitters), PLC’s, PLC cabinets and other equipment for gathering and processing facilities. • Specified and ordered 480V Motor Control Centers based on current and future facility load demands. • Loop checked, tested and commissioned new instruments and control valves, shutdown valves and ESD systems for new facility builds and expansions. • Commissioned startup of new facilities and existing facility expansions. • Participated in design review meetings, PHAs, and other project meetings to provide feedback for any issues that arose. • Engineered solutions to reliability issues that arose with facility instruments. Haynesville Shale Project, Phase V A – Mansfield, LA • Designed and served as field engineer for 25 miles of natural gas pipeline with launcher and receiver assemblies. • Created material requisitions, ordered materials and ensured timely completion of facility. • Prepared and reviewed road crossing permits, alignment sheets, HDDs and bill of materials list for pipeline. • Worked with procurement and material vendors to get shortest lead times to ensure the timely completion of project. Show less

    • United States
    • Oil and Gas
    • 200 - 300 Employee
    • Engineer
      • Jul 2010 - Feb 2011

      Haynesville Shale Project, Phase IV – San Augustine, TX • Engineered 30 miles of natural gas pipeline, launcher and receiver sets and metering facilities. • Responsible for reviewing all road crossing permits, alignment sheets, HDDs and bill of material lists for natural gas pipeline and metering facilities. • Completed as-built job book packages containing drawings, field reports and material test reports. Haynesville Shale Project, Phase IV – San Augustine, TX • Engineered 30 miles of natural gas pipeline, launcher and receiver sets and metering facilities. • Responsible for reviewing all road crossing permits, alignment sheets, HDDs and bill of material lists for natural gas pipeline and metering facilities. • Completed as-built job book packages containing drawings, field reports and material test reports.

Education

  • Louisiana State University and Agricultural and Mechanical College
    Bachelor of Science (B.S.), Electrical Engineering
    2006 - 2010

Community

You need to have a working account to view this content. Click here to join now