John Chiles
Principal, Transmission Services at GDS Associates, Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Claudia Pankowski
John is an excellent Engineer that worked meticulously interpreting new NERC standards and their effect on the Company. He demonstrated deep knowledge of regulation through a superb final product. His work ethic is impeccable - a valued asset in the compliance world.
Claudia Pankowski
John is an excellent Engineer that worked meticulously interpreting new NERC standards and their effect on the Company. He demonstrated deep knowledge of regulation through a superb final product. His work ethic is impeccable - a valued asset in the compliance world.
Claudia Pankowski
John is an excellent Engineer that worked meticulously interpreting new NERC standards and their effect on the Company. He demonstrated deep knowledge of regulation through a superb final product. His work ethic is impeccable - a valued asset in the compliance world.
Claudia Pankowski
John is an excellent Engineer that worked meticulously interpreting new NERC standards and their effect on the Company. He demonstrated deep knowledge of regulation through a superb final product. His work ethic is impeccable - a valued asset in the compliance world.
Experience
-
GDS Associates, Inc.
-
United States
-
Utilities
-
100 - 200 Employee
-
Principal, Transmission Services
-
Jan 2010 - Present
Provide technical guidance and policy expertise to clients throughout the US, with extensive experience in energy market design, strategic planning in RTO stakeholder forums, interconnection and transfer study analysis, NERC compliance, transmission policy and planning. Serve as expert witness on issues before state utility commissions and Federal Energy Regulatory Commission.
-
-
Executive Engineer
-
Jan 2004 - Jan 2010
Provide technical and regulatory policy expertise on energy market design, power system operations, transmission planning, interconnection policy, system loss analysis and FERC energy policy.
-
-
-
TECO Energy
-
United States
-
Utilities
-
700 & Above Employee
-
Manager - Transmision
-
2000 - 2004
Independent Power Producer Transmission, Interconnection, and Energy Trading Support for largest IPP in the Western Interconnection. Manager of Generation-only Balancing Authority in WECC, with transmission policy and planning experience in Entergy, ERCOT, WECC and PJM. Independent Power Producer Transmission, Interconnection, and Energy Trading Support for largest IPP in the Western Interconnection. Manager of Generation-only Balancing Authority in WECC, with transmission policy and planning experience in Entergy, ERCOT, WECC and PJM.
-
-
-
TECO Power Services
-
Renewable Energy Semiconductor Manufacturing
-
Manager, Transmission
-
2000 - 2003
Assist in the procurement of transmission service for the two largest IPPs in the US, support daily trading activities in Entergy and WECC. Develop optimization algorithm to maximize plant value including transmission availability, rates and loss impacts. Assist in the procurement of transmission service for the two largest IPPs in the US, support daily trading activities in Entergy and WECC. Develop optimization algorithm to maximize plant value including transmission availability, rates and loss impacts.
-
-
Education
-
University of South Florida