John Campbell

Project/Senior site Manager at VIDI CONSTRUCTION LTD
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Project/Senior site Manager
      • May 2019 - Present

      A roof extension for 2nr penthouse and conversion of offices into 11 apartments - Contract value £1.45 million. A roof extension for 2nr penthouse and conversion of offices into 11 apartments - Contract value £1.45 million.

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Site Manager
      • Jun 2017 - Mar 2019

      Goldhawk - Shepherd’s Bush. London – Remodel of a historic pub (with a retained front façade) – into 10 new apartments including new basement lightwells – contract value £3.6 million. St Aloysuis Covent, Euston, London – Internal structural remodeling of the existing convent and a rear 3 story extension – contract value £1.6 million. Goldhawk - Shepherd’s Bush. London – Remodel of a historic pub (with a retained front façade) – into 10 new apartments including new basement lightwells – contract value £3.6 million. St Aloysuis Covent, Euston, London – Internal structural remodeling of the existing convent and a rear 3 story extension – contract value £1.6 million.

  • Cav Construction (UK) Ltd
    • London, United Kingdom
    • Project Manager
      • May 2015 - Jun 2017

      Lorimers – 2 Projects - Remodeling of existing structure with 2 storey extension above occupied ground floor retail unit – contract value £1.4 million (Banstead) – £1.2 million (Haywards Heath). Alchemist – Demolition (with retained front façade) - rebuild of the historic pub – including new basement and 6 new flats – contract value £1.5m (Shell and core) New flats Crystal Palace – Phase 1 – Substructure - 5m deep basement excavation, piling – contract value £85K. Flat conversion, Coulsdon – demolition of internal structure, basement excavation and fit out – contract value £346K. Show less

  • The Stoneforce Group
    • London, United Kingdom
    • Project manager/Site manager
      • Oct 2013 - May 2015

      Press nightclub - Leicester Square, London – Ground floor and basement internal remodeling of structure and fit out – contract value £1 million. Residence Belgravia – 3 storey - internal remodeling of structure and fit out – contract value 480k. Residence Earls Court – Flat apartment within a residential block – internal demolition and extensive modification of structure – 500K Press nightclub - Leicester Square, London – Ground floor and basement internal remodeling of structure and fit out – contract value £1 million. Residence Belgravia – 3 storey - internal remodeling of structure and fit out – contract value 480k. Residence Earls Court – Flat apartment within a residential block – internal demolition and extensive modification of structure – 500K

    • United Kingdom
    • Construction
    • 400 - 500 Employee
    • Site Manager
      • May 2013 - Oct 2013

      Project: Lyric Theatre, Hammersmith, London. Mace – Demolition package. Demolition of a single storey RC structure – Princess Court - including temporary waterproofing of Princess Court floor slab above Kings Mall shopping complex. Project: Victory House, Leicester Square, London. Pre-site preparations for the proposed demolition of a six storey, basement and sub-basement structure whilst retaining the listed façade. Project: Lyric Theatre, Hammersmith, London. Mace – Demolition package. Demolition of a single storey RC structure – Princess Court - including temporary waterproofing of Princess Court floor slab above Kings Mall shopping complex. Project: Victory House, Leicester Square, London. Pre-site preparations for the proposed demolition of a six storey, basement and sub-basement structure whilst retaining the listed façade.

    • Architect
      • Mar 2013 - May 2013

      Project: Private house remodel and extension, Chessington, Surrey. Project: Private house remodel and extension, Chessington, Surrey.

  • The Stoneforce Group
    • London, United Kingdom
    • Project Manager
      • Jun 2012 - Feb 2013

      Project: Phase 2 - Guy Richie’s residence, London. Extensive refurbishment and restoration of a grade 1 listed building including 3 storey extension with basement pool and spa. O/A contract value £7.75 Million. Project: Phase 2 - Guy Richie’s residence, London. Extensive refurbishment and restoration of a grade 1 listed building including 3 storey extension with basement pool and spa. O/A contract value £7.75 Million.

    • United Kingdom
    • Construction
    • 1 - 100 Employee
    • Site Manager
      • Aug 2011 - Jun 2012

      Project: Grade 1 listed refurbishment and remodelling of luxurious penthouse, south Kensington, London (formally Ava Gardner’s residence). Contract value £1.7 Million. Project: Grade 1 listed refurbishment and remodelling of luxurious penthouse, south Kensington, London (formally Ava Gardner’s residence). Contract value £1.7 Million.

  • J Kean Properties
    • London, United Kingdom
    • Architect
      • Aug 2009 - Jul 2011

      Project: Advisor in various private design and construction projects. Project: Advisor in various private design and construction projects.

    • Site Manager
      • Apr 2008 - Aug 2009

      Project: - Natural History Museum, London. Remodelling of the Events kitchen. Contract value £100k Project: – Penthouse, Regents Park, London. Remodelling of a luxurious Penthouse. Contract value £1.7 million. Project: – Dwyer Plc. corporate office, Mayfair, London Remodelling luxurious commercial offices. Contract value £650, 000. Project: - Natural History Museum, London. Remodelling of the Events kitchen. Contract value £100k Project: – Penthouse, Regents Park, London. Remodelling of a luxurious Penthouse. Contract value £1.7 million. Project: – Dwyer Plc. corporate office, Mayfair, London Remodelling luxurious commercial offices. Contract value £650, 000.

    • Director
      • Jul 2004 - Apr 2008

      Client: Cherwell Investments Project: – New build 3 Apartments, Balham, London. Contract value £175, 872 Projects: – New build 4 houses, Wimbledon, London. Contract value £516, 669 Projects: – Demolition, remodeling/new build 10 high quality apartments and refurbishment of 3 retail units, Clapham, London. Contract value £790, 000 Project: – New build apartments and High quality restaurant refurbishment, Clapham North, London for AYH PLC/Alba Pizzeria Partnership. Contract value £300,000 Show less

    • Construction
    • 1 - 100 Employee
    • Designer
      • Jan 1998 - Jul 2004

      Project: – Canary Wharf – various architectural metalwork packages. Project: – Canary Wharf – various architectural metalwork packages.

    • Technical design and Construction Manager
      • Jan 1995 - Dec 1997

      Position: Technical design and Construction manager Project: Remodelling luxurious town house Belgrave Square, London. Contract value £10 M. Project: New build luxurious Country house within 180 acres site, Egham Surrey. Contract value £15 M. Position: Technical design and Construction manager Project: Remodelling luxurious town house Belgrave Square, London. Contract value £10 M. Project: New build luxurious Country house within 180 acres site, Egham Surrey. Contract value £15 M.

  • Various Architectural practices
    • London, United Kingdom
    • Architect
      • Jan 1986 - Jan 1995

      Fitzroy Robinson, Elsworth Sykes, Scott Brownrigg and Turner, PDP, Thomas Ford and Partners, WS Akins. Fitzroy Robinson, Elsworth Sykes, Scott Brownrigg and Turner, PDP, Thomas Ford and Partners, WS Akins.

Education

  • University of Dundee
    BSc and MA in Architecture, Architecture
    1986 - 1993

Community

You need to have a working account to view this content. Click here to join now