Oct 2022 - Present
carried out inspection activities for architecture carried out inspection activities for architecture
-
-
-
North Oil Company Qatar
-
Qatar
-
Oil and Gas
-
700 & Above Employee
-
Yard STR Supervisor
-
Feb 2022 - Oct 2022
-
-
-
Specialist Services
-
United Arab Emirates
-
Oil and Gas
-
200 - 300 Employee
-
Construction Supervisor
-
Aug 2020 - Apr 2021
supervise all living quarter integrated activities for structure, architecture, piping, hvac. Advised and discuss with client any site technical issue. to ensure all inspection report have been approved by client. supervise all living quarter integrated activities for structure, architecture, piping, hvac. Advised and discuss with client any site technical issue. to ensure all inspection report have been approved by client.
-
-
-
Mubadala Energy
-
United Arab Emirates
-
Oil and Gas
-
400 - 500 Employee
-
Senior LQ site support
-
Jul 2019 - Mar 2021
Monitor all LQ daily activities work.( structure, architecture, piping, hvac, E&I ) Ensure all activities as per Drawing and company requirement. Ensure work progress as per schedule. Witness inspection as per ITP. Liaise all inspection including NDT has been done. Carried out inspection as per ITP. witness WQT, WPQT and mechanical test involved in weekly progress meeting. Check and make comment any inspection report. Monitor all LQ daily activities work.( structure, architecture, piping, hvac, E&I ) Ensure all activities as per Drawing and company requirement. Ensure work progress as per schedule. Witness inspection as per ITP. Liaise all inspection including NDT has been done. Carried out inspection as per ITP. witness WQT, WPQT and mechanical test involved in weekly progress meeting. Check and make comment any inspection report.
-
-
-
MJ Engineering Inspection Services
-
Australia
-
Oil and Gas
-
1 - 100 Employee
-
piping inspector
-
Aug 2018 - Jun 2019
Carried out line walk and came out punch list. ensure site line mark up and flow lie as per drawing. LDAR PSV install as per drawing. prepare report. Carried out line walk and came out punch list. ensure site line mark up and flow lie as per drawing. LDAR PSV install as per drawing. prepare report.
-
-
-
WTC Sdn Bhd
-
Rapid Pengerang
-
Site Supervisor
-
Sep 2017 - Apr 2018
involved in all infra and structure work. arrangement manpower as per site work progress requirement. liaise with client any site issue. involved in all infra and structure work. arrangement manpower as per site work progress requirement. liaise with client any site issue.
-
-
-
Bureau Veritas Group
-
France
-
Environmental Services
-
700 & Above Employee
-
high skill structure inspector
-
Jan 2015 - Mar 2017
carried out inspection ( fit-up, visual, etc ) to ensure all activities as per drawing and spec. witness welder qualification test. liaise with contractor any quality issue. involved in progress meeting. final inspection before load out inspection. review and approved report for final documentation. carried out inspection ( fit-up, visual, etc ) to ensure all activities as per drawing and spec. witness welder qualification test. liaise with contractor any quality issue. involved in progress meeting. final inspection before load out inspection. review and approved report for final documentation.
-
-
-
Frontken (East malaysia) Sdn Bhd
-
Industrial Machinery Manufacturing
-
1 - 100 Employee
-
Piping Superintendent
-
Apr 2014 - Nov 2014
-
-
-
Biendong POC Petrovitenam
-
Vungtau Vietnam
-
construction supervisor/inspector (architecture/hvac)
-
Jul 2011 - Jul 2012
supervise and carried out all activities for architecture and hvac. supervise and carried out all activities for architecture and hvac.
-
-
-
Malaysia Marine & Heavy Engineering
-
Malaysia
-
Oil and Gas
-
700 & Above Employee
-
construction supervisor ( architectural/ structural/ HVAC )
-
Mar 2009 - Sep 2011
working as a Architecture/HVAC/Structure and Piping Supervisor and Inspector involved in MCR-A project for Petronas Carigali Turkmenistan working as a Architecture/HVAC/Structure and Piping Supervisor and Inspector involved in MCR-A project for Petronas Carigali Turkmenistan
-
-
-
Sime Darby Engineering
-
Pasir Gudang Johor Malaysia
-
construction supervisor / inspector ( structural/ architectural/ piping )
-
1998 - 2006
-to ensured all activities follow procedure and specification -in charge and carried out inspection for welder qualification Test and welding procedure qualification test. -Carried out material verification ,fit-up and visual inspection. - liaise and request to NDT department any joint required NDT. -liaising with client rep for any change order or variation order - carried out line check for piping and ensure as per drawing. - raised red line mark up to engineering any site change. - complied test pack for piping and ensure all document completed -Monitor and verified hydrotest and flushing activities and documentation - to raise NCR any activity not as per specification - Liaising with Engineering Department regarding all engineering Issued. -To liaise with the Project Manager on the proper implementation and execution of works to ensure that all works including those executed by sub-contractors are in accordance with the drawings, specifications and conditions in the main contract - To plan in advance all site activities and the proper execution -To maintain and update daily a proper Site Diary to record all activities - Resolved all problems arises due to design changes and -liaising with client representative for any change order or variation order. - liaising with material control for dispatching construction material to site area. - Liaising with procurement and engineering department any material issued. - Site monitoring to ensure all work activity according to specification and requirements. - Request all facilities and consumable required at site during work activity - Verified and approved permit to work. - monitor and advise any unsafe activity or condition and ensure - to ensure all NCR/ punch list closed before MCD. - supervised all load out activity such as installation of skid way. - supervised and monitor tie down activity. Show less
-
-
-
promet fabricator sdn bhd
-
nalaysia
-
structure,architecture, piping supervisor/ inspector
-
Aug 1993 - Aug 1998
monitor daily progress and carried out inspection as per drawing and specifications also all activity in save condition. liaise with client any quality issue liaise with engineering any drawing issue raised NCR if there is any quality issue. raised punch list any uncompleted or carried over work monitor daily progress and carried out inspection as per drawing and specifications also all activity in save condition. liaise with client any quality issue liaise with engineering any drawing issue raised NCR if there is any quality issue. raised punch list any uncompleted or carried over work
-
-