Joel Teo Ming Wai

Project Planner at RPM Schedulers Sdn Bhd
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Shah Alam, Selangor, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Malaysia
    • Construction
    • 1 - 100 Employee
    • Project Planner
      • Aug 2020 - Present

      Completed Project: 1) BES REHAB PROJECT: Design, Supply, Install, Testing and Commissioning Works for: PHASE 1 – Cooling Towers, Condenser Water Pipe Works, Make up Tank Replacement, New Air Conditioning Main Switchboard and all relevant works and, PHASE 2 – Chillers, Chilled Water Distribution Pipeworks, Pumps, Plate Heat Exchanger and all relevant works for Bangsar Energy System (BES) Plant, Bangsar, Kuala Lumpur. 2) Project Lion - Data Centre Design and Build Main Contract for the Detailed Design, Authority Submissions / Permitting, Supply, Delivery, Installation, Testing and Commissioning and Support During Defects Liability Period of Project Lion - A New 8 Mw It Power, Greenfield Data Centre in Bukit Jalil, Kuala Lumpur - Assisting Contractor in doing the Baseline - Progress reporting for both Weekly and Monthly - Assist Contractor in mitigation works - Prepare 3 Week Look Ahead (Last Planner) and 12 Week Look Ahead Works - Prepare Rev 3 EOT Programme with new Completion Date after Covid - 19 shutdown On-Going Project 1) KLIA Co-Generation: Design, Engineering, Procurement, Installation, Construction, Testing and Commissioning for or in Relation to the Improvement Works and the Conversion Works ("Works”) - Prepare project baseline with cost loaded - Prepare Site Logistic Plan for the Construction Team - Generate Physical and Financial S-Curve - Reporting in the 2 Week Look Ahead and 12 Weeks Look Ahead - Narrowing the scope of Engineering stage by expediting the Engineering - Progress Report for Daily, Weekly and Monthly - Coordinate with Sub-Contractor/Supplier on the work deliverables - Progress Claim Evaluation - Site Evaluation based on Progress Claim submitted - EOT Application and Revision Programme 2) BES REHAB PROJECT Phase 2: Design, Supply, Install, Testing and Commissioning Works for Piping Works to TNB Gold, Replace of Chillers and all associated works: Show less

    • Malaysia
    • Civil Engineering
    • 200 - 300 Employee
    • Assistant Planner
      • Feb 2019 - Aug 2020

      a) Prepare Primavera P6 Construction Programme for tender stage b) Prepare Summary Programme, Manpower, Machinery and Overall Implementation Plan for tender submission c) Liase with Machinery team on the logistic sequence. d) Assist in EOT Application for Lendlease Mall and West Coast Expressway a) Prepare Primavera P6 Construction Programme for tender stage b) Prepare Summary Programme, Manpower, Machinery and Overall Implementation Plan for tender submission c) Liase with Machinery team on the logistic sequence. d) Assist in EOT Application for Lendlease Mall and West Coast Expressway

    • Malaysia
    • Real Estate
    • 700 & Above Employee
    • Intern (Town Planning)
      • Sep 2018 - Jan 2019

Education

  • Universiti Utara Malaysia
    Bachelor's degree, Land Use Planning and Management/Development
    2015 - 2019