Joel Cepeda
Estimator/Project Manager at Cruising Kitchens- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Cruising Kitchens
-
United States
-
Motor Vehicle Manufacturing
-
1 - 100 Employee
-
Estimator/Project Manager
-
Aug 2021 - Present
-
-
-
Alpha Building Corporation
-
United States
-
Construction
-
1 - 100 Employee
-
Construction Estimator
-
Jun 2020 - Aug 2021
-
-
-
Yates Construction
-
United States
-
Construction
-
700 & Above Employee
-
Estimator
-
Jan 2019 - Jun 2020
-
-
-
Guido Companies
-
United States
-
Construction
-
1 - 100 Employee
-
Project Engineer
-
Aug 2017 - Nov 2018
Assisted project personnel in planning, directing and coordinating activities of designated projects to ensure that the project goals were accomplished within prescribed time frame and funding parameters. Assisted project personnel in planning, directing and coordinating activities of designated projects to ensure that the project goals were accomplished within prescribed time frame and funding parameters.
-
-
-
US LBM
-
Wholesale Building Materials
-
700 & Above Employee
-
Inside Sales of Commercial Building Supplies
-
Jan 2015 - Aug 2017
~Oversaw daily operations for the commercial department, working with the Chief Operating Officer in leading a team of 2 Inside Salesmen, 1 Dispatcher, 4 forklift operators and 4 CDL Drivers.~Strategically planned , design and implement logistics of advanced warehouse inventory control system.~Managed the accurate and timely processing of up to 500 invoices per month, validating content and resolve various discrepancies with pricing and materials.~Restructured thorough cross-checking of pack-lists, receivers and invoices that halted a previous history of thousands of dollars in over payments to suppliers.
-
-
Designer
-
Apr 2012 - Dec 2014
~ Designed engineered wood floor systems for residential and commercial structures.~ Lead designer of Lennar Homes in Texas and responsible for all projects on time and were to bid within 3% of all cost estimates.~ Increased design lead times by 90% through implementation of online repair apps for red tag repairs.~ Instituted job site visits, collaborated with superintendents and framers through the institution of job site visits, in an effort to educate and limit repairs and potential issues, ultimately reduced callbacks by 60%.
-
-
-
Cedar Creek
-
United States
-
Wholesale
-
100 - 200 Employee
-
Designer
-
Jan 2008 - Jun 2010
~ Monitored inventory by ordering 100% of all engineered wood products for the San Antonio branch. ~ Coordinated the use of engineered wood floor systems for the city of Houston and surrounding areas. ~ Designed with various engineered wood products to determine the most efficient and cost effective engineered wood floor system while adhering to code criteria compliance. ~ Interpreted architectural plans for residential and commercial structures to design floor joist layouts using I-joists and laminated beams. ~ Successfully transitioned and assisted during takeover from Alamo Forest Products to Cedar Creek Lumber.
-
-
Education
-
Texas State University
Master’s Degree, Master of Science in Engineering Technology - Construction -
Sam Houston State University
Bachelor’s Degree, Industrial Technology