Joel Albarran

at EcoEléctrica
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Guayanilla, Guayanilla, Puerto Rico, PR
Languages
  • Spanish -
  • English -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Building Ovation Graphics - OV210
    Emerson
    Dec, 2022
    - Oct, 2024
  • PROT 401: Protecting Power Systems for Engineers
    Schweitzer Engineering Laboratories (SEL)
    Aug, 2022
    - Oct, 2024
  • CONDOR2 Seismic Monitoring System Operational & Maintenance Training
    Kinemetrics, Inc.
    Jan, 2022
    - Oct, 2024
  • Ovation Building & Maintaining Ovation Control - OV200
    Emerson
    May, 2020
    - Oct, 2024
  • Ovation Data Acquisition - OV100
    Emerson
    Mar, 2019
    - Oct, 2024
  • RCM-R Yellow Belt
    PdMTech
    Mar, 2018
    - Oct, 2024

Experience

    • Puerto Rico
    • Utilities
    • 1 - 100 Employee
      • Apr 2023 - Present

      • Jan 2019 - Present

      The responsibilities consist on monitoring and maintain the Distributed Control System (DCS) in optimal condition and ensure the excellent operation. Develop and implement control logics to improve the process and equipment protections.Create and configure new I/O point, wire and troubleshoot instrumentation, support maintenance activities and execute control system regulatory test for regulatory agencies.I was the leader of the evergreen program, I upgrade the following equipment from WDPF to Ovation I/O: controllers, I/O cards, cabinets, workstations, servers, switches, software and cybersecurity software. I was trained (OV100, OV200 and OV210).I was trained by SEL University, course PROT401 to have the basic knowledge on electrical protective device and how to analyze the failures. Knowledge using ACSelerator software, ENOSERV software, Test Universe Software and OMICRON testing device.In 2021 EcoElectrica add a new facility TLF (Truck Unloading Facility) and I was the control system engineer that lead this project and merge the external control system (PLC) with Ovation. Show less

      • Jun 2017 - Jan 2019

      I obtained a yellow belt in RCM (Reliability Centered in Maintenance) Certification. As part of my responsibilities I develop new strategies to improve and monitor the maintenance performance.One achievements in my position was, introduce the reliability culture in the facility providing tools to monitor assets (RCM) and reducing the preventive & corrective maintenance, implementing different technologies like: Ultrasound, Thermography, Motor Testing, Infrared & CBM (Condition Based Maintenance).I create and implemented a new Work Permit module for the facility that attach every action taken to theCMMS linking the permits to the work orders. Show less

      • Mar 2017 - Jun 2017

      I was responsible of monitoring and troubleshooting auxiliary equipment, before report any corrective action. Execute ECP/LOTO to maintenance department, that need isolate a hazardous energy.I was trained on power plant operation process, HAZMAT, HAZOP, CPR and LNG Firefighting.Analyze and ensure the HRSG are running in excellent water parameters from laboratory: pH,conductivity, dissolved oxygen, chloride and phosphate.

      • Jun 2016 - Jun 2017

      I implemented a calibration module in the CMMS providing more efficiency in the I&C department.Experience creating inventory for assets(max and min) . I create a tool to reduce maintenance departments work orders backlog.Implementation of digital checklist for work orders to have better documentation and orders follow up.I worked with ISO 50001 and the implementation requirements for the facility.Knowledge with the Power Plant, LNG and Water Treatment operation process, ISO/OSHA regulations,NEC, EPA, FERC. Show less

      • Jan 2016 - May 2016

      I got knowledge with the CMMS, creating preventive, corrective and predictive maintenance.Experience scheduling and planning work order for the different departments (electrical, instrumentationand mechanical).I developed and implemented the CMMS on mobile devices reducing the documentation time andimproving the execution time of the employees.

Education

  • Inter American University of Puerto Rico
    Bachelor’s Degree, Electrical Engineering
    2009 - 2016

Community

You need to have a working account to view this content. Click here to join now