Joe Sollner

Construction Project/Development Manager at Caravan and Motorhome Club
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
UK

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • SMSTS - Site management Safety Training Scheme
    CITB
    Jul, 2018
    - Nov, 2024
  • White - Academically Qualified Person CSCS Card
    Construction Skills Certification Scheme (CSCS)
    Apr, 2018
    - Nov, 2024

Experience

    • United Kingdom
    • Travel Arrangements
    • 300 - 400 Employee
    • Construction Project/Development Manager
      • Jan 2016 - Present

      Current projects include; the close out of (3no.) 2021/22 schemes, ongoing delivery of 3No. 2022/23 projects including the full site refurbishments (Inc. facilities blocks, site wide works, M&E and accommodation units) of major works schemes in Yorkshire and Nottinghamshire circa £2.6m and £2.4m and a £350k project in Sussex as well as feasibility and planning works for upcoming projects in 2023/24 and beyond. Key roles include the management of multiple ongoing projects (nationwide) throughout the project life cycle from inception through to completion, ranging from £100,000 to £3m. Regular activities result in the effective implementation of Project Management, including; preparation and distribution of CAPEX reports to key stakeholders, monitoring works, maintaining costs, managing risks and ensuring health and safety is maintained, chairing monthly site meetings, liaising with external consultants (QS, M&E, Structural Engineer etc.) and contractors, ensuring the framework agreement (JCT) is adhered to, close out, handover files and documentation as well as assisting the Principal Development Manager, Head of Estates and Directors as required. Provide written reports, monthly progress reports and cost estimates as well as providing value for money by ensuring all projects are delivered to the time, cost and quality expected using the standards provided. Ensuring all necessary planning consents, building regulations and legislation are adhered to throughout and to provide expertise and advice as required.

    • Architectural Technician
      • Aug 2007 - Dec 2015

      Technical Resources:Using Computer Aided Drawing (CAD), carry out detailed design work for site layouts, detailed sections and for individual constructional features and provide technical drawings, including preparation and submission of planning and building regulations applications and preparatory work in discussions with and engagement of building contractors and to support Development section staff in fulfilling their objectives.Sites Records:Using CAD, prepare to agreed programmes and required format, accurate, updated “as-built” site plans which provide the details needed by Regional and Development Managers, Consultants and Contractors when planning and executing maintenance /development work and record keeping.

    • United Kingdom
    • Construction
    • 200 - 300 Employee
    • Computer Aided Design Technician and Decent Homes Surveyor
      • May 2006 - Aug 2007

      AutoCAD – Working on technical drawings, including foundations, elevations, plans and sections and assisting engineers as required. Working on behalf of local authorities surveying to the Decent Homes level in Newark, Sherwood and Bassetlaw districts. Areas covered include internal inspections (walls, floors, ceilings, damp problems, kitchens, bathrooms); External surveys (roofs, walls, outhouses, dpc’s, windows, doors, and paths). AutoCAD – Working on technical drawings, including foundations, elevations, plans and sections and assisting engineers as required. Working on behalf of local authorities surveying to the Decent Homes level in Newark, Sherwood and Bassetlaw districts. Areas covered include internal inspections (walls, floors, ceilings, damp problems, kitchens, bathrooms); External surveys (roofs, walls, outhouses, dpc’s, windows, doors, and paths).

    • Decent Homes Surveyor
      • Apr 2005 - May 2006

      Carrying out stock condition surveys, both internally and externally using palm held devices. Carrying out detailed AutoCAD plans showing the services locations and general footprints and elevations Carrying out stock condition surveys, both internally and externally using palm held devices. Carrying out detailed AutoCAD plans showing the services locations and general footprints and elevations

Education

  • University of Brighton
    Bachelor's degree, Project management for Construction - Part Time Basis
    2013 - 2017
  • Nottingham Trent University
    UFD Building Design and Technology, Building Construction Technology
    2002 - 2005

Community

You need to have a working account to view this content. Click here to join now