Joe Ogilvie
Surveyor at Athabaskan Resource Company- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Athabaskan Resource Company
-
Canada
-
Oil and Gas
-
1 - 100 Employee
-
Surveyor
-
Jun 2015 - Present
Athabaskan at the Plant 24 Expansion Project is responsible for QC/ QA, Settlement monitoring of structures, Asbuilding existing Structures and Tie in points for planning and maintaining site control directly for CNRL Athabaskan at the Plant 24 Expansion Project is responsible for QC/ QA, Settlement monitoring of structures, Asbuilding existing Structures and Tie in points for planning and maintaining site control directly for CNRL
-
-
-
Inline Group Inc.
-
Canada
-
Civil Engineering
-
100 - 200 Employee
-
Surveyor
-
Sep 2014 - Jun 2015
The Fort Hills Project is a new Open Pit Oil Sand Mine and is 100% new construction. Inline was responsible for QC/ QA, Lay out for ground disturbance permits, Asbiulding for planning purposes and maintaining the site control network directly for Suncor. As well as providing a wide range survey support for many major contractors involved with the project. The Fort Hills Project is a new Open Pit Oil Sand Mine and is 100% new construction. Inline was responsible for QC/ QA, Lay out for ground disturbance permits, Asbiulding for planning purposes and maintaining the site control network directly for Suncor. As well as providing a wide range survey support for many major contractors involved with the project.
-
-
-
Athabaskan Resource Company
-
Canada
-
Oil and Gas
-
1 - 100 Employee
-
Major Projects Sureyor
-
Jul 2012 - Aug 2014
The Athabaskan Major Projects group at Shell/ Albian Sands is responsible for providing survey support (for Shell and most contractors on site) for a wide variety of construction projects from Large to small. The Athabaskan Major Projects group at Shell/ Albian Sands is responsible for providing survey support (for Shell and most contractors on site) for a wide variety of construction projects from Large to small.
-
-
-
Kiewit
-
United States
-
Construction
-
700 & Above Employee
-
Surveyor
-
Sep 2008 - Jun 2012
The PM/ H1 project was a massive infrastructure upgrade to the existing Highway 1 transportation route. Upgrading the highway from a two lane road system into an eight to ten lane system. Upgrades to on/ off ramps, interchanges, theater streets, underground utilities, creek and water way diversions and underground pipe line upgrades
-
-
Survey Foreman
-
Feb 2007 - Aug 2008
Christina Lake (Phase 2) project was a major expansion to an existing SAGD facility. It involved tripling the size of the processing plant site and adding three new well sites, road and pipe line networks
-
-