Joe Lum

Analyst at ValueCAP
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Petaling Jaya, Selangor, Malaysia, MY

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Malaysia
    • Investment Management
    • 1 - 100 Employee
    • Analyst
      • Sep 2018 - Present

      • Coverage on Utilities, Plantation, Conglomerates, Construction and Building Materials sector • Coverage on Utilities, Plantation, Conglomerates, Construction and Building Materials sector

    • Malaysia
    • Financial Services
    • 700 & Above Employee
    • Equity Analyst
      • Jul 2015 - Sep 2018

      • Covered the Aviation, Construction, Building materials and Oil & Gas sector. • Service key clients from EPF, KWAP, LTH (Government linked institutional investors) and other mutual funds. • Look out for under researched ideas outside coverage. • Meetings with management if stock deem marketable and appealing • Compilation of data for trend studies. If no readily available data in regards for intended study – will try to look out for other benchmarks to ascertain/spot the trend. Show less

    • Civil Engineering
    • 1 - 100 Employee
    • Geotechnical Engineer
      • Dec 2013 - Dec 2014

      • Managed and advice contractors regarding technical matters on the piling works for the 1 National Institute of Health (Setia Alam) due to the excessive settlement of piles which deviated from proposed design • Diagnosed reasons why the piling at Kajang MRT line had not achieved intended design capacity and by using various test and analysis to establish whether the piles were safe or additional measures were required • Justify the causes of embankment cracks which happened along the construction of Alor Pongsu Interchange (Perak) settlement phase and provide appropriate counteractive measures which are economically sound • Facilitate design works for the widening of ELITE E6 (Selangor) whereby the intended new lane of road would adhere to the stringent allowable settlement limits imposed • Monitored and track the progress of the subcontractors in charge of the soil investigation and utility detection works at site – part of the preliminary works required for the Ampar Tenang Interchange project (Selangor) Show less

Education

  • UNSW
    Civil engineering, Civil Engineering
    2009 - 2013

Community

You need to have a working account to view this content. Click here to join now