    • Australia
    • Mining
    • 1 - 100 Employee
    • Mine Forman
      • Nov 2020 - Present

      Small underground Gold Mine. Reabilitate old workings using hand held equipment. Excavate drill chamber and explore extents of orebody with diamond drill. Small underground Gold Mine. Reabilitate old workings using hand held equipment. Excavate drill chamber and explore extents of orebody with diamond drill.

    • Mining Consultant
      • Aug 2020 - Present

      Small gold mine start up. Establish portal and sample old workings. Set up and install water reticultaion system for exploration drill rig 4.5km from water source and 360m up on a mountain side. Supervise drilling and associated exploration and mining activies.Reestablish collapsed portal and fall of ground of historical workings. Rehabilitate and establish access to historical shaft. Set up dewatering system to dewater 100m shaft. Sample ore body to establish mineable zone. Mine a diamond drill chamber using hand held equipment to drill for resource.

    • Mining Consultant
      • Nov 2016 - Present

      Tasked with a dewatering target to get the ex-mine flowrate to 450 l/s of 80 degree Celsius (176 degree Fahrenheit) water. Design and manage construction of underground dewatering project to safely de-water below production levels to extend mine life. This includes consolidating and improving current capital pump station infrastructure to maximize ex-mine water and to add contingency to avoid flood events. Design of deep bore installations and reticulation pathways through return air ways to better manage heat transfer and workforce exposure to hot water. Simplify and automate system to better manage power outages and pump failures. Redesign lower decline to manage hot water flows and mining fronts with active dewatering cuddies and satelite pumping systems.

    • Mining Consultant
      • Dec 2019 - Sep 2020

      Consult on dewatering and water management, including safety requirements for 140 degree celcius water in a narrow vien hydrothermal gold mine.

    • Mining Consultant
      • Apr 2020 - Jul 2020

      Consult on water and silt management system. Troubleshoot paste filling system and recommend actions for increased productivity.

    • Mining Consultant
      • Feb 2020 - Mar 2020

      Consult on pit water management in large open cut Gold mine

    • Mining Consultant
      • Jan 2020 - Feb 2020

      Consult on water management in high inflow high grade gold mine.

    • Mining Consultant
      • Apr 2016 - Mar 2019

      Consulting on water management, pressure grouting and pump design for expected high water inflow underground mine.Designing and underground water management and drainage plan to operationally control high water inflows.Design capital pump station and storage system for 450 l/s peak inflows.Design and supply tapered plugs to be used by the jumbo in and emergency when historic diamond drill holes are intersected. Train Jumbo operators on installation of Mineright Packers in high pressure high water volume diamond drill hole intersections in development faces.Train personnel on grouting through packers with high pressure grout pump to fill hole and de-risk development.

    • Mining Consultant
      • Jun 2012 - Apr 2016

      Consulting on lateral and shaft development through water bearing structures with high water pressures, temperatures and volumes using a combination of cement grout, resin injection and upgraded pumping system designs. Mineright developed an internationally patented Jumbo installed packer, the Mineright Packer, to allow for high pressure grout injection in areas where temperatures and pressures were to high to install manually.

    • Mining Consultant
      • Jun 2014 - Jun 2015

      Consulting and leading a mining crew through consolidated aggregate filled stopes, (CAF), of unknown quality, by primarily pressure grouting the CAF using Mineright spiles to access a rich hangingwall orebody lens. Successfully mined and ground supported with shotcrete arches over 120 metres on 4 level.

    • Mining Consultant
      • Sep 2014 - Oct 2014

      Consulting on water management and conducting a pressure grouting review for the high water inflow Silangan mine in the southern Philippines.

    • Mining Consultant
      • Oct 2018 - Aug 2019

      Assist in the recovery of a flooded decline, formulate and design the Syama Underground Water management plan for early stages of a large sub level cave mine, with open pit catch sumps and underground storage facilities with precipitation averaging 1100mm per year.Design the underground water management plan LOM Assist in the recovery of a flooded decline, formulate and design the Syama Underground Water management plan for early stages of a large sub level cave mine, with open pit catch sumps and underground storage facilities with precipitation averaging 1100mm per year.Design the underground water management plan LOM

    • Underground SuperIntendent
      • 2008 - 2012

       Responsible for the underground contractor. Initially a single heading decline. Aiming for a target of 1400m per month of development on multiple headings. Assist with Planning and scheduling of four jumbos mining decline and level development, underground fan chambers and pump station chambers. Working with the infrastructure team to construct two x 2MegaWatt fan installations underground. Working with Electrical department to ensure reticulation is adequate and on time. Design, build and managed pump system to combat unrecognized water source that proved invaluable to operation. Put systems in place to deal with high water inflows from aquifers, open pit and exploration diamond drill holes. Procure high pressure Atlas Copco grout pumps. Organize training, procedures, risk assess and manage crews for this task. Procure and instigate Poly -urethane injection to stop water inflows. Organize training of crews, risk assess and manage. Procure Jumbo for curtain grouting. Design and build water stoping device. Design curtain grouting drill pattern and method to stop water inflows. Liaise with large Open Cut working above the Underground mine to ensure interactions were safe and productive. Managed all Raiseboring activities with three separate Raiseboring contractors.  Managed all ancillary construction requirements for a new mine. Ventilation bulkheads and Doors, Pump stations, elevated loading facilities for trucks, stop blocks for ore passes, raise bore pads, permanent poly duct installation for ventilation of levels, underground emulsion storage bays, crib room, refueling bay, rising main installation in rises, Managed and planned ventilation fan requirements for each level as mining progressed Have a good working relationship with all departments

    • Owner/ Operator
      • 2003 - 2007

      Mined a box cut, established portal, mined decline, ore drives and stoped out narrow vein using timber props as support. Mined a box cut, established portal, mined decline, ore drives and stoped out narrow vein using timber props as support.

    • Ground support Contracts and Tribute Gold Mining
      • 2000 - 2002

      Ground support contracts.  Re-instate Collapsed Adit entrance to underground seismic station in Charters Towers Hill Mine Bypass around Collapsed Portal at Hadleigh Castle mine Mine bypass around Collapsed Decline at Hadleigh Castle MineTribute Mining Margaret mine. Established portal and decline access under open pit using hand held equipment. Ground support contracts.  Re-instate Collapsed Adit entrance to underground seismic station in Charters Towers Hill Mine Bypass around Collapsed Portal at Hadleigh Castle mine Mine bypass around Collapsed Decline at Hadleigh Castle MineTribute Mining Margaret mine. Established portal and decline access under open pit using hand held equipment.

    • Underground Manager
      • 1998 - 2000

       Underground Manager.  Contract Miner. Narrow vein gold mining with airleg and jumbo. Room and pillar stopes, Flat-back, shanty back, cut and fill.  Underground Manager.  Contract Miner. Narrow vein gold mining with airleg and jumbo. Room and pillar stopes, Flat-back, shanty back, cut and fill.

    • Project Manager
      • 1995 - 1997

       Jumbo operator. Development and Production Shift boss  Assistant Project Manager  Project Manager of Development and Production Contract.  Managed the Avoca Method for production mining of narrow vein gold successfully.  Jumbo operator. Development and Production Shift boss  Assistant Project Manager  Project Manager of Development and Production Contract.  Managed the Avoca Method for production mining of narrow vein gold successfully.

    • Jumbo Operator/ Shift Boss/ Production Engineer
      • 1990 - 1994

       Nipper  Cubex ITH Rig drilling slot rises and rings (140mm to 250mm) 40m to 120m drill depth.  Development crew, starting on the Loaders (ST6,ST8, Elphinstone 1500,1700)  jumbo Operator (Atlas Copco H127) Stope Charge crew: slot rises, slots and stopes. Development blasting and production blasting of underground stopes including crown pillar blast of 240 t of slurry/anfo. (Was designated shotfirer for this mass blast.) Drill and Blast Engineer: Designing Stopes, Drill patterns, Slot rises and rings.