Joe Cocking
Project Lead - Darwin LNG Process Team - Santos at Eftech International- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Eftech International
-
Australia
-
Oil and Gas
-
1 - 100 Employee
-
Project Lead - Darwin LNG Process Team - Santos
-
Mar 2022 - Present
-
-
-
Baker Hughes
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Joint Integrity Field Supervisor
-
Mar 2021 - Mar 2022
ACE Project ACE Project
-
-
-
BAE Systems
-
United Kingdom
-
Defense and Space Manufacturing
-
700 & Above Employee
-
Hydraulic Supervisor
-
Feb 2021 - Mar 2021
HMS Queen Elizabeth HMS Hurworth HMS Prince of Wales HMS Duncan - Hydraulic overhaul, system repair and testing - Lube oil flushing HMS Queen Elizabeth HMS Hurworth HMS Prince of Wales HMS Duncan - Hydraulic overhaul, system repair and testing - Lube oil flushing
-
-
-
Royal IHC
-
Netherlands
-
Shipbuilding
-
700 & Above Employee
-
Hydraulic Commissioning Technician
-
Nov 2020 - Jan 2021
-
-
-
Bilfinger UK
-
United Kingdom
-
Engineering Services
-
700 & Above Employee
-
Mechanical Lead
-
Oct 2020 - Nov 2020
-
-
-
Halliburton
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Flange Manager
-
Sep 2020 - Oct 2020
Culzean - Total. Purging and leak testing operations on the export compressor. Ailsa FSO - TotalFlange Manager and all aspects of N2.
-
-
Decommissioning Field Operator
-
Jun 2020 - Sep 2020
Kinsale Alpha - Decommissioning. Lead role in topside purging and glycol draining from the platforms regeneration package. Displacement purge through systems boiler / reboiler, two stage separators and absorber vessels.Worked closely with Kinsale Lead Process Operator and received a strong recommendation for my knowledge and safe working practices during the project.
-
-
-
Aibel
-
Norway
-
Oil and Gas
-
700 & Above Employee
-
Pre-Commissioning Field Supervisor
-
Nov 2019 - Mar 2020
Troll C - Pre Commissioning M40 module. Heidrun - Pre Commissioning M42 module. Troll C - Pre Commissioning M40 module. Heidrun - Pre Commissioning M42 module.
-
-
-
Halliburton
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Operations Shift Supervisor
-
May 2019 - Nov 2019
Judy Platform | Shift Coordinator Leman Alpha | SupervisorSeafox 4 | Leman Alpha Hookup
-
-
PPS MSO | FM
-
Feb 2018 - Nov 2019
MV-21 - KNK - Lancelot. - Stand alone N2 operations alongside bolting and chemical cleaning scopes. Takoradi Halliburton base. PPS Division. - Function testing (HT-400, DHDA, 180k N2 Unit, Hydra Rig, centrifugal pumps and torque + tensioning pumps) servicing and load outs for all shutdown and PPS work scopes in the Ghana, Africa region.- Flange Management / Integrus FM software
-
-
PPS MSO | FM
-
Jun 2018 - May 2019
Having successful proven myself as a multi skilled technician both in the Halliburton PPS yard and on various pipeline and process scopes I have now been given the opportunity to develop my skills as a supervisor for all PPS requirements. I will predominantly be working on various start up and pre commissioning roles both onshore and offshore as well as assisting all mobilisations and equipment back loads from the base here in Takoradi, Ghana. Multiple shutdown scopes and maintenance jobs will also be carried out. Experience with Integrus Flange Management software. Show less
-
-
-
Baker Hughes
-
United States
-
Oil and Gas
-
700 & Above Employee
-
PPS Technician
-
Oct 2017 - Dec 2017
Inpex Ichthys Project - Lay Vessel 108 – INPEX Operations - Ichthys Gas Field Development, Offshore WA – Umbilicals, Risers and Flowlines. CSV 1 Well Jumper Flushing and Leak Testing. BHI fluid spread setup consisting of Pacemaker PDP - DHDA Chemical and dye injection.
-
-
Membrane Operator / MSO
-
Aug 2017 - Oct 2017
The first ever scheduled pitstop on the A Class Nature reserve LNG plant. Train 1 Pitstop purge cycles on dehydration and defrost systems. Running of two spreads consisting of compressors, after coolers and NPU's. Maintenance and running of all equipment on a daily basis.HES & QA/QC System walk downs prior to start up. WTL - Daily requirements to ensure safe working practice while adhering to WMS and JHA.
-
-
-
IKM Testing UK
-
United Kingdom
-
Oil and Gas
-
100 - 200 Employee
-
Nitrogen Operator / Multi Skilled
-
Jul 2017 - Aug 2017
All aspects of nitrogen leak testing prior to start up on the Beryl Alpha platform. N2 pumping + assisting bolting scopes if required. All aspects of nitrogen leak testing prior to start up on the Beryl Alpha platform. N2 pumping + assisting bolting scopes if required.
-
-
-
Baker Hughes
-
United States
-
Oil and Gas
-
700 & Above Employee
-
PPS Operator
-
Feb 2017 - Jun 2017
Terneuzen DOW Chemicals Holland - Phase 1 - LHC-2. Decommissioning nitrogen purge cycling using LN2 Steam Vaporiser + BP85Phase 2 - N2 Leak Testing, calibration of MS 200/300. Total Leuna Refinery Germany - N2 supply on demand using steam vaporiser. Rig up for liquid nitrogen reactor cool downs.
-
-
Bolting Operator / N2 Leak Test Operator
-
Oct 2016 - Jan 2017
Currently working on Pre Commissioning leak tests while carrying out all remedial bolting work and reinstatement.
-
-
-
EnerMech
-
United Kingdom
-
Oil and Gas
-
700 & Above Employee
-
Multi Discipline Technician
-
Nov 2016 - Dec 2016
The scheduled shut down of the Total platform - North Alwyn. Employed as a multi skilled technician assisting all bolting and nitrogen leak testing work scopes.
-
-
Bolting Supervisor / Chemical Cleaning Op
-
Jun 2016 - Oct 2016
TGT Freon Replacement Project 2016 - Chemical cleaning of 20+ critical path systems.Currently Flange Manager working on the reinstatement of clean build sub systems on behalf of Amec Foster Wheeler.
-
-
-
Baker Hughes
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Bolting Supervisor
-
May 2016 - Jun 2016
Assisted and completed bolting, N2 leak testing / hydrotesting requirements for both maintenance and projects work scopes throughout the 2016 Leman Alpha Turnaround. Was required to provide concise and accurate daily ops and shift hand overs to ensure all Baker Hughes Bolting and Leak testing work was up to date. The role included the following aspects: • Conducted toolbox talks and ensured all HSE and correct procedure were understood for the work ahead• Prepared equipment packages for each specific project • Ensured all relevant permits were issued for the work ahead • Used various torquing techniques; hand torque, hydraulic torque and tensioning procedure. Ensured the correct procedure was implemented as well as safe working practice - clear communication• Understanding of Isometric & PID drawings - line walks to ensure joints have been completed and the LBR was up to date• Assisted in all N2 leak testing operations as well as flange weld tests and hydrostatic testing throughout the turnaround Show less
-
-
Bolting Technician
-
Mar 2016 - Apr 2016
I have just completed a contract for Baker Hughes in Great Yarmouth. I was ensuring the reinstatement on the Bacton Rejuvenation Project where new pipe work and propane compressors have been put in place. There were a reported 600 joints with a backlog of over 1000 required to be completed to bring the project up to schedule. This job required very strict safety procedures to meet Jacobs requirements while on site as well as good time management to ensure the site started up leak free, on time.
-
-
-
Propipe
-
Harlepool
-
Pigging / Manufacturing Technician
-
Jan 2016 - Mar 2016
Pig Testing - Assisting testing division. Running bespoke pig designs through multi-bore pipe systems and pipeline features such as, wye piece, simulated pipeline connectors, unbarred tee-pieces and other unique subsea features. Test pipe and pumping spread assembly: - Assisted Propipe testing division with assembly of various test rigs and pumping equipment spreads. This would include pressure test prior to clients attended pigging trials. Pig refurbishment – Strip down and rebuild of production pigs and test pigs after trials. Replacing seal discs, guide discs, magnets and fixings. Clean and rebuild. Show less
-
-
-
PIPELINE INNOVATIONS LTD
-
United Kingdom
-
Oil and Gas
-
1 - 100 Employee
-
Pigging Technician
-
Nov 2015 - Dec 2015
During my time at Pipeline Innovations I was introduced to the entire process of caliper pig manufacturing and testing. From the research and development stage through to the fabrication and building of bespoke caliper pigs, designed to fit the individual clients specifications. I assisted in the hydrostatic pressure testing up to 400bar for sub-sea pressure vessels as well as the calibration of caliper pigs prior to running in live mains. Alongside this I worked on various pathfinder foam pig designs, a new technology inaugurated and now established in the process of pipeline integrity solutions. Show less
-
-
-
Halliburton
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Bolting Supervisor / Core Crew
-
Aug 2015 - Oct 2015
Daily duties consisted of ensuring all work was carried out to the clients specifications. Both JHA and permits were in place before commencing work with a clear outline of all risks and prevention procedure. Working directly with the core crew servicing and maintaining various pipeline joints. The role included the following aspects: • Conducted toolbox talks and ensured all HSE and correct procedure were understood for the work ahead • Prepared equipment packages for each specific project • Ensured all JHA and WRP were present before starting work • Used various torquing techniques; hand torque, hydraulic torque and tensioning procedure. Ensuring the correct load in or break out was used for each particular job • Understanding of Isometric & PID drawings Show less
-
-
-
Halliburton
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Bolting Technician
-
Jul 2012 - Sep 2012
I was involved in the biggest shut down in Chevron history. Halliburton had over 200 personnel onsite. My duties included assembling & tightening of bolted flanges, participation in safety meetings, lessons learned. Ensuring that the activities that I was involved in finished on time according the schedule we were given. I ensured that all flanges were tagged & that the details were given to the flange coordinator. I conducted pre job safety meeting with crew members. Halliburton torqued over 4000 flanges & the plant started up leak free. Show less
-
-
Education
-
Northumbria University