Jobin Mathew

Project Engineer at Global Remote Integrated Access Solutions
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Manama, Capital Governorate, Bahrain, BH

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Autodesk AutoCAD Certified
    Udemy
  • Primavera P6 Enterprise Project Portfolio Management Essentials
    Udemy

Experience

    • India
    • Oil and Gas
    • 100 - 200 Employee
    • Project Engineer
      • Jul 2021 - Present

       Site supervising & reporting to the client regarding the progress of the project.  Prepared RAMS, JSA and other related documents.  Made trips to various offshore locations on a per project basis.  Strong understanding of offshore safety procedures and protocols.  Excellent Knowledge in offshore installation / maintenance work.  Prepared daily progress reports of each offshore project.  Brown Field and Green Field Permit Receiver.  Planning and Site co-ordination from the management and with the underwater divers.  Understanding project specifications and developing time schedules and budgets that meet them.  Work allocation according to the priority of work to be done.  Daily Reports and other Diving documents submitted to the client.  Quality related inspection (Ultrasonic Testing & Cathodic protection) & documentation for the project.  Supervision on fabrication and installation of Clamps and Bracings.  Prepared Nesting plan as per project requirement.  Preparing permit for both Greenfield & Brownfield from the client.  Coordinated work of subcontractors with fabrication and painting to complete work in the unit on schedule.  Preparing daily work plan and explaining divers according to the drawing.  Ensured safe working practices and procedures are always maintained through the work crew. Show less

    • Piping Supervisor
      • Apr 2019 - Jul 2021

       Prepared daily reports of work progress and workforce utilization.  Verified and properly identified that the valves are installed in accordance with flow direction.  Assured that pipe supports, hangers and guides have been installed in accordance with the piping drawings and the pipe support details.  Ensured that all construction activities are performed in compliance with the requirements of the relevant specifications, drawings, codes and standards.  Good knowledge in piping engineering codes and standard.  Good knowledge in equipment layout, piping layout, isometric checking, support design, hanger selection and other related activities of piping.  Familiar with the work sequence and ensured that the work is performed accordingly, utilizing planned resources in an efficient manner.  Prepared weekly reports of the total spool erection, isometric weight installed, welded dia inches of supports and joints, and the remaining work front with the materials available.  Implemented the Cost and Quality on site, and ensured minimum wastage and re-works.  Assisted in the planning and scheduling of the work. Show less

    • India
    • Construction
    • 1 - 100 Employee
    • Site Engineer
      • May 2018 - Mar 2019

       Executed piping erection works, which are to be compliant with the time schedule and within the respective budget and satisfactory quality.  Supervised installation of deluge system piping works and underground firefighting piping works.  Inspected the pipes and piping materials as per the specification.  Conducted physical and dimensional inspection on installed pipes, valves, and support for good quality works.  Supervised calculating and dimensioning hydraulic pumps for pulp and waste transportation.  Ensured safe working practices and procedures are always maintained through the work crew.  Prepared daily reports of work progress and workforce utilization. Show less

    • Site Supervisor
      • May 2016 - Apr 2018

       Inspected the construction sites regularly to identify and eliminate potential safety hazards.  Resolved work problems and recommended measures to improve productivity and product quality.  Ordering materials and supplies.  Ensuring all equipment are in working order and good condition.  Ensuring project completion as per the set timeline.  Inspected the construction sites regularly to identify and eliminate potential safety hazards.  Resolved work problems and recommended measures to improve productivity and product quality.  Ordering materials and supplies.  Ensuring all equipment are in working order and good condition.  Ensuring project completion as per the set timeline.

Education

  • University of Kerala
    Bachelor of Engineering - BE, Mechanical Engineering
    2012 - 2016
  • NEBOSH

Community

You need to have a working account to view this content. Click here to join now