Jimmy Rojas
MPD Sr. Supervisor at Opla Energy- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
Opla Energy
-
Canada
-
Oil and Gas
-
1 - 100 Employee
-
MPD Sr. Supervisor
-
Jun 2023 - Present
Houston, Texas, United States • Operation supervising of the pressure management device. • Control and operation with the PMDSmart system to manage the downhole pressure profile • Operation and maintenance of electric MPD choke system.
-
-
-
Schlumberger
-
United States
-
Oil and Gas
-
700 & Above Employee
-
DPM Deep-Water Supervisor
-
Sep 2020 - Dec 2022
Broussard, Louisiana, United States • Responsible in the drillship for supervising and executing operations related to MPD. • Elaboration and application of operation and contingency procedures. • Control and operation of the DW MPD riser gas handling system and below-tension-ring rotating control device. • Supervising the operation and maintenance of the Buffer manifold and junk catcher during the drilling operations. • Operations and maintenance of the MPD choke manifold with its hydraulic system and flow meter.
-
-
-
-
DPM Engineer Lead & Op. Supervisor
-
Aug 2012 - Apr 2020
Houston, Texas, United States • Manage, design, develop, coordinate, and perform onsite operations construction Engineering activities for large-scale projects by creating procedures level and optimizing operations in the field in the US, Canada, Mexico, Argentina, Colombia, Venezuela, Saudi Arabia, Malaysia, and Thailand. • Perform and interact as drilling project engineer over the process of MPD automatic and MPD semi-automated projects, ensuring planning operation completion of large-scale projects on time and within… Show more • Manage, design, develop, coordinate, and perform onsite operations construction Engineering activities for large-scale projects by creating procedures level and optimizing operations in the field in the US, Canada, Mexico, Argentina, Colombia, Venezuela, Saudi Arabia, Malaysia, and Thailand. • Perform and interact as drilling project engineer over the process of MPD automatic and MPD semi-automated projects, ensuring planning operation completion of large-scale projects on time and within scope and budget while performing root cause analysis. • Secured new business and sales opportunities for MPD/UBD operations and cost estimates accountability while developing technical proposals for MPD/UBD tenders in US land, Malaysia, Thailand, Venezuela, and Argentina. • Created drilling operating procedures using transient/steady-state hydraulic simulations for drilling operations, well control/influx management, Managed Pressure Drilling matrix, and well completion procedures.
-
-
MPD Field Engineer
-
May 2008 - Aug 2012
Villahermosa, Tabasco, Mexico Responsible for the managed pressure drilling engineering appliance on rig location.
-
-
-
Halliburton
-
United States
-
Oil and Gas
-
700 & Above Employee
-
Underbalanced Applications Operations Supervisor
-
May 2005 - Apr 2008
Villahermosa, Tabasco, Mexico Execution of the well MPD operations using nitrified water based mud and water-based foam system. Operation supervising of rotating control devices, hydraulic choke manifold, four phase separator, mist pump, sparge pump system, injection manifold, feed air compressors, boosters reciprocate compressors and gas treatment with closed loop system.
-
-
-
GreyStar Corporation
-
Oil and Gas
-
1 - 100 Employee
-
Oil & Gas Production Supervisor
-
Jan 2001 - Mar 2005
Maturin, Monagas State, Venezuela • Supervising and operating of a computerized central control room of the oil and gas production facility and automated wellheads in the Deep Jusepin field in north Monagas for TOTAL with well DJ-1, DJ-2, DJ-5, DJ-8, DJ-10, DJ-12, Cotoperi-1X y Cotoperi-2X. • Pre-commissioning and commissioning of EPS ME-25 and ME-20 for oil and gas processing in the Dacion field in Santo tome, south Anzoátegui, for ENI. • Operation of Centrilift electrical submersible pumps, state-of-the-art… Show more • Supervising and operating of a computerized central control room of the oil and gas production facility and automated wellheads in the Deep Jusepin field in north Monagas for TOTAL with well DJ-1, DJ-2, DJ-5, DJ-8, DJ-10, DJ-12, Cotoperi-1X y Cotoperi-2X. • Pre-commissioning and commissioning of EPS ME-25 and ME-20 for oil and gas processing in the Dacion field in Santo tome, south Anzoátegui, for ENI. • Operation of Centrilift electrical submersible pumps, state-of-the-art multiple-stage centrifugal pumps. • Operation of the gas injection compressor packages for 5000 psi high-pressure system on the Uracoa field. • Gas lift wells operation and evaluation to optimize the well's production. • Participated in mechanical well completion operations, prepared operations procedures, analyzed and re-completed the wells with updated well bore schematic by performing rig operations events, providing strategic and safe directions for the job application. • Perform production operations and direct supervision over field personnel contractors, reporting to the production superintendent. • Monitor daily process and production reports, review and maintain detailed digital and paper records for oil and gas wells, analyzing data to provide risk assessments strategic, and operations guidance to field personnel. • Operation of choke manifold of 15000 psi, 1440 psi testing separators, two stages in series during the extended well test of the high pressure well SBC-29, SBC-35, PIC-16, MUC-57, TP-1X, TP-2X, TP-4X, TP-5X y SL-1X. • Operation of the MPD choke, four-phase separator, and rotary blowout preventer RBOP 5000 during the CPD operations with biphasic fluid in the wells Iride 1156 and Jujo 503 in south Mexico. • Operation with high pressure and rates 3000 psi production separator, gas contact tower for steam removing and glycol regeneration unit for gas dehydration at Rusio Viejo plant for TOTAL with an oil production of 34000 BBPD and gas production of 85 MMSCFD. Show less
-
-