Jim Fonte, PE, PMP

PM at LSI - Logical Systems LLC
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Golden, Colorado, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Automation Machinery Manufacturing
    • 100 - 200 Employee
    • PM
      • May 2016 - Present

      • Project Manager for an automation upgrade for a logistics client to replace 38 PLC 5’s with ControlLogix while continuing all sortation operations. Able to accomplish this project 8 months early, on budget and without any lost sortation time. • Project Manager for a project to automate wort transfer from the Brew house to Fermenting replacing 5 major manual valve manifolds with automated leak proof valve manifolds minimizing downtime for change overs while maintaining production capacity requirements • Project Manager of controls integration for a project to upgrade Malting production and load out operations improving efficiency and quality. • Project Manager for a project to provide automation integration for replacement of brew kettles and associate support systems improving operation efficiency, quality and eliminating obsolescence. Show less

    • United States
    • Business Consulting and Services
    • 700 & Above Employee
    • Sr. Project Manager
      • Sep 2003 - May 2016

      Provided engineering design and project management for food and beverage manufacturing and processing systems, high speed packaging systems and integration, utilities and facilities installations, warehousing automation, chemical plants, upstream oil and gas, mining and minerals, water and waste water treatment systems. Responsible for feasibility studies, preliminary engineering design, project schedules, cost estimates/control, detailed engineering design, equipment specifications and procurement, sub-contractor management, construction, start up, commissioning, and project closeout. Provided enterprise thinking and coordination expertise for the evaluation, design, and construction of new and existing facilities aligned with business case development input to support capital appropriations. Show less

    • United States
    • Food and Beverage Services
    • 700 & Above Employee
    • PM
      • Dec 1976 - Jun 2003

      • Project Manager for integration of a high speed aseptic can filling, packaging, and conveying line. Including feasibility study, cost estimating, scheduling and coordination of installation with the operating departments, construction, startup, commissioning, and project closure. • Project Manager for replacement of two cooking vessels in a Brew house operation that had a combination of structural support failure and vessel fatigue failure. Installation was required without interruption of the operations in the Brew house. This project required coordination of several operating departments including utilities, facilities, and the Brew house operations. • Project Manager for a Malting Facility expansion to upgrade the malting process increasing capacity and quality including truck and rail load out capability. Show less

Education

  • Colorado State University
    Bachelor of Science (Engineering), Engineering

Community

You need to have a working account to view this content. Click here to join now