Jim Evenson
QHSE Manager at Gemini Machine Works Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Will W.
Jim is an extremely well thought out individual. He has always provided me with valuable insight and tools to ensure I was a successful member of his team. Knowledgeable, professional, inclusive, empathetic and honest are some of the words I would use to describe Jim. He is a natural team leader, who I would be happy to work with again.
Will W.
Jim is an extremely well thought out individual. He has always provided me with valuable insight and tools to ensure I was a successful member of his team. Knowledgeable, professional, inclusive, empathetic and honest are some of the words I would use to describe Jim. He is a natural team leader, who I would be happy to work with again.
Will W.
Jim is an extremely well thought out individual. He has always provided me with valuable insight and tools to ensure I was a successful member of his team. Knowledgeable, professional, inclusive, empathetic and honest are some of the words I would use to describe Jim. He is a natural team leader, who I would be happy to work with again.
Will W.
Jim is an extremely well thought out individual. He has always provided me with valuable insight and tools to ensure I was a successful member of his team. Knowledgeable, professional, inclusive, empathetic and honest are some of the words I would use to describe Jim. He is a natural team leader, who I would be happy to work with again.
Credentials
-
Six Sigma Foundations
LinkedInJan, 2022- Nov, 2024 -
Project Leadership Certificate
NAIT Continuing Education -
Project Management Certificate
NAIT Continuing Education -
Tap Root
Root Cause Analysis Training
Experience
-
Gemini Machine Works Inc.
-
Canada
-
Machinery Manufacturing
-
1 - 100 Employee
-
QHSE Manager
-
Apr 2022 - Present
-
-
-
Alco Inc.
-
Canada
-
Oil and Gas
-
1 - 100 Employee
-
Engineering Manager
-
Sep 2017 - Apr 2021
- Development of project proposals and management of special projects:o Project Manager for ALCO scope at Champion Petfoods NorthStar Facility:* Project scoping, estimating, planning, scheduling (MS Project), execution, WBS, and cost coding.* On-site construction management and subcontractor selection. Recruiting of construction trades.* Progress reporting and change management.* Designed details for onsite and offsite fabrication.* HSE oversight to promote safety culture.o Project Manager for Tiger Calcium Slave Lake Plant, Small Stackbox including engineering, procurement, fabrication, and stainless passivation.- Provided input for update of Quality Management System.- APEGA Responsible Member.- Developed and maintained the Professional Practice Management Plan (PPMP) for compliance with APEGA and the Engineering and Geosciences Professions Act.
-
-
-
Ensign Energy Services
-
Canada
-
Oil and Gas
-
700 & Above Employee
-
General Manager - Maintenance & Capital Projects
-
Dec 2014 - Aug 2015
- Directed and mentored the shop management team at the Ensign 8th Street Maintenance Facility.- Developed and implemented business processes for improved effectiveness and efficiency of shop management team and tradespeople.
-
-
Engineering Manager / Engineering Team Leader
-
Feb 2007 - Dec 2014
- Mentored, coached, and managed multi-discipline engineering and operations support team including personnel assignments and professional development:o Collaboration with all stakeholders for in-house and third-party engineering and field support.o Non-conformances and corrective/preventive actions.o Professional development and appraisals of team members.o Cost estimates for rig upgrade/modification projects and fabrication support.- Project Engineering for fleet-wide operational upgrades:o 7500psi high-pressure mud pumping piping systems per ASME B31.3.o Development of upgraded AC drawworks emergency braking control system.o Upgrading of camp electrical distribution systems to meet CEC.
-
-
Senior Engineer - Projects
-
2006 - 2007
- Project Manager for five concurrent/consecutive drilling rig construction projects including management of equipment suppliers, fabrication shops, and contracted service providers for design, procurement, construction, and commissioning.
-
-
-
Tri Ocean Engineering LTD
-
Oil and Gas
-
1 - 100 Employee
-
Project Manager
-
Feb 1997 - May 2006
- Kerr-McGee Oil and Gas Corporation – North Slope Nikaitchuq Developmento Project Engineer for multi-discipline preliminary design of processing facilities sized for 30,000 bpd including processing for crude oil, produced water, injection water, and injection gas.- Shell Canada Limited – Niglintgak Production Barge Study (Mackenzie Gas Project, NWT)o Proposal development for Mackenzie Delta bathymetry mapping program for Niglintgak location access.- Imperial Oil Limited – Taglu Production Barge Design Study (Mackenzie Gas Project, NWT)o Project Manager for multi-discipline conceptual design of gas production topsides (200mmscf/d) on 6500-tonne ‘super-barge’, including preliminary barge structural design, gas processing simulations and process equipment specifications, barge and site layouts, cost estimates, and logistics study for transport up Mackenzie Delta to Taglu location. - TotalFinaElf – Vankor Ice Drilling Pad Studyo Project Engineer for the development of a year-round insulated ice drilling pad concept for Vankor field, Western Siberia.- Sakhalin Energy – Sakhalin II PA-A Pressure Maintenance Projecto Project Manager for the addition of 650-tonne waterflood module (2 x 5MW turbine-driven waterflood pumps), 350-tonne power generation module (1 x 5MW turbine-driven generator), cuttings injection package, and related production/drilling modifications for Vityaz (formerly Molikpaq) PA-A platform operating offshore Sakhalin Island.- Sakhalin Energy – Piltun-Astokhskoye Platform B (PA-B) Conceptual Drilling Facilities Designo Design studies and preliminary equipment selection for Sakhalin Energy PA-B offshore drilling platform.- Sakhalin Energy – Sakhalin Molikpaq Conversion (Piltun-Astokhskoye Platform PA-A)o Package engineering for Molikpaq drilling systems equipment; site support at Daewoo shipyard (Korea).
-
-
-
Colt Engineering
-
Oil and Gas
-
1 - 100 Employee
-
Senior Mechanical Engineer
-
Oct 1987 - Feb 1997
- Various secondment assignments to provide Mechanical Engineering support at client facilities:o Westcoast Energy Inc.: Package Engineer for pipeline flare system equipment, field construction support.o Imperial Oil Colt/Esso Projects Alliance: Gas lift tie-in projects, field construction support.o Nova Corporation of Alberta: Compressor station modifications and upgrades.o Alberta Gas Ethylene Corp, Novacor Joffre Polyethylene Plant: Coordination of minor maintenance and upgrade projects.
-
-
-
Tri Ocean Engineering LTD
-
Oil and Gas
-
1 - 100 Employee
-
Mechanical Engineer
-
Oct 1978 - Apr 1986
- Bangladesh 20,000ft mechanical land rig: Preliminary design for Petro Bangla and Sumitomo Heavy Industries (Japan).- Bow Valley Offshore Drilling (Halifax): Operations support, semi-submersible facility upgrades.- Panarctic Oils Arctic Pilot Project: Melville Island module transportation study.- Panarctic Oils Over-Ice High Arctic Drilling Program: Subsea operations engineer (Canadian High Arctic).- Detailed design of drilling mud and mechanical support systems (compressed air, steam, seawater desalination, plant water, heating and ventilation, waste heat recovery) for Beaufort Sea offshore caisson island drilling rigs (Dome Petroleum 25,000ft CBIR #1 and Esso 20,000ft Tarsuit CRI Rig 7).- Shipyard fabrication support for Mobil Norway Statfjord B drilling modules (Kristiansund, Norway).- Shell Expro Brent Charlie platform: Offshore fabrication supervision (North Sea).
-
-
Education
-
University of Alberta
Bachelor of Science, Mechanical Engineering -
University of Calgary
Natural Gas Processing -
University of Calgary
Pipeline Design and Construction