Jianliang Zhao

Construction Manager at 上海电气
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Qingdao City, Shandong, China, CN
Languages
  • Chinese Native or bilingual proficiency
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Mechanical Or Industrial Engineering
    • 700 & Above Employee
    • Construction Manager
      • Oct 2019 - Present

    • United Arab Emirates
    • Construction
    • 500 - 600 Employee
    • Mechanical Manager
      • Nov 2016 - Oct 2019

      Mainly Responsible for the Research of CSP Plant Technology in Technical Center of SEPCOIII Headquarter1. Reviewe tender and bidding technical documents of CSP projects, provide technical support for the CSP projects (Luneng Haixi 50MW Tower CSP Plant, Urate Zhongqi 100MW Trough CSP Plant and Redstone 50MW Tower CSP Plant), reviewe major technical scheme(MOS), and deal with major technical issues;2. Organize and participate in the research of CSP technology;3. Coordinate and manage the daily work of the CSP technology research team of the company, and organize the relevant technology training;4. Experience in the draft of the national standard "Technical Standard for Linear Fresnel Solar Thermal Power Station", "Project Specification for Solar Power Station", and the industry standard "Technical Specification for Construction of Flue Gas Purification Device for Thermal Power Plant", etc., and review several industrial standards submitted for review;5. Experience in the compilation and review of the company's standard "Inspection Procedures for Trough and Tower CSP Plant – Mechanical Part";6. Organize to compile and review the summary of construction technology for CSP projects;7. Lead the technical management of seven EPC projects, Red stone Tower CSP plant, Luneng Haixi Tower CSP plant, GODDA coal-fired project of India, etc., supervise the preparation and implementation of technical schemes;8. Organize and participate in technical communication with external research institutes, design institutes, equipment manufacturers, industry associations, and coordinate with external cooperative agencies.

    • Mechanical / Construction Manager
      • May 2015 - Nov 2016

      Morocco, NoorII 200MW Trough CSP Plant & NoorIII 150MW Tower CSP Plant1. Took in charge of mechanical department, responsible for safety, quality, progress, cost, technical management and contract management.2. Experience in the project and department preliminary planning and preparation work; Preparation of subcontract biding documents, participate in the negotation progress, evaluate and select the subcontractor; Subcontractor management and contract settlement;3. Organize to review the drawings to find design problems in advance; Review and verify the technical schemes (MOS) and participate in project inspection & test; Track the execution of EPC plans, prompt the design institute to provide the construction drawings timely, urge the progress of equipment and materials procurement, manage the progress of site construction.4. Organize to solve the key technical problems, such as the construction of MS tank, HTF tank, equipment and pipeline construction of MS system in the Tower, and the installation of receiver, to ensure the smooth progress of the project;5. Coordinate the relationship among the internal and external main stakeholders, such as owner, supervisor, partner, subcontractor, headquarter, and develop the relationship inside the department;6. Pay attention to the study of CSP new technology, organize regular training to improve the technology level of the technical personnel;7. Pay attention to the cultivation of employees' comprehensive quality, improve the employees' consciousness of safety, quality, progress, cost and technical management.

    • Design Management Engineer
      • Feb 2013 - May 2015

      Saudi Arabia, 3041MW Ras Az Zawr Gas-steam Combined Cycle Power Plant Participate in the whole process of design documents review, technical evaluation of the bidding documents, contract negotiation, project implementation and design documents filing.1. Coordinate work carried out by subcontractors, engineering institute and tech advisors in a daily basis to achieve project completion and commissioning on time.2. Responsible for the design management tasks of mechanical department, mainly responsible for the following systems: HP/IP/LP steam system, Gas station, Steel structure of the whole plant, Chemical dosing system, Sampling system, etc.;3. Cooperate with other departments in design input, interface management, drawing review;4. Reviewe the L3 schedule submitted by the design institute, make reasonable work plans based on the project progress, and prompte the design institute to submit drawings in time; Technical interface among client (engineering), Construction teams and subcontractors.5. Design coordination and problem handling among the design institutes and the manufacturers, review and feedback the drawings submitted by all parties, timely submit to the owners and supervisors for review, ensure the construction drawings to be released to site timely; Major design institutes and subcontractors, such as Siemens from Germany, Seonghwa from South Korea, Sargent&Lundy from USA, etc.6. Coordinate and solve technical problems of internal department and various design issues raised by the site construction teams;7. Responsible for the management of relevant drawings, letters and design documents, and the collecting and establishment of project completion data;8. Manage the process management well, participate in the collection and negotiation of claims data to various parties.

    • Mechanical Engineer
      • Feb 2009 - Feb 2013

      Nigeria, 750MW Papalanto Gas-steam Combined Cycle Power Plant1. Pre-Construction Phase: Familiar with the design and construction documents. Manage the evaluation of potential construction subcontractors. Prepare the general subcontractors, site/construction sequence, logistics plan, site lay down and access plan for the project.2. Subcontractor Bid Phase: Response to questions for the RFP. Manage the final evaluation and recommendation process of the bids and proposals.3. Construction Phase: Manage the daily, weekly and monthly meetings and reports with owner, subcontractor, project team and headquarter. Manage the evaluation and settlement of all change orders. Manage all required construction management processe including but not limited to: RFI, Shop drawing, Directive, Submittal, Punch List, Short Form Agreement and other documents as required. Evaluate the payment and conduct all related walk-down and inspection. Manage all third-party construction development and report result. Monitor Change or Delay to construction schedule. Develop a Three (3) week look ahead and monthly schedule update and develop recovery plan if schedule variances evolve.4. Commissioning Phase : Mange the defect treatment occured during the commissioning and maintenance progress. Manage the resource coordination, spare part transfer. Train the operational staff to use the completed facilities, implement efficient and timely document control.5. Closeout Phase: Manage overall punch list and close out process. Review all final submittals from the subcontractors including but not limited to Shop Drawing, Submittal, as-built, etc. Includes but not limited to daily walks through the construction to monitor progress and development to ensure that the work being accomplished is in accordance with the contract document. Questions and clarifications evolve from these reviews and need to be documented and resolved. Completion data filing, TOP data preparation and transfer, etc.

    • Boiler technician
      • Jul 2008 - Feb 2009

      4*350MW Putian Gas-steam Combined Cycle Power Plant1. Basic Power Plant knowledge training, practice the equipment and pipe installation, commissioning and repair, training practical ability;2. Proficient in reading the drawings and technical documents like technical specification, P&ID, flow chart, layout, assembly drawing, O&M manual, etc. (both in hard copy and in digital);3. Good understanding of mechanical construction work like hot work (cutting, burning, welding, etc.), grinding, drilling, pickling, crane or hoist lifting, structure erection, etc.; Practice to install the equipment and pipe by myself.4. Good understanding of different materials;5. Good understanding of different tools (crane, hoist, fork-lift truck, pump car, drill, level, etc.);6. Experience in Process, Maintenance, Installation, Commissioning and Operation of the equipment or system above-mentioned.

Education

  • Qingdao Agricultural University
    Bachelor of Engineering - BE, Major of Engineering Management
    2016 - 2018
  • Shenyang Institute of Engineering
    Major of Thermal Energy and Power Device of Power Plant
    2005 - 2008

Community

You need to have a working account to view this content. Click here to join now