Jethro Mawhinney
Workshop Manager at MG ENGINEERING- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
MG ENGINEERING
-
Australia
-
Shipbuilding
-
1 - 100 Employee
-
Workshop Manager
-
Feb 2020 - Present
-
-
Project Supervisor
-
May 2019 - Feb 2020
-
-
-
-
Welding and fabrication supervisor
-
Jan 2019 - May 2019
-
-
-
Carlo Fishing Charters
-
Maritime
-
1 - 100 Employee
-
Project Manager/ fabrication and welding supervisor
-
Nov 2016 - Nov 2018
32m steel charter boat build 32m steel charter boat build
-
-
-
-
Project Manager
-
Jan 2015 - Nov 2016
In-water ship repair, organise trades for all repairs such as electrical,hydraulic ,steel,pipe and rectify detained vessels by AMSA, writing repair scopes, schedules, estimates and quotes, organising riding crews when required to meet vessels needs. Dealing with vessels owners and agents to suit shipping timetables.writing SWMS and JSA, writing permits for hot work and confined space. In-water ship repair, organise trades for all repairs such as electrical,hydraulic ,steel,pipe and rectify detained vessels by AMSA, writing repair scopes, schedules, estimates and quotes, organising riding crews when required to meet vessels needs. Dealing with vessels owners and agents to suit shipping timetables.writing SWMS and JSA, writing permits for hot work and confined space.
-
-
-
-
Production Supervisor
-
Nov 2014 - Jan 2015
Garden island dry dock , P&O cruise ship tank and deck repairs to Lloyds class with a team of 10, writing SWMS , work scopes and repair methods to complete repairsNewCastle (Carrington )new build welding on the Tongan landing craft to keep to schedule , to class. Garden island dry dock , P&O cruise ship tank and deck repairs to Lloyds class with a team of 10, writing SWMS , work scopes and repair methods to complete repairsNewCastle (Carrington )new build welding on the Tongan landing craft to keep to schedule , to class.
-
-
-
ALUMINIUM BOATS AUSTRALIA PTY LTD
-
Shipbuilding
-
1 - 100 Employee
-
Production Supervisor
-
Aug 2014 - Nov 2014
Navy patrol boat refit, oversee 20 fabricators and 10 welders replace hull plate to DNV class, completing welding QA, tool box talks, writing work scopes, repair methods ,scheduling and coordinating NDT Navy patrol boat refit, oversee 20 fabricators and 10 welders replace hull plate to DNV class, completing welding QA, tool box talks, writing work scopes, repair methods ,scheduling and coordinating NDT
-
-
-
-
Production Supervisor
-
Apr 2008 - Aug 2014
Ship repair, Over see lower level supervisors, estimating , writing repair scopes and schedules,project planing to meet time frames, material ordering and costing, running other trades such as fitters, painters and ship wrights. Working on cruise,cargo,gas and oil vessels as well as tug boats and barges.All to class requirements. Conduct PQR,WPS, and WQR to suit repairs as required. Writing hot work permits and confined space permits when required. Ship repair, Over see lower level supervisors, estimating , writing repair scopes and schedules,project planing to meet time frames, material ordering and costing, running other trades such as fitters, painters and ship wrights. Working on cruise,cargo,gas and oil vessels as well as tug boats and barges.All to class requirements. Conduct PQR,WPS, and WQR to suit repairs as required. Writing hot work permits and confined space permits when required.
-
-
-
Woody Marine Fabrication
-
Maritime Transportation
-
Boilermaker /boat builder
-
Apr 2007 - Apr 2008
Alloy boat building, Fabrication, weld out , fit out of 12m niad commercial and private vessels Alloy boat building, Fabrication, weld out , fit out of 12m niad commercial and private vessels
-
-
-
-
Boilermaker
-
May 2002 - Dec 2006
Structural steelFabrication of beams columns to engineered drawings. QC of completed work before sending to sight. Structural steelFabrication of beams columns to engineered drawings. QC of completed work before sending to sight.
-
-
-
Ridetech
-
United States
-
Automotive
-
1 - 100 Employee
-
Boilermaker
-
Jun 2000 - May 2002
Fabrication and fit out of windmills for Star Fish Hill, fabricate, SAW , then fit our Fabrication and fit out of windmills for Star Fish Hill, fabricate, SAW , then fit our
-
-
Education
-
Australian Welding Institute
AS1796-2001 Certificate 10 -
Australian Welding Institute
AS2214-2019 Welding Supervisors Structural Steel Welding -
PATDC
Engineering cert 3 -
Cardijn collage