Jesus Silva

Service Engineer at TIW Corporation
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Saudi Arabia, SA
Languages
  • English Native or bilingual proficiency
  • Spanish Native or bilingual proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Oil and Gas
    • 100 - 200 Employee
    • Service Engineer
      • Aug 2012 - Present

      − Running and Install hydraulic and mechanical Liner Hanger from 4 ½” up to 16” in horizontal and vertical wells.− Running and install Expendable Liner Hangers from 4 ½” up to 9 5/8”.− Installation of ECP (External Casing Packers) from 4 ½” up to 7”.− Installation of LTP (Liner Top Packer) from 4 ½” up to 16”.− Instsallation of Tie-Back seal assembly in 6’ PBR up to 30’ PBR with pressure over 8,000 psi.− Running Polish mills for 4 ½”, 5”, 7”, 9 5/8” receptacles.− Well Completion up to surface cemented and non cemented.− Running Scab Liners with or without seals.− Performing cementing job with liner rotation.− Mono bore completion.

    • Spain
    • Oil and Gas
    • 200 - 300 Employee
    • E&I Supervisor
      • May 2010 - Aug 2012

      − Develop solution to close all performance items pending as pre commissioning engineer.− Review scope of work, technical specification to ensure compatibility and maintainability of the plant and equipments.− Working cleaning items pending as pre commissioning engineer (E&I, Controls) closing all items in order to finish and final handover to client.− Prepare engineer requirements for the modifications on the plant and specific reasons for modifications/changes with cost benefit analysis − Working in 63 Fin Fan Coolers repairs, planning and leading a team for its execution optimizing resources to comply within time scheduled in Juaymah Gas Plant. − Working in the loop test for the 189 vibration sensors installed in each Fan and in the pneumatic blades pitch control in Juaymah Gas Plant.

    • Venezuela
    • Oil and Gas
    • 700 & Above Employee
    • QA/QC Instrument Supervisor
      • Jul 2009 - May 2010

      − Checking the quality control of the drawings in instrumentation specialty.− Inspect installation for Fire and Gas panel− Verify the modification in documentation and drawing in site. Reception, distribution and verification to the QA/QC documentation, control of activities on site through the I.T.P (Inspections and Test Plan).− Preparation of QA/QC procedures, method statements and ITP’s.− Review of vendors documentation follow up the standards.− Work Inspection on site by visual inspection reports.

    • Commissioning and Pre-Commissioning Engineer
      • Dec 2007 - Dec 2008

      − Developed and Modified related to instrument wiring diagram, loop diagram, segment diagram, P&ID’s, instrument location layout, data sheet, I/O lists, junction box schedule, instruments hook up.− Sizing calculation for control valves and pressure safety valves.− Modification on Foundation Fieldbus segments − On charge of the control loop execution (open loop, close loop and control loop) and troubleshooting for the instruments; supervise vibration sensor installation in fin-fan area, pumps and compressor area; supervise the H2S and LEL detectors installation.

    • Venezuela
    • Oil and Gas
    • 1 - 100 Employee
    • Instrument Engineer
      • Jul 2003 - Dec 2007

      − Performance the basic and detail engineer which provide documents such instruments, systems and equipments specification, data sheets, location instruments layout, signals lists, instrument lists, I/O lists, wiring layout, P&ID’s, cable specification, purchase orders, typical installation details, hook up’s, loop diagrams, Foundation Fieldbus segment calculation.− Review of Fire and Gas systems.− Review of vendor’s drawings and data specification sheets, equipments specifications.− Prepare scope of work, technical specifications to ensure compatibility and maintainability of new plants and equipments.− Review and comment on conceptual, basic and detailed design package.− Prepare engineering requirements for new plant and equipment with cost benefit analysis.

Education

  • Universidad Nueva Esparta
    Engineer, Electronic Engineer
    1999 - 2005

Community

You need to have a working account to view this content. Click here to join now