Topline Score

Bio

Generated by
Topline AI

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.

0

/5.0
/ Based on 0 ratings
  • (0)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

No reviews to display There are currently no reviews available.
You need to have a working account to view this content. Click here to join now

Experience

    • United States
    • Automation Machinery Manufacturing
    • 1 - 100 Employee
    • Consultant II
      • Nov 2019 - Present
    • United Kingdom
    • Information Technology and Services
    • Controls Engineer
      • Oct 2016 - Nov 2019
    • Canada
    • Automation Machinery Manufacturing
    • 100 - 200 Employee
    • Software Designer
      • Aug 2014 - Oct 2016
    • Controls Engineer - DyAG Engineering
      • Dec 2012 - Aug 2014

      • Training with experience control engineer in Siemens and Allen-Bradley PLCs • Training with experience control engineer in WinCC and FactoryTalk HMI • Training on FACS and Siemens PLC by assisting with commissioning of GM Toledo Carrier Sub-Assembly • Basic training with vision engineer on Cognex Camera software and set-up • Assisted installation of new conveyor system in Michelin Plant Lexington, SC o Over 2 week period worked with Allen-Bradley PLCs • Assisted post-installation support of Glass Installation System in GM Flint for Sprintec o During 1 week period worked with Siemens PLC and Allen-Bradley HMIs o Provided debugging assistance for problems that arose during production • Production Support for Engine Block Line in GM Powertrain Plant Ramos Arizpe, Mexico o Over 3 week period worked with Siemens PLCs and HMIs o Supported the Camou and Marposs CNC machines o Provided solutions for common faults that hindered line production o Provided run-off and debug of problems experienced by ball joint microfinishing machine • Designed & debugged controls logic for microfinishing project using Siemens Step 7 & WinCC applications o Design included creating HMI interface built to Chrysler standards, interacting with 3 siemens servo motors, as well as several maxon motors

    • Netherlands
    • Machinery Manufacturing
    • Test Technician
      • Aug 2012 - Nov 2012

      • Took power consumption data from tablets and smart phones to determine trend among common voltage and current to standardized power supply design • Standardized test spreadsheets o Using Microsoft excel and VBA to automate creation of graphs and inputting data into a master sheet • Took power consumption data from tablets and smart phones to determine trend among common voltage and current to standardized power supply design • Standardized test spreadsheets o Using Microsoft excel and VBA to automate creation of graphs and inputting data into a master sheet

    • Tool Development Internship
      • May 2012 - Aug 2012

      • Updated application used by database created from a Microsoft Access o importing method using VBA went from taking a 9 hour process to a 45 minute process • Worked briefly updating ladder logic in Westinghouse’s control builder • Using Visual Studio created new object class to save and load a Treeview representation of connections o Involved importing data from database and organizing into tree format o Used .NET & SQL commands to speed up process • Updated application used by database created from a Microsoft Access o importing method using VBA went from taking a 9 hour process to a 45 minute process • Worked briefly updating ladder logic in Westinghouse’s control builder • Using Visual Studio created new object class to save and load a Treeview representation of connections o Involved importing data from database and organizing into tree format o Used .NET & SQL commands to speed up process

    • Electronics Testing and Verification Intern
      • May 2011 - Aug 2011

      • Soldering and crimping of wire, reading schematics, designing and building testing rig • Learning the workings of the testing process, worked with MySql and Apache to upload trial version of Testcase manager software o Created site that was accessible on a local network given the ip address, username, and password • Built and verified wiring harnesses, assisted with test case executions • Soldering and crimping of wire, reading schematics, designing and building testing rig • Learning the workings of the testing process, worked with MySql and Apache to upload trial version of Testcase manager software o Created site that was accessible on a local network given the ip address, username, and password • Built and verified wiring harnesses, assisted with test case executions

Education

  • University of North Carolina at
    Bachelors of Science, Electrical Engineering
    2008 - 2012
  • University of North Carolina at Charlotte
    Bachelor of Science, Computer Engineering
    2008 - 2012

Community

You need to have a working account to view this content. Click here to join now