Jerome Ruhland
UST INSTALLATION/ RETROFITTING at Pacific Environmental Services Company- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
0
/5.0 / Based on 0 ratingsFilter reviews by:
Experience
-
Pacific Environmental Services Company
-
Construction
-
1 - 100 Employee
-
UST INSTALLATION/ RETROFITTING
-
Mar 2017 - Present
-
-
-
-
Co-Owner
-
Jan 2016 - Present
We are Icelandic sheep for fiber, breeding stock and meat. We are Icelandic sheep for fiber, breeding stock and meat.
-
-
-
SAM LLC
-
United States
-
Facilities Services
-
Survey Instrument Person
-
Oct 2013 - Jul 2016
Staking R.O.W., center line staking, main line tally, weld mapping, tie ins, main line lowering in, pot holing and road bores. In charge of crew when party chief took time off. As built. Prelim. Setting Control Points. Trimble Total Station, Trimble R-10, R-8, Nikon stations. Depth of Cover survey. Alta surveys. Staking R.O.W., center line staking, main line tally, weld mapping, tie ins, main line lowering in, pot holing and road bores. In charge of crew when party chief took time off. As built. Prelim. Setting Control Points. Trimble Total Station, Trimble R-10, R-8, Nikon stations. Depth of Cover survey. Alta surveys.
-
-
-
S K W
-
Brazil
-
Retail
-
Pipeline Survey Tech (CAD)
-
May 2013 - Sep 2013
Survey crew member. Staking of R.O.W. , center line for main line valves, main line tally, above ground tally. Survey crew member. Staking of R.O.W. , center line for main line valves, main line tally, above ground tally.
-
-
-
Brosz Engineering
-
United States
-
Civil Engineering
-
1 - 100 Employee
-
Engineer Tech / Drafter
-
May 2012 - Oct 2012
-
-
-
Bell & Sons
-
United Kingdom
-
Apparel & Fashion
-
Framer
-
Jan 2005 - Aug 2006
Framing and finish trim. Framing and finish trim.
-
-
-
-
Laborer/ equipment operator
-
Mar 2003 - Jul 2004
Installed septic systems, mowed forest service roads. Cleared sites and dug foundations for houses. Installed septic systems, mowed forest service roads. Cleared sites and dug foundations for houses.
-
-
-
SWI Construction
-
United States
-
Insurance
-
Pipe layer/ top man
-
Jun 2001 - Nov 2002
Set pipe laser, site level for manholes and catch basins, Run some equipment. Set pipe laser, site level for manholes and catch basins, Run some equipment.
-
-
-
IBS
-
Cameroon
-
IT Services and IT Consulting
-
Equipment Installer
-
Apr 1999 - Jun 2001
Responsibilities included the installation industrial 48-volt batteries and other equipment essential for telecommunication systems. Responsibilities included the installation industrial 48-volt batteries and other equipment essential for telecommunication systems.
-
-
-
-
Head Drafter and Permit Handler
-
Feb 1992 - Dec 1998
Responsible for designing garages, barns, office complexes and other buildings in addition to obtaining building permits. Responsible for designing garages, barns, office complexes and other buildings in addition to obtaining building permits.
-
-
-
Universal Land Development
-
United States
-
Real Estate
-
Laborer
-
Sep 1991 - Nov 1992
Performed grading for curb, sidewalks and roads as well as setting pipe for drainage Performed grading for curb, sidewalks and roads as well as setting pipe for drainage
-
-
Education
-
Southeast Technical Institute
AAS, Land Surveying Science Technology -
Southeast Technical Institute
AAS, Civil Engineering Technology -
North Dakota College of Science
No degree., Residential and Commercial Design and Estimating -
Max Public High School
High School Diploma, Mathematics