Jerico Trinos
Sales Engineer at Tarana Wireless, Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
Professional Regulation Commission
Electronics Engineer
Experience
-
Tarana Wireless, Inc.
-
United States
-
Telecommunications
-
200 - 300 Employee
-
Sales Engineer
-
Jan 2023 - Present
-
-
-
Nera Telecommunications Ltd
-
Singapore
-
Telecommunications
-
200 - 300 Employee
-
Pre-Sales Engineer
-
Oct 2017 - Mar 2023
+ Lead and manage the overall bidding process and preparation, analyze customer requirements for proposal and guide the client accordingly+ Product presentation to the regional client+ Review and monitor the progress of the bid addressing all related issues+ Perform effective engagement with bid stakeholders, customers to gather information relevant for bid submission, formulate strategies, the value proposition to the companies advantage while meeting client requirement+ Scope technical solution required to address customer requirements assesses customer met and unmet needs then recommend an optimum solution, ensures appropriate support for the proposed architecture+ Provide user-training / equipment training to customers+ Project management+ Microwave link design / BoM creation for tender submission+ Microwave link testing / Proof of concept/troubleshooting+ Tender clarification, bid finalization, and submission+ Factory acceptance testing / Site acceptance testing Show less
-
-
Pre Post Sales Engineer
-
Oct 2017 - Mar 2023
-
-
-
ZTE Philippines Inc.
-
NCR Philippines
-
MW Planning and Engineering
-
Jan 2016 - Mar 2023
ZTE Philippines Inc. – Bell Tel. Project / Microwave Planning and Engineering Planning Transmission Network – Network planning and design using Path Loss 5.1, discussing network modifications/changes and other documents with Bell Tel. Planning group. RFI Scanning – Training subcontractors to conduct RFI testing on site. Frequency Assignment/Interference analysis – Analysis of RFI reports from subcon and changing of frequency assignment depending on the RFI result. Planning Monitoring – Monitoring of all MW planning related issues like No-LOS, re-routing, redesign, TSSR analyzation, prior to submission to client MW Backbone design – Link budget and analysis of backbone project for SMC project including in-depth analysis of feasibility/Interference and adjustments based on the requirement of the client. Radio Station License – Application/Documentation of radio station license to NTC prior to powering up of MW equipment. LOS – On-site checking/confirmation on the links reported by subcons with No-LOS and proposal of new MW link-up. Monitoring and Management – Keeping an updated file of all MW hops design/TSSR within the region. Assigned point person of all the concerns, planning, schedules and solution under area of responsibility. Duration: January 11, 2016 – Present Show less
-
-
-
Huawei Tech. Phils. Inc.
-
Makati Philippines
-
Microwave Engineer
-
Jan 2013 - Dec 2015
Huawei Tech. Philippines Inc. – Globe Telecom Nemesis Fixed Network/Project Engineer Planning Transmission Network – Discussing every planning consideration, design objectives, design parameters, network diagram and final microwave design. RFI Testing – conducted RFI scanning, testing, data gathering to determine what specific allocation of frequency band and sub-band for a given hop/scenario. Frequency Assignment – after RFI scanning, proper allocation of frequency band/sub band based on the RFI results matching the different microwave transmission solutions. TSSR Validation – Checking and Review of Technical Site Survey Report prior to submission to client. Monitoring and Management – Keeping an updated file of all installation happening within the region. Assigned point person of all the concerns, planning, schedules and solution under area of responsibility. Microwave Equip. Commissioner - Installation commissioning and troubleshooting of Huawei RTN620, RTN910, RTN950, RTN950a, NEC DMR IPS 5000, Alcatel Lucent, Aviat Networks Eclipse, NEC Pasolink Neo. Audit Migration Dismantling - Monitoring and review of site audit, migration dismantling of MW hops, 2G, 3G and Wimax traffic and also site acceptance. Material Request Creator – Microwave equipment consolidation for shipment to site based on the specific design. Site Support Engineer - Conducting installation supervision, commissioning, troubleshooting, site inventory, quality of installation, Commissioning, Integration of new technology, Basic Functionality Testing, IP Migration. Testing and Acceptance - Link testing, troubleshooting and acceptance, checking the quality of installation conducted by the subcon prior to PAT. IP Provisioning – Making interconnection between IP Radios based on IP Planning and Microwave DCN for the TDM traffic to be migrated as IP traffic for 2G, 3G, Wimax,LTE. 2G and 3G, Wimax, LTE - Activation and migration of different traffics via IP Radios. Show less
-
-
-
wi-tribe
-
Qatar
-
Telecommunications
-
100 - 200 Employee
-
Project Engineer
-
May 2010 - Jan 2013
Aviat Networks - Wi-Tribe (Liberty Telecoms) – Aviat Networks 4G Wi-max Project Phase 1 Pre-sales duties: Microwave Link Design - Microwave link design using Pathloss 4.0 for Wi-Tribe Telecommunication for 500 links installed. Proof of Concept Testing - 1+1 MHSB, 2+0, 2+2 and 4+0, 4+4 and 8+0 microwave link set up being presented and explain to the client via Laboratory testing conducted in the office or Live link Testing. BOQ – Responsible on Bill of Quantity of equipment ordered by client being collated and submitted for ordering. Project implementation duties: RFI Testing – conducted RFI scanning, Testing, data gathering to determine what specific allocation of frequency band and sub-band for a given hop/scenario. Site Support Engineer - Conducting installation supervision, commissioning, troubleshooting, site inventory, quality of installation done by the subcontractors. Microwave Link troubleshooting - Being sent to different parts of the country for link troubleshooting and analysation of problematic link specially if it is urgently needed. Monitoring and Management - Keeping on track on the number of integrated links then reports to the higher management of Wi-Tribe Telecoms and Aviat Networks. Technical Site Survey Report validation - Affirmation on the side of Aviat Networks if the Survey Report submitted is precise and factual and ready for installation as it would be submitted to our client. Duration: May 24, 2010 – January 4, 2013 Show less
-
-
-
-
Project Engineer
-
Nov 2007 - Jan 2013
Pre-sales duties: Microwave Link Design - Smart Super PDH Project Phase 7, Phase 8, Phase 9, Phase 10, Phase 10b, IP Packet links for over 2000 hops installed of Smart Communications using Pathloss 4. Proof of Concept Testing - 1+1 MHSB, 2+0, 2+2 and 4+0, 4+4 and 8+0 microwave link set up being presented and explain to the client via Laboratory testing conducted in the office or Live link Testing. Project Implementation duties: Planning Transmission Network – Discussing every planning consideration, design objectives, design parameters, network diagram and final microwave design. RFI Testing – conducted RFI scanning, testing, data gathering to determine what specific allocation of frequency band and sub-band for a given hop/scenario. Frequency Assignment – after RFI scanning, proper allocation of frequency band/sub band based on the RFI results matching the different microwave transmission solutions. TSSR Validation – Checking and Review of Technical Site Survey Report prior to submission to client. Site Support Engineer - Conducting installation supervision, commissioning, troubleshooting, site inventory, quality of installation done by the subcontractors. Microwave Link troubleshooting – Being sent to different parts of the country for link troubleshooting and analysation of problematic link specially if it is urgently needed. 1+1 to 8+0 Microwave Set Up – Design, Installation On-Air Capacity Upgrade – Conducting live link capacity upgrade TDM, and IP Based Radio VoIP Phone Configuration – Setting up/configuration of Linksys VOIP phones, order wires over the microwave link, one, two or three hops apart. Technical Site Survey Report, LOS Table Study - Affirmation on the side of Aviat Networks if the Survey Report submitted is precise. As-Built Report Validation - After installation documents checking, if the KPI of each link Testing and Acceptance - Link testing and acceptance.. Show less
-
-
Education
-
Colegio de San Juan de Letran - Calamba
Electronics Engineering, Telecommunication