Jeff Castor

SolutionsEngineer at GE Critical Power
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Shelby, Ohio, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Electric Power Generation
    • 1 - 100 Employee
    • SolutionsEngineer
      • Dec 2008 - Present

      Preform Site Surveys to determine what DC Power Equipment is needed in different phone company’s Central Offices, with the majority of my work revolving around AT&T. Using AT&T’s new online bidding system, VIPS, I bid the project with Minor Material, Engineering, and Installation costs and provided the customer with a detailed explanation of the quote. Once the project was awarded, I created all of the necessary AT&T paperwork including but not limited to Detailed Job Specs., cable running… Show more Preform Site Surveys to determine what DC Power Equipment is needed in different phone company’s Central Offices, with the majority of my work revolving around AT&T. Using AT&T’s new online bidding system, VIPS, I bid the project with Minor Material, Engineering, and Installation costs and provided the customer with a detailed explanation of the quote. Once the project was awarded, I created all of the necessary AT&T paperwork including but not limited to Detailed Job Specs., cable running lists, and marked drawings. Upon completion of the project, I provided all of the required Job Completion documents and Equipment Templates to the AT&T Power Engineer. In the Quote TC Support role I assisted others in quoting and reconciling projects. Working off of a SOW, I created opportunities in the Salesforce application, prepared the bids in the BigMachines application, and sent the quotes off to the customer. Once awarded, I reconciled the jobs using the SAP application. Show less

    • Power Engineer
      • Sep 2004 - Dec 2008

      Preformed Site Surveys to determine what was needed at a particular Central Office. Using AT&T’s online bidding system, PESOS, I bid the project with Minor Material, Engineering, and Installation costs. Once the project was awarded, I created all of the necessary AT&T paperwork including but not limited to Detailed Job Specs., cable running lists, marked drawings, and Detailed MOP’s. I interacted with AT&T personnel to obtain all the necessary approvals for the paperwork. Upon completion… Show more Preformed Site Surveys to determine what was needed at a particular Central Office. Using AT&T’s online bidding system, PESOS, I bid the project with Minor Material, Engineering, and Installation costs. Once the project was awarded, I created all of the necessary AT&T paperwork including but not limited to Detailed Job Specs., cable running lists, marked drawings, and Detailed MOP’s. I interacted with AT&T personnel to obtain all the necessary approvals for the paperwork. Upon completion of the project, I provided all of the required Job Completion documents and Equipment Templates to the AT&T Power Engineer. As a project manager, I managed multiple crews at one time and ensured that they were brought in on time and under budget. I maintained this position until the company went out of business.

    • Lead Installer
      • Jun 1999 - Sep 2004

      Advanced DC power installation, test, turn-up, programming and troubleshooting of DC power plants, installation of DC-AC inverter plants, and transitioning of live DC power circuits. Responsible for multiple entry level installers while leading a project. Filled out all AT&T yellow wallet documentation and preformed volatile maintenance window work following a Detailed Method of procedure.

Education

  • Shelby Senior High School
    1994 - 1997

Community

You need to have a working account to view this content. Click here to join now