Jeff Billings

Piping Designer at DORIS
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Oil and Gas
    • 100 - 200 Employee
    • Piping Designer
      • May 2019 - Present

    • United States
    • IT Services and IT Consulting
    • 700 & Above Employee
    • Senior Piping Designer
      • Jan 2015 - Feb 2017

      Marshalltown Generating Station Combined Cycle Project– Marshalltown Generation Station is a new combined-cycle generating station, including two gas-fired combustion turbine/generators “CT/G” two heat recovery steam generators “HRSG” and one steam turbine/generator “ST/G” to produce nominal 600 megawatt. The generation station is located in Marshalltown, Iowa.“Office” Duties: Lead Piper for the “CT/G”-“HRSG”, Auxiliary Boiler and Compressor Area.“Field” Duties: Monitored and tracked Sub Contractor daily progress reports.Writing Field Change Request for field piping design modifications.Writing Purchase Requisitions for procurement of additional and/or replacement of damaged materials.Resolving and responding to Sub Contractor RFI’s “Field Requests for Information”Writing NCR’s “Nonconformance Reports” while providing disposition for corrective action along with final field inspection to bring NCR to closure.Piping System walk downs for pre Hydro test inspection and post Hydro test piping reinstatement.Witnessing/signing off Underground Piping Holiday tests and Hydro tests.Updating 3D PDMS Model to reflect field “Red-line mark ups to As-built conditions”Conducted routine inspections and quality audits to verify construction activities were in accordance with project specifications and applicable codes. Show less

    • Senior Piping Designer
      • Mar 2013 - Dec 2014

      Agrium US Inc. Lone Star Project – Upgraded the existing Ammonia Plant to 1,900 STPD Ammonia Production. Supplied the required Carbon Dioxide for the New 1,800 MTPD Urea plant addition. Duties included checking isometrics and interfacing with the Stress Department.

    • Senior Piping Designer
      • Dec 2013 - Mar 2014

      Chevron South N’ Dola – N’Dola Field Development Cabinda, Angola28 mbopd Oil, 50 mmscf/d Gas375 bwpd “Project Canceled”

    • Australia
    • Professional Services
    • 700 & Above Employee
    • Senior Piping Designer
      • May 2009 - Dec 2013

      ExxonMobil Hebron - Jeanne d'Arc Basin Field Development 150,000 mbopd Oil, 175 mmscf/d Gas Gravity Base ExxonMobil Sakhalin I Arkutun – ENL Dagi Field Development 250,000 mbopd Oil, 140 mmscf/d Gas Floatover Topsides ExxonMobil Hebron - Jeanne d'Arc Basin Field Development 150,000 mbopd Oil, 175 mmscf/d Gas Gravity Base ExxonMobil Sakhalin I Arkutun – ENL Dagi Field Development 250,000 mbopd Oil, 140 mmscf/d Gas Floatover Topsides

  • Mustang Engineering Inc.
    • Houston, Texas Area
    • Senior Piping Designer
      • Jun 2002 - May 2009

      BP Valhall Re-development Project - Oil production capacity: 120 mbopd Gas handling capacity: 143 mmscf/d Total liquid capacity: 200 mbpd(oil and prod.water) Pipe Design of Cellar Deck Responsible for ISO tracking and issuing. BP Atlantis Project - 150,000 BPD Oil, 180 MMSCFD Gas Semi-submersible. Lead Pipe Designer of compression module. Responsible for ISO tracking and issuing. Show less

  • Pinnacle Engineering, Inc.
    • Houston, Texas Area
    • Senior Piping Designer
      • Aug 1999 - Jun 2002

      Significant projects include: Walter Oil and Gas, Inc – Facilities design of a 15 mm Gas 4-pile platform, 10 mm Gas 3-pile platform, 20 mm Gas 4-pile platform, caisson wellhead protection platform. Blue Water – Facilities design of a 4-pile platform, 5,000 BOPD, 40 mm gas facility. Williams – Facilities design of a 30 mm gas 4-pile platform. Apache – added two new sub-sea wells heads to a 4-pile platform. Westport – added compressor and blowcase to 6-pile platform. Remington Oil and Gas Inc. – Facilities design of a 15 mm Gas 3-pile platform, 10 mm Gas 3-pile platform, 20 mm Gas 4-pile platform. Spinnaker Exploration Company. – Facilities design of a 15 mm Gas 3-pile platform, Show less

    • United States
    • Electric Power Generation
    • 1 - 100 Employee
    • Senior Piping Designer
      • Aug 1998 - Aug 1999

      Hyundai - Facilities design of a 15,000 BOPD, 70 mm gas 8-pile platform. Hyundai - Facilities design of a 15,000 BOPD, 70 mm gas 8-pile platform.

  • Pinnacle Engineering, Inc.
    • Houston, Texas Area
    • Senior Piping Designer
      • Mar 1996 - Aug 1998

      Norcen Explorer, Inc. - Facilities design of 5,000 BOPD, 30 mm gas 4-pile platform for EI 254 “A”. Seagull Energy E & P, Inc. - Facilities design of MOPU, 5,000 BOPD, 40 mm gas facility for Ship Shoal 129. UMC Petroleum Corporation - Facilities design of 50 MM gas facility, 4-pile platform for West Cameron 524 “A”. Seneca Resources Corporation - Facilities design of 5,000 BOPD, 4-pile platform for Vermilion Block 252 “A”. Norcen Explorer, Inc. - Facilities design of 5,000 BOPD, 30 mm gas 4-pile platform for EI 254 “A”. Seagull Energy E & P, Inc. - Facilities design of MOPU, 5,000 BOPD, 40 mm gas facility for Ship Shoal 129. UMC Petroleum Corporation - Facilities design of 50 MM gas facility, 4-pile platform for West Cameron 524 “A”. Seneca Resources Corporation - Facilities design of 5,000 BOPD, 4-pile platform for Vermilion Block 252 “A”.

    • United States
    • Oil and Gas
    • 100 - 200 Employee
    • Senior Piping Designer
      • Mar 1995 - Mar 1996

      Lead Designer for Oil Pipeline from Freeport, TX to Cushing, OK. Lead Designer for Oil Pipeline from Freeport, TX to Cushing, OK.

  • CBS Engineering, Inc.
    • Houston, Texas Area
    • Senior Piping Designer
      • Mar 1993 - Mar 1995

      Lead Designer for Arco China. Responsible for design of 6 pile Offshore Platform in addition to supervision of fabrication and construction overseas. On behalf of Arco China, assisted Bohai Construction Co. to install AutoCad, Pro-Pipe, & Pro-Iso, including overseas instruction. Significant projects include: British Borneo - 30 mm Gas 4-pile platform. Seagull Energy E&P Inc. - Compressor addition to existing 4-pile platform for Brazos Block 552. Mesa - CIG/PEPL compressor additions to existing Williams/Satanta compressor station, Grant Co., Kansas. Shell Western E&P Inc. - Upgrade of existing three phase separation facilities and water injection system in Midland, Texas. Enserch Exploration - Facilities design of new six pile production facility for Garden Banks 388, Gulf of Mexico. Vastar Resources - Addition of gas coolers to existing drilling/production platform at Mustang Island 787, Gulf of Mexico. Show less