Jean-Luc des Rivieres
Interior Buildout Engineer – VTA's BART Silicon Valley Phase II at J.F. Shea Co., Inc.- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
-
Spanish -
Topline Score
Bio
Jackie Nguyen
Jean-Luc is a terrific asset to the MBA class and our team. Not only is he a collaborative leader with a strong work ethic, he readily brings enthusiasm and creative ideas to challenges. He has been a pleasure to work with and I am confident will add immeasurable value to his future pursuits.
Jackie Nguyen
Jean-Luc is a terrific asset to the MBA class and our team. Not only is he a collaborative leader with a strong work ethic, he readily brings enthusiasm and creative ideas to challenges. He has been a pleasure to work with and I am confident will add immeasurable value to his future pursuits.
Jackie Nguyen
Jean-Luc is a terrific asset to the MBA class and our team. Not only is he a collaborative leader with a strong work ethic, he readily brings enthusiasm and creative ideas to challenges. He has been a pleasure to work with and I am confident will add immeasurable value to his future pursuits.
Jackie Nguyen
Jean-Luc is a terrific asset to the MBA class and our team. Not only is he a collaborative leader with a strong work ethic, he readily brings enthusiasm and creative ideas to challenges. He has been a pleasure to work with and I am confident will add immeasurable value to his future pursuits.
Experience
-
J.F. Shea Co., Inc.
-
United States
-
Construction
-
100 - 200 Employee
-
Interior Buildout Engineer – VTA's BART Silicon Valley Phase II
-
Mar 2023 - Present
• Part of a dynamic team performing interior buildout constructability reviews on a unique progressive design-build project in the San Francisco Bay Area.
-
-
Project Engineer – Dig Indy Combined Sewer Overflow
-
Jun 2022 - Mar 2023
• Aided a team that installed over 4,000' of 72" I.D. reinforced concrete pipe and placed over 10,000 cubic yards of 3000 psi concrete backfill.
-
-
Project Engineer – Louisville Ohio River Tunnel
-
Jan 2021 - May 2022
• Helped manage an intradisciplinary team through unprecedented differing site conditions on a $200M combined sewer overflow tunnel project. • Oversaw requirements for the cast-in-place final lining of a 4-mile tunnel utilizing 20ft telescoping concrete forms. • Managed installation of 250' shaft final liner with RCP segments ranging from 10' I.D. to 4' I.D.• Lead field supervision meetings outlining production goals and promoting cross-shift dialogue
-
-
-
Smith School of Business at Queen's University
-
Canada
-
Higher Education
-
400 - 500 Employee
-
MBA Candidate
-
Jan 2020 - Dec 2020
Recipient of Class of 1981 Scholarship for Academic Excellence Charity Gala, Director of Finance Participated in Marquee Group Building Financial Model and DCF courses Recipient of Class of 1981 Scholarship for Academic Excellence Charity Gala, Director of Finance Participated in Marquee Group Building Financial Model and DCF courses
-
-
-
Kiewit
-
United States
-
Construction
-
700 & Above Employee
-
Quality Control Engineer – Dig Indy Combined Sewer Overflow
-
May 2019 - Nov 2019
• Performed cycle analysis on production and oversaw implementation of changes that resulted in 50% increase in production • Worked with multiple crews and shifts along with a team of 3rd party inspectors to ensure all work met the contractual agreements • Oversaw assemble of 18’ diameter tunnel concrete forms along with picking device
-
-
Field Engineer – Fort Calhoun Twin Tunnel Declines
-
Nov 2017 - May 2019
• Lead heading engineer on night shift responsible for quality assurance of simultaneously excavated twin decline tunnels, and transitioned to lead field engineer overseeing installation of steel set final lining • Tracked all costs related to the operation and adjusted dollar forecasts monthly to achieve project completion • Conducted production studies to build accurate project completion schedules • Monitored and documented all aspects of major tunnel rehabilitation which contributed to a change order equal to 100% of original contract value • Co-authored final job report that documented all aspects of the project ranging from comprehensive financial overview to building step-by-step plans of construction for future project estimates • Manage onsite batch plant (material ordering, material forecasting, cost forecasting) Show less
-
-
Field Engineer – Highway Tunnel Rehab
-
Aug 2017 - Oct 2017
• Developed multistage testing process for custom 16’ rock bolts • Tracked daily production to ensure project was adhering to schedule
-
-
-
Colorado School of Mines
-
United States
-
Higher Education
-
700 & Above Employee
-
Climbing Wall Supervisor
-
Aug 2014 - May 2017
• Promoted climbing safety culture through educating people on proper climbing techniques • Encouraged people to explore climbing as a safe and inclusive means of exercise • Performed daily rope and harness inspections • Promoted climbing safety culture through educating people on proper climbing techniques • Encouraged people to explore climbing as a safe and inclusive means of exercise • Performed daily rope and harness inspections
-
-
-
Kiewit
-
United States
-
Construction
-
700 & Above Employee
-
Field Engineering Intern
-
May 2016 - Aug 2016
Intern at the Bingham Tunnel Rehab Project. Kiewit was the primary tunnel contractor working at the Rio Tinto Kennecott Mine. • Quality control field engineering intern • Drafting plans for a 6,000ft HDPE pipe installation and aided in installation logistics • Wrote work and safety plans for miner operations • Day to day business operations • Worked with safety manager to promote a safe job site Intern at the Bingham Tunnel Rehab Project. Kiewit was the primary tunnel contractor working at the Rio Tinto Kennecott Mine. • Quality control field engineering intern • Drafting plans for a 6,000ft HDPE pipe installation and aided in installation logistics • Wrote work and safety plans for miner operations • Day to day business operations • Worked with safety manager to promote a safe job site
-
-
-
-
Community Outreach Coordinator
-
Aug 2014 - Aug 2016
Engineers Without Boarders: Water Project Project focused on helping rural community in Nicaragua build a running water system for village. Led a small team focused on community out reach and relationship building. The work included bi-weekly phone calls with an emphasis placed on familiarizing the team with key members of the community, and receiving updates about conditions in the village. Engineers Without Boarders: Water Project Project focused on helping rural community in Nicaragua build a running water system for village. Led a small team focused on community out reach and relationship building. The work included bi-weekly phone calls with an emphasis placed on familiarizing the team with key members of the community, and receiving updates about conditions in the village.
-
-
Education
-
Colorado School of Mines
Bachelor of Engineering - BE, Mining and Mineral Engineering -
Smith School of Business at Queen's University
Master of Business Administration - MBA, Finance, General