Jayanta Mandal

Chief Project Manager at Simplex Infrastructures Ltd - India
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
IN

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Civil Engineering
    • 700 & Above Employee
    • Sr. Project Manager
      • Jul 2013 - Present

    • Sr. Project Manager(Mech)
      • Jul 2013 - Present

    • Associate General Manager
      • Sep 2011 - Jul 2013

      The Accountabilities: Executing structural fabrication & erection of Steel structure for Main Power Plant & Coal Bunker from U#1 to U#4. Carrying out checks for the alignment and maintaining proper records. Assuring quality and safe work procedure. Planning erection activities for achieving schedule in time. Daily progress review with the contractors and subordinates Key Functional Areas Job Planning, Progress Monitoring & Time Schedule of all mechanical activities carried out. Engineering Verification & Solving Site Problem. Ensure Safe Working Practices. Execution, Supervision & Inspection of Fabrication of Structure, Erection of Structures & Equipment and Alignment checking of Erected Structure & Equipments. Erection of Equipments like Belt Conveyors, Stacker cum Reclaimer, Travelling Tripper etc. Billing & other documentation. Ensure skill and knowledge development of subordinates. Create a culture of quality consciousness among all employees up to workmen level and facilitate team formations for its implementation. Ensure healthy industrial relations and congenial environment. Co-ordination between inter department & Vendor for smooth and best result of work

    • Manager
      • Feb 2011 - Jul 2011

      Mechanical for 4x660Mw Power project Mechanical for 4x660Mw Power project

  • CGPL
    • Mundra
    • Manager
      • Mar 2010 - Jan 2011

    • Manager
      • Mar 2010 - Jan 2011

      A Tata Power Company), as Member-Constn.-Mech.for 5x800Mw Ultra Mega Power project,Mundra, Gujarat. The Accountabilities: Executing structural fabrication & erection of Steel structures, erection of; & Reclaimer, Belt Conveyor for coal Handling Plant. Carrying out checks for the alignment and maintaining proper records. Assuring quality and safe work procedure. Planning erection activities for achieving schedule in time. Daily progress review with the contractors and subordinates

    • Assistant Manager
      • May 2005 - Mar 2010

      The Accountabilities: Executed 22,000 MT of Steel structure Fabrication for TG Building & Mill Bunker for 2X250 MW Thermal Power project (DVC, Mejia, WB) as a fabrication In charge. Executed 8000 MT of Steel structure Fabrication&Erection for ACC, Chandrapur Cement Plant Modernization plant as a Structural In charge. Interaction with designer/ detailer to expedite drawings inflow and for changes required in drawings. Supervision in contractor personnel in order to maintain schedule and conformance to technical specification / drawing. Participation in weekly review meeting with client & customer

    • Assistant Engineer
      • Sep 2003 - May 2005

      X77MW captive power Project. Successfully completed the fabrication &erection of 12000 MT of steel Structures for TG, Bunker & CHP X77MW captive power Project. Successfully completed the fabrication &erection of 12000 MT of steel Structures for TG, Bunker & CHP

    • Jr. Engineer
      • Jul 1997 - Sep 2003

      for their TS-1 Expn. Project of 2X210 MW Thermal Power plant. Successfully completed the fabrication &erection of 9000 MT of steel Structures for TG Building & CW Pump House; Executed the fire water (WFU) pipe line around Road loading area and Sulphur Unit. Executed the Underground Cooling Water pipe line, oily water sewer line, Aromatic drain sewer, storm water sewer, potable water line. Executed the HSD and SKO Pipe line over the pipe sleeper at Road loading area for their TS-1 Expn. Project of 2X210 MW Thermal Power plant. Successfully completed the fabrication &erection of 9000 MT of steel Structures for TG Building & CW Pump House; Executed the fire water (WFU) pipe line around Road loading area and Sulphur Unit. Executed the Underground Cooling Water pipe line, oily water sewer line, Aromatic drain sewer, storm water sewer, potable water line. Executed the HSD and SKO Pipe line over the pipe sleeper at Road loading area

    • shift Engineer
      • Jul 1994 - Jul 1997

      for fabrication of Transmission Tower Structure for fabrication of Transmission Tower Structure

Education

  • Murshidabad Institute of Technology.
    1989 - 1992
  • West Bengal State Council of Technical Education
    DIPLOMA, MECHANICAL ENGINEERING
  • West Bengal Board of Secondary Education
    HIGHER SECONDARY

Community

You need to have a working account to view this content. Click here to join now