Jay Sinha

Senior Professional Engineer at Professional Engineering Services
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Sydney Area, AU

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Senior Professional Engineer
      • Nov 2021 - Present

      Works include rehabilitation and widening of existing highways for Transport for NSW. The projects include: - HW20 Riverina Highway Rehabilitation at Retreat Hall, which is located approximately 9km west of Finley. It involved reconstruction of 2.5km long section - Completed and handed over. - HW14 Sturt Highway Rehabilitation at Rookery, which is nearly 70km from Hay. It involved widening and reconstruction of an one km long section – Completed and handed over. - MR78 The Rock Rehabilitation Project, located nearly 45km North of Culcairn. It involved widening and rehabilitation of Olympic Highway with a pavement consists of 50mm AC14, 2x75mm AC20 and 200mm HB Subbase – Completed and handed over. - HW21 Lachlan Street Rehabilitation at Hay, which includes deep lift asphalt works for a section in the middle of the township – in progress. - HW14 Sturt Highway Rehabilitation at Twelve Mile Lane, which west of Wagga Wagga. It involves widening and reconstruction including overtaking lanes and CHR, BAL and BAR treatments. – in progress. - B3247 Old Cobram Bridge Removal Project, which spans over Murray River on Main Road 226 linking the border towns of Barooga in NSW and Cobram in Victoria – in progress. Show less

  • Brookmann Water Advisory Pty Ltd
    • Sydney, New South Wales, Australia
    • Project Manager
      • Dec 2020 - Oct 2021

      Pyrmont Bridge Structural Restoration Works, NSW. The works comprised of replacement of structural timber elements that have significantly deteriorated over the years. The restoration works were undertaken in several stages which represented coherent packages of work. The works under this package aimed to rehabilitate the existing bridge structure while ensuring that its heritage status was protected and all works carried out were in line with heritage requirements. The works involved headstock replacement and truss restoration works, including Pier Set 13 (Headstock Replacement) and four spans (Spans 14, 7, 8 and 1). The contract was awarded to Marine, Civil and Maintenance (MCM) Pty Ltd. Show less

    • Senior Professional Engineer
      • Feb 2019 - Nov 2020

      July 2020 – Nov 2020 Princess Highway Upgrade - Berry to Bomaderry, NSW. It was a $450 million project to improve safety, increase road capacity, improve traffic flow and deliver better and more reliable journeys on this section of the highway. When completed, it will be the final piece of more than 30 kilometres of highway upgraded between Gerringong and Bomaderry. The works consist of heavy-duty pavement and 11 new bridge structures, including two overpasses (weathering steel bridge girders). I was responsible for reviewing and finalising project related documents and variations. Project Verifier - Construction April 2019 - June 2020. Western Sydney Airport – Badgerys Creek Road and Elizabeth Drive Intersection Verified and delivered the project two months ahead of time. It involved construction of a roundabout and its connecting road network to enhance road safety, improve traffic efficiency and support Western Sydney Airport development. As a Project Verifier, I was responsible for the works to be carried out in compliance with relevant RMS Specifications. These works involved significant soft ground treatments as per R44 – Earthworks (as constructed in the proximity of creek), drainage works as per R11–Drainage and others. Feb 2019 – April 2019 Northern Beaches Hospital Connectivity and Network Enhancement Project, NSW, Australia. It involved construction of roads, bridges, underpass and their associated components ($500M) to improve and enhance public travel experiences to the newly built Northern Beaches Hospital (Oct 2018). Show less

    • Project Manager
      • Apr 2017 - Feb 2019

      Newell Highway Upgrade - Mungle Back Creek to Boggabilla, NSW, Australia. The project consists of constructing a heavy duty road over 28 kilometres of the Newell Highway between Mungle Back Creek and Boggabilla within the Moree Plains, NSW. The main features include provision of heavy duty pavement, widening the road, provision of overtaking lanes, upgrade intersections, improve access to private property, sign posting and roadside furniture and others. Newell Highway Upgrade - Mungle Back Creek to Boggabilla, NSW, Australia. The project consists of constructing a heavy duty road over 28 kilometres of the Newell Highway between Mungle Back Creek and Boggabilla within the Moree Plains, NSW. The main features include provision of heavy duty pavement, widening the road, provision of overtaking lanes, upgrade intersections, improve access to private property, sign posting and roadside furniture and others.

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Contract and Site Management
      • Jul 2016 - Mar 2017

      Great Western Highway – Mount Victoria Safety Upgrade, NSW, Australia. The Northern Road Upgrade – Stage 1, NSW, Australia. Great Western Highway – Mount Victoria Safety Upgrade, NSW, Australia. The Northern Road Upgrade – Stage 1, NSW, Australia.

    • Utilities
    • 500 - 600 Employee
    • Project Manager
      • Sep 2000 - Dec 2015

      Projects: - Menindee Lakes – Relocation of Lake Wetherell Fuse Plug, NSW, Australia - Burrendong Dam Safety Upgrade, Design Reviewer (Auxiliary Spillway), NSW, Australia - Marebone Break and Gunningbar Regulator Fishways, NSW, Australia - Macquarie Weirs Upgrade Project, NSW, Australia. - Blowering Dam Alternative Riparian System, NSW, Australia. - Blowering Dam Safety Upgrade, NSW, Australia. Project video links: Blowering Dam Part 1 (10:20 minutes): http://www.youtube.com/watch?v=zGVlha0lbS0 Blowering Dam Part 2 (14:40 minutes): http://www.youtube.com/watch?v=8yttn7zwlPM Time Lapse Video (2:50 minutes): http://www.youtube.com/watch?v=l9LuPAVBqrs Refer my CV for further details. Show less

    • Australia
    • Engineering Services
    • 700 & Above Employee
    • Senior Geotechnical Engineer
      • Jul 1999 - Aug 2000

      Projects: - Yelgun to Chinderah - Pacific Highway Upgrade, NSW, Australia. - Orange Water Supply Augmentation, Australia. Projects: - Yelgun to Chinderah - Pacific Highway Upgrade, NSW, Australia. - Orange Water Supply Augmentation, Australia.

    • Design Engineer (Water Resources)
      • May 1991 - Jun 1999

      Projects: - Brogo Dam – Intake Tower Refurbishment, NSW, Australia. - Mallee Cliffs Salt Interception Scheme, NSW, Australia. - Virginia Pipeline Scheme, SA, Australia. - Coomealla Irrigation Scheme, NSW, Australia. - Design of regulators, check & drop structures, bridges, culverts and their associated works. - Design and Investigation of Levees. - Design of radial gates. - and others (refer CV for details). Projects: - Brogo Dam – Intake Tower Refurbishment, NSW, Australia. - Mallee Cliffs Salt Interception Scheme, NSW, Australia. - Virginia Pipeline Scheme, SA, Australia. - Coomealla Irrigation Scheme, NSW, Australia. - Design of regulators, check & drop structures, bridges, culverts and their associated works. - Design and Investigation of Levees. - Design of radial gates. - and others (refer CV for details).

    • Assistant Engineer
      • 1988 - 1991

      Planning and investigation of: - Kanchi Reservoir Scheme, India. - Sildah Irrigation Scheme, India. Planning and investigation of: - Kanchi Reservoir Scheme, India. - Sildah Irrigation Scheme, India.

    • Design Engineer (Civil)
      • 1985 - 1988

      Investigation and design of Tanakpur Hydro-Electric Power Project, India. Investigation and design of Tanakpur Hydro-Electric Power Project, India.

Education

  • University of Sydney
    Doctor of Philosophy, Geotechnical Engineering
    1991 - 1997
  • Indian Institute of Technology, Kharagpur
    Master of Technology, Soil Mechanics and Foundation Engineering
    1982 - 1984
  • BIT Mesra Student-Industry Relations Cell
    Bachelor of Science (Engineering), Civil Engineering
    1977 - 1981

Community

You need to have a working account to view this content. Click here to join now