Jay Shah

Project Estimator at XTREME ENGINEERING PTY LTD
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Australia, AU
Languages
  • Gujarati Native or bilingual proficiency
  • Hindi Native or bilingual proficiency
  • English Professional working proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

5.0

/5.0
/ Based on 3 ratings
  • (3)
  • (0)
  • (0)
  • (0)
  • (0)

Filter reviews by:

Yash Trivedi

Jay is a hardworking and dedicated professional who strives to achieve success in all his projects. Having mentored him, I can personally attest to his persistence in achieving his goals.

Adrian Haigh

During my dealings with Jay, I found him to be extremely professional. A dedicated team member with a strong work ethic. Jay shows great leadership qualities, and is well respected by his team. He is a very capable salesperson with the ability to focus on and achieve multiple sales KPI’s.

Mrityunjai Gupta

Jay has zeel to work, a great team player, perseverant, fantastic learner, and an asset as team member. He demonstrated leadership skills during working on a time-motion project at Adani Ports.

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Australia
    • Oil and Gas
    • 1 - 100 Employee
    • Project Estimator
      • Jul 2022 - Present

      ● Manage multiple projects simultaneously, in size upto $3 million ● Develop project plans, schedules, and budgets, ensuring projects are delivered on time and within budget ● Coordinate with engineers, subcontractors, and vendors to ensure project success ● Ensure compliance with all relevant regulations, codes, and standards ● Manage project risk and develop mitigation strategies as needed ● Foster strong relationships with clients, stakeholders, and project teams ● Manage multiple projects simultaneously, in size upto $3 million ● Develop project plans, schedules, and budgets, ensuring projects are delivered on time and within budget ● Coordinate with engineers, subcontractors, and vendors to ensure project success ● Ensure compliance with all relevant regulations, codes, and standards ● Manage project risk and develop mitigation strategies as needed ● Foster strong relationships with clients, stakeholders, and project teams

    • Australia
    • Mechanical Or Industrial Engineering
    • 1 - 100 Employee
    • Estimator
      • Sep 2021 - Jun 2022

      ● Prepare cost estimates for construction projects, including material and labor costs ● Conduct takeoffs from blueprints and specifications to accurately estimate project costs ● Identify and analyze cost factors that impact project budgets ● Work closely with project managers and other team members to develop project budgets and timelines ● Review and analyze subcontractor bids to ensure competitive pricing ● Negotiate pricing with subcontractors and vendors to ensure cost-effective project delivery Show less

    • United Kingdom
    • Telecommunications
    • 700 & Above Employee
    • Assistant Manager
      • Sep 2019 - Sep 2021

      • Managing three stores in different locations and 15 staff members • Inspiring the staff to reach the store KPI’s • Implementing new sales techniques and educating tips to staff using Salesforce & Siebel • Managing inventory count, collaborate with key stakeholders on initiatives beyond store walls • Receive an inbound call and Log complaints and follow through to resolution • Adapt to individual circumstances by applying both diplomacy and assertiveness to assure customer needs are met on time Achievements: Quantitative data analysis to study the customer requirements and align the business to achieve customer delight which improved the revenue by 30% Show less

    • United States
    • Health, Wellness & Fitness
    • 1 - 100 Employee
    • Participant
      • Jun 2020 - Dec 2020

      MIT community led initiative to tackle toughest healthcare & socioeconomic issues related to ongoing COVID-19 crisis. Build a solution for the COVID-19 crisis 1) Supporting the Underserved 2) Reviving the Informal Economy 3)Strengthening Health Systems 4)Combating Misinformation & Fraud MIT community led initiative to tackle toughest healthcare & socioeconomic issues related to ongoing COVID-19 crisis. Build a solution for the COVID-19 crisis 1) Supporting the Underserved 2) Reviving the Informal Economy 3)Strengthening Health Systems 4)Combating Misinformation & Fraud

    • Drone Assist Engineer
      • Apr 2017 - Nov 2018

      • Examined the working principle, materials used, and process of manufacturing • Developed 2D engineering drawings (Technical drawings, cut lists), 3D CAD models (3D models, engineering views, exploded views, assemblies, and subassemblies), and FEA study (Factor of Safety, Stress Analysis) for the DSM Sieve Bend Assemblies • Used LiDAR and Thermal technology for asset inspections, Mapping, 3D Modelling and Reporting using SolidWorks & DJI Land Surveying • Developed a project report with appropriate documentation and a detailed presentation after the completion of the project with recommendations and feedback highlighting the areas for improvement Show less

    • India
    • Construction
    • 700 & Above Employee
    • Project Intern
      • Dec 2017 - Feb 2018

      The aim of the project was to optimise existing process and define new standard operating procedure of the entire manufacturing floor. JIDOKA method has been the primary influence in defining new standard operating procedure The aim of the project was to optimise existing process and define new standard operating procedure of the entire manufacturing floor. JIDOKA method has been the primary influence in defining new standard operating procedure

    • India
    • Transportation, Logistics, Supply Chain and Storage
    • 700 & Above Employee
    • Internship
      • May 2017 - Jul 2017

      The internship was to optimised cycle time at the container terminal of ITV at CT-3. • Developed specifications and deliverables for optimising the Terminal 3 of Mundra port in a team of 6 • Developed the design Value-added and non-Value-added activities in port terminal • Designed validation with cause effect simulation using MINITAB • Developed model reducing non-value added activity to study the effects of lead time in proportion to total cycle time using Time and motion study Achievements: Based on simulation developed a Standard operating procedure which increased the efficiency by 20% and profit up to 10% Show less

Education

  • QUT (Queensland University of Technology)
    Master's degree, Project Management
    2020 - 2021
  • QUT (Queensland University of Technology)
    Master's degree, Engineering/Industrial Management
    2019 - 2019
  • Pandit Deendayal Petroleum University (PDPU)
    Bachelor's degree, Industrial Engineering
    2014 - 2018
  • Mount Carmel High School Gandhinagar
    10th
    2003 - 2012

Community

You need to have a working account to view this content. Click here to join now