Jay Patel, M.Eng.

Documentation Engineer at Tecma Associates, Inc.
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Chicago Area, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Construction and Materials Management System (CMMS)
    Illinois Department of Transportation
    Nov, 2021
    - Nov, 2024
  • Erosion and Sediment Control Workshop Module I: Fundamental Module
    Illinois Department of Transportation
    Mar, 2020
    - Nov, 2024
  • Erosion and Sediment Control Workshop Module III: Inspection Module
    Illinois Department of Transportation
    Apr, 2021
    - Nov, 2024
  • Documentation of Contract Quantities (S-14)
    Illinois Department of Transportation
    Apr, 2021
    - Nov, 2024

Experience

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Documentation Engineer
      • Nov 2021 - Present

      CCDOTH Contract 2028-18250R: County Line Road - I-294 Ramp to North Avenue.

    • Civil Engineer
      • Apr 2019 - Present

      IDOT Contract 62A77: I-90/94 SB Lake St. to Roosevelt, Jane Byrne (Circle) Interchange.IDOT Contract 60X79: I-290 EB Ramp to I-90/94 NB, Jane Byrne (Circle) Interchange.IDOT Contract 60X99: Van Buren Street Bridge at I-90 at I 290.IDOT Contract 62J59: I-90 from West of IL Rte. 43 (Harlem Ave) to I-94.IDOT Contract 60V55 IL 132: (Grand Ave.) from Munn Rd. to Deerpath Dr.Kane County Division of Transportation: Peplow Road over Tributary to Virgil Ditch # 3.

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Construction Engineer
      • Jun 2018 - Dec 2018

      CDOT Contract B-3-505: Arterial Street Resurfacing Project 78-Far South Area; Construction Engineer for the resurfacing of 11.2 miles of City of Chicago arterials located throughout the far south side of the City. Work included milling with HMA resurfacing, full depth patching, structure adjustments, ADA ramp construction, PCC sidewalk/C&G/driveway removal and replacement, landscaping, and pavement marking installation.CDOT Contract B-4-155: Arterial Street Resurfacing Project 82-Far South Area; Construction Engineer for the resurfacing of 10.7 miles of City of Chicago arterials located throughout the far south side of the City. Work included milling with HMA resurfacing, full depth patching, structure adjustments, ADA ramp construction, PCC sidewalk/C&G/driveway removal and replacement, median work, landscaping, and pavement marking installation.

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Quality Control Intern
      • May 2017 - Aug 2017

      • Operated as a Field Technician: concrete testing, soil boring and sampling, proof rolls, re-bar inspections, filled out field and inspection reports• Operated as a Lab Assistant: comprehensive strength testing, sulfur capping, proctor testing• Nuclear Gauge Operator 2017 (Troxler Training Course with Hazmat) • Operated as a Field Technician: concrete testing, soil boring and sampling, proof rolls, re-bar inspections, filled out field and inspection reports• Operated as a Lab Assistant: comprehensive strength testing, sulfur capping, proctor testing• Nuclear Gauge Operator 2017 (Troxler Training Course with Hazmat)

    • United States
    • Civil Engineering
    • 1 - 100 Employee
    • Quality Control Intern
      • Jul 2016 - Aug 2016

      • Operated as a Field Technician: concrete testing, soil boring and sampling, proof rolls, re-bar inspections, filled out field and inspection reports• Operated as a Lab Assistant: comprehensive strength testing, sulfur capping, proctor testing • Operated as a Field Technician: concrete testing, soil boring and sampling, proof rolls, re-bar inspections, filled out field and inspection reports• Operated as a Lab Assistant: comprehensive strength testing, sulfur capping, proctor testing

    • United States
    • Construction
    • 1 - 100 Employee
    • Project Engineer
      • May 2015 - Sep 2015

      • Assisted Project Managers with project documentation – submittals and RFIs, coordination of drawings and specifications• Performed takeoff, participated in bidding• Performed procurement of materials, material management, and inventory logs• Managed work schedules and labor force requirements• Updated Company’s bidding document with modern templates• Participated in managing self-performed work on site• OSHA Certified 2015 (30-hour Construction Course) • Assisted Project Managers with project documentation – submittals and RFIs, coordination of drawings and specifications• Performed takeoff, participated in bidding• Performed procurement of materials, material management, and inventory logs• Managed work schedules and labor force requirements• Updated Company’s bidding document with modern templates• Participated in managing self-performed work on site• OSHA Certified 2015 (30-hour Construction Course)

Education

  • Illinois Institute of Technology
    Master's degree, Construction Engineering and Management
    2018 - 2018
  • Illinois Institute of Technology
    Bachelor of Science (B.Sc.), Civil Engineering
    2014 - 2018

Community

You need to have a working account to view this content. Click here to join now