Jay Norton
VTC Technician at Global Commerce and Services, LLC- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Credentials
-
CISEC-IT
CISEC, Inc.Feb, 2016- Nov, 2024 -
2151/NET+: Network Essentials Comb- - Microsoft and CompTIA
Intererface Techincal TrainingMar, 2005- Nov, 2024
Experience
-
Global Commerce and Services, LLC
-
United States
-
IT Services and IT Consulting
-
1 - 100 Employee
-
VTC Technician
-
Jan 2021 - Present
-
-
-
T&T Consulting SAS
-
France
-
IT Services and IT Consulting
-
100 - 200 Employee
-
Voice Data Specialist
-
Mar 2020 - Jan 2021
-
-
-
Independant Contractor
-
Spring Branch, Texas
-
Storm Water Inspector
-
Jan 2015 - Mar 2020
-
-
-
OBXtek
-
United States
-
IT Services and IT Consulting
-
200 - 300 Employee
-
Audio Visual Technician
-
Mar 2019 - Feb 2020
-
-
-
Independent Contractor
-
San Antonio, Texas Area
-
Telecommunications Specialist
-
1998 - Mar 2019
-
-
-
Comm/net Systems, Inc.
-
United States
-
Telecommunications
-
1 - 100 Employee
-
DC Power Installation Technician Level 4
-
Feb 2014 - Jun 2014
-
-
-
Level 3 Communications
-
Telecommunications
-
700 & Above Employee
-
Utlities Locator/Installation Engineer
-
Jun 2013 - Nov 2013
-
-
-
Self Employed
-
San Antonio, Texas Area
-
Level 4 Installer
-
Mar 2011 - Jun 2013
-
-
-
TelcoPrime Inc
-
Dallas/Fort Worth Area
-
Lead Installation Engineer
-
Feb 2013 - May 2013
-
-
-
Vigilant Power Solutions, Inc
-
Utilities
-
Installation Technician
-
Aug 2009 - Feb 2011
Contracted.Commission and Troubleshooting of Central Office Equipment. Contracted.Commission and Troubleshooting of Central Office Equipment.
-
-
-
-
NSW Field Supervisor/Auditor/Lead Installer
-
Jan 2008 - Jan 2009
Primary duties: Provide work assignments and instructions to team members and evaluate their performance. Conduct Tool Box meetings and prepare forms. Resolve job specification and drawing problems with appropriate engineer. Resolve material problems with the appropriate representative of that group. Correct (mark) Exchange records/drawings. Act as installation suppliers on site contact with the customer. Perform and document in progress and final quality inspections. Verify that required documentation turned over to customer and Operations Supervisor is complete and accurate. Installation of equipment and train team members. Primary clients include Telstra, Optus, Silcar, and Visionstream Show less
-
-
-
Volt Telecom Group
-
Telecommunications
-
1 - 100 Employee
-
Installation Lead - AT&T Certified Level 4
-
Jun 2007 - Dec 2007
Primary duties: Job site supervision; run and secure cables and jumpers; measure and mark floors from floor plan drawing; position and assemble ironwork and cable rack in an existing environment; assemble frames and miscellaneous hardware; drill floors and install anchors; level, align, secure, and ground bays; assist in installing miscellaneous equipment, earthquake protection, end guards; perform basic wiring to alarms; install bay mounted AC outlets and light fixtures; addition or removal of common sys/transmission equipment/hardware; and addition or removal of connections/terminations, power, abam and coaxial cables on non-working equipment; lead verification, continuity tests. Show less
-
-
-
-
Installation Supervisor
-
Nov 2006 - May 2007
Primary duties: 48v dc and 130v ac Power Plants and Battery Systems Installation, including ironwork, cabling, spill containment and all associated functions. Installation capabilities and requirements: Battery Systems DC Power Plants, Rectifiers, Distribution, etc. Power Plant Controllers Entire Power Rooms, including auxiliary framing and cable rack Expanding Bus & Power Systems Grounding Systems Preventive & Remedial Maintenance Programs Midtronics Meters Serveron Battery Monitors Plated Connectors, Bus Bars, Breaker Panels Spill Containment & Clean-up Systems Safety Equipment Generac Generators Show less
-
-
-
-
Western Area Installation Supervisor
-
Feb 2006 - Nov 2006
Primary duties: 48v dc Power Plants and Battery Systems Installation, including ironwork, cabling, spill containment and all associated functions. Primary duties: 48v dc Power Plants and Battery Systems Installation, including ironwork, cabling, spill containment and all associated functions.
-
-
-
Raise Solutions Private Limited
-
India
-
IT Services and IT Consulting
-
1 - 100 Employee
-
Installation Technician
-
Dec 2005 - Feb 2006
Primary duties: Installation, Commission and Troubleshooting of Central Office Equipment for Tekelec. Primary duties: Installation, Commission and Troubleshooting of Central Office Equipment for Tekelec.
-
-
-
CenturyLink
-
United States
-
IT Services and IT Consulting
-
700 & Above Employee
-
Central Office Equipment Installation Technician
-
Mar 2000 - Jun 2004
Primary duties: installation of equipment, trouble shooting, and associated paper work. Ran various size crews. Primary duties: installation of equipment, trouble shooting, and associated paper work. Ran various size crews.
-
-