Jay Johnson

Project Architect at Johnston Architects
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Seattle, Washington, United States, US

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • National Council of Architectural Registration Boards Certification (NCARB)
    National Council of Architectural Registration Boards (NCARB)
    May, 2009
    - Nov, 2024
  • Architect
    Washington State
    Feb, 2021
    - Nov, 2024

Experience

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Project Architect
      • Jun 2022 - Present

    • Project Architect
      • Jun 2021 - Jun 2022

      Thrilled to start a new position with Owen Richards Architects working the in performing arts sector of public cultural arts, the area of architecture that most interests me. Thrilled to start a new position with Owen Richards Architects working the in performing arts sector of public cultural arts, the area of architecture that most interests me.

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Architect
      • Mar 2021 - Jun 2021

      Design support on a Mixed-Use Multifamily project during Schematic Design and Design Development. Design support on a Mixed-Use Multifamily project during Schematic Design and Design Development.

    • United States
    • Architecture and Planning
    • 100 - 200 Employee
    • Architectural Designer
      • Jan 2015 - Jul 2020

      Northgate Link ExtensionU District Station, Seattle, WA. New light rail station located below grade in the University District’s commercial core on Brooklyn Avenue NE between NE 43rd and 45th Streets. Responsibilities included design/production team member from Final Design 90% through 100% Construction Document development, BIM Lead and consultant coordination (primarily Structural, Vertical Transportation). In addition, two and a half years of Construction Contract Administration in support of the Project Architect and the Sound Transit Construction Management team.Lynnwood Link Extension Lynnwood City Center Station, Lynnwood, WA. New light rail station located above ground in the Lynnwood Transit Center and commercial core of Lynnwood. Responsibilities included design/production team member, BIM Lead and consultant coordination during the 60% Final Design Development phase.

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Architectural Designer
      • Feb 2012 - Nov 2014

      East Link Extension Rainier Station, Seattle, WA. New light rail station located in the center roadway of I-90 between Rainier Avenue South and 23rd Avenue South. Responsibilities included project design/production team leader, consultant coordination, BIM Lead and Public Outreach Graphics production from start of Final Design through the 60% Design Development phase. Northgate Link Extension Northgate Station, Seattle, WA. New light rail station located adjacent to shopping mall and freeway. Responsibilities included design/production team member, consultant coordination, and Public Outreach Graphics production from Final Design 30% to 60% Design Development phase. Maple Leaf Portal, Seattle, WA. New tunnel support facilities including egress stair, mechanical/electrical building and screening walls. Responsibilities included project design/production team lead, design lead, consultant coordination, and Public Outreach Graphics production from Final Design 30% to 60% Design Development Phase.

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Architectural Designer
      • 2005 - 2011

      Selected projects: Rose Hill Middle School, Redmond, WA. New 136,000 sf school and grounds. Responsibilities included Production Lead (Revit), mechanical and A/V coordination and design/drafting team member from 50% Design Development through 95% Construction Documents. Liberty High School, Issaquah, WA. Additions and modernization of public school and grounds. Responsibilities included consultant coordination and design lead on 50,000 sf Athletics Area addition from 50% Design Development through Bid Documents. First United Methodist Church, Seattle, WA. New 26,000 sf Church and 63,000 sf Parking Garage with lower level Community Center. Responsibilities included Production Lead (Revit), consultant coordination, design/drafting team member from Schematic Design through Contract Administration. St. Thomas School, Medina, WA. New 55,000 sf Pre-K through 6th grade private elementary school and grounds. Responsibilities included Production Lead (CAD) and design/drafting team member from Schematic Design through Bid Documents.

    • United States
    • Architecture and Planning
    • 1 - 100 Employee
    • Architectural Designer
      • 2005 - 2005

      Responsibilities included drafting team member on multi-family housing projects. Responsibilities included drafting team member on multi-family housing projects.

    • Motion Picture Lighting Technician
      • 1992 - 2005

      Performed various roles as freelance lighting technician. Responsibilities included design, coordination, installation and operation of set lighting systems. Project size ranged from small music videos to major motion pictures. Additional responsibilities included direct supervision of crews, inter-departmental communication and budget accountability Performed various roles as freelance lighting technician. Responsibilities included design, coordination, installation and operation of set lighting systems. Project size ranged from small music videos to major motion pictures. Additional responsibilities included direct supervision of crews, inter-departmental communication and budget accountability

    • United States
    • Performing Arts
    • 1 - 100 Employee
    • Lighting Designer and Co-founder
      • 1990 - 1991

    • United States
    • Higher Education
    • 700 & Above Employee
    • Technical Director
      • 1987 - 1988

      Responsibilities included direct supervision and implementation of technical production in the Studio Theatre and Concert Hall.

    • Lighting Designer
      • 1983 - 1988

      Lighting designer on more than 25 collegiate productions. Responsibilities included installation and operation of theatrical lighting systems.

Education

  • University of Washington
    MArch, Architecture
    2000 - 2004
  • University of Wisconsin-Platteville
    Bachelor of Science, Radio and Television Broadcasting
    -

Community

You need to have a working account to view this content. Click here to join now