Javier Fernandez Palacio

Field Industrial Engineering Department Manager at Otis España (Zardoya Otis)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
Greater Madrid Metropolitan Area, ES
Languages
  • Inglés Full professional proficiency

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Experience

    • Germany
    • Machinery Manufacturing
    • 400 - 500 Employee
    • Field Industrial Engineering Department Manager
      • Jul 2017 - Present

      Management of the industrial engineering field department. Design and implementation of improvements in installation methods for land and marine equipment. - Trainer in assembly management and methods. Organization, distribution and supervision of tasks / projects. · Evaluate new technologies for new product solutions from concept to final solution from the field point the view · Responsible for identifying project technical field goals and requirements · Lead technical staff on day to day activities (engineers and mechanics) · Support the design solutions effort which will involve design and testing or supporting field issues · Ensure that Otis products and processes are in line with the EH&S mandates and principles of robust design Show less

    • Consumer Services
    • 700 & Above Employee
    • Field International Project Leader
      • Sep 2016 - Present

      Field work supervision (installation and service) of a new elevator design at an international level, collaborating with the different subsystems and optimizing the design to improve all aspects related to field works. - Global installation method optimization. - Digital transformation of assembly documentation. - Reduction of 15% in the installation time of the standard equipment. - 40% reduction in the price of installation tools. Field work supervision (installation and service) of a new elevator design at an international level, collaborating with the different subsystems and optimizing the design to improve all aspects related to field works. - Global installation method optimization. - Digital transformation of assembly documentation. - Reduction of 15% in the installation time of the standard equipment. - 40% reduction in the price of installation tools.

    • Service Manager
      • Jun 2013 - Jun 2015

      Continuous improvement in the organization of the service department. - Management of maintenance contracts. -Planning of maintenance routes. - Stock management of parts and materials. -Continuous training for technicians. -Monitoring of callbacks and reports with headquarters. - Incident reports to headquarters. - Direct relationship with large maintenance accounts (shopping centers, hotels and airports). Continuous improvement in the organization of the service department. - Management of maintenance contracts. -Planning of maintenance routes. - Stock management of parts and materials. -Continuous training for technicians. -Monitoring of callbacks and reports with headquarters. - Incident reports to headquarters. - Direct relationship with large maintenance accounts (shopping centers, hotels and airports).

    • Consumer Services
    • 700 & Above Employee
    • Field Industrial Engineer
      • Feb 2008 - May 2013

      Design of installation methods and processes to improve elevator installation times and costs. -Lift tooling design. -Time mesurement, administration and management of databases. -Product tests and assembly on jobsite and test tower. - Preparation of installation manuals. Creation and management of graphics for manuals and technical circulars. - Risk analysis for non-specific jobs. - Construction management. - Implementation of a new visual system for requesting components during the montage. - Creation of a new system of technical installation manuals. Show less

    • Germany
    • Machinery Manufacturing
    • 400 - 500 Employee
    • Engineer
      • Feb 2008 - May 2013

Education

  • Universidad Europea de Madrid
    Masters in International Project Management
    2012 - 2012
  • Confemetal
    Masters in Prevention of Occupational Hazards, (600 hours)
    2009 - 2009
  • Universidad Politécnica de Valencia
    Masters in Transport Design
    2005 - 2007
  • Universidad San Pablo-CEU
    Industrial Design Engineering
    2002 - 2005

Community

You need to have a working account to view this content. Click here to join now