Javed Muhammad

Sub Engineer civil at FPCL (FFBL Power Company Limited)
  • Claim this Profile
Contact Information
us****@****om
(386) 825-5501
Location
PK
Languages
  • Hindi -
  • Urdu -
  • Portuguese Limited working proficiency
  • English -
  • Punjabi -

Topline Score

Topline score feature will be out soon.

Bio

Generated by
Topline AI

You need to have a working account to view this content.
You need to have a working account to view this content.

Credentials

  • Workforce safety leader
    SIPP PART 1&2 FROM CB&I

Experience

    • Pakistan
    • Oil and Gas
    • 300 - 400 Employee
    • Sub Engineer civil
      • May 2022 - Present

    • Sr.Associated Engineer civil
      • Apr 2018 - Present

  • FFBL POWER COMPANY LIMITED
    • Fauji fertilizer Bin Qasim Karachi Pakistan
    • LEAD SUPERVISOR CIVIL
      • May 2014 - Present

      118 MW Coal power plant construction work. 118 MW Coal power plant construction work.

    • United States
    • Oil and Gas
    • 700 & Above Employee
    • Civil Supervisor
      • Aug 2011 - Dec 2013

      • Supervision for the construction of three propylene double walls tanks Takereer Ruwais Refinery project at Abu Dhabi • Planning & Construction Of Structural Excavation, Machinery Foundation, Building Structures, Pedestal, Trench Work like and other jobs.• Concrete prevention and repair like walkways, and pathways, curbs and dewatering jobs at the work site. • Prepared Cost Estimate Of The Project, Calculated the Quantities Of Various Items Required For Completion Of The Work And Prepared Estimate Of The Same. Prepared Project Budget And Cost Schedule Of The Project, Advised Management On Minimizing Cost.• Supervison of Pre-stressing work• Checking the approved drawings and making schedule for the work.• Identify all types of materials and calculate quantities required for the approved construction• I do plan my work well and execute the work within the time allotted to me for each project.• Attend the daily morning meeting with the management and share the work updates everyday• Monitoring the construction and shuttering work according to the approved work.• Monitoring the concrete pouring work including air content test, slump test and temperature of concrete and also ensure that enough number of vibrators are used for concrete work.• Location and elevation inspection of equipment foundations which includes anchor bolts and embedded plates.• Supervisor for the construction of Roof sealing single deck tank at Takereer Ruwais Refinery project at Abu Dhabi

    • Civil foreman
      • Jul 2008 - Jul 2011

      • Planning & Construction Of Structural Excavation, Machinery Foundation, Building Structures, Pedestal, Trench Work like and other jobs.• Concrete prevention and repair like walkways, and pathways, curbs and de-watering jobs at the work site. • Prepared Cost Estimate Of The Project, Calculated the Quantities Of Various Items Required For Completion Of The Work And Prepared Estimate Of The Same. Prepared Project Budget And Cost Schedule Of The Project, Advised Management On Minimizing Cost.• Checking the approved drawings and making schedule for the work.• Identify all types of materials and calculate quantities required for the approved construction• I do plan my work well and execute the work within the time allotted to me for each project.• Attend the daily morning meeting with the management and share the work updates everyday• Checking the approved drawing and calculating the quantities of steel reinforcement required for the construction and submit to the construction manager.• Calculating the quantity of RCC required for all construction work according to the approved drawings.• Checking the approved drawings and estimating the quantity of material for the construction like cement, sand, crush, steel, grouting, doors, windows, anchor bolts, angles, tiles, bricks, skirting, water proofing materials, painting, plastering, etc.• Monitoring the construction and shuttering work according to the approved work.• Monitoring the concrete pouring work including air content test, slump test and temperature of concrete and also ensure that enough number of vibrators are used for concrete work.• Location and elevation inspection of equipment foundations which includes anchor bolts and embedded plates.• Inspection of works carried out by contractor and use surveillance report to document both acceptable and deficient works found at the time of inspection.

  • FA
    • KARCHI PAKISTAN
    • FFBL (FAUJI FERTILIZER BIN QASIM LIMITED)
      • Jan 1995 - Jul 2008

      • Supervision for the Anti Acid Coating and Tilling Works at FFBL. • Supervision for the construction of Ammonia, DAP Plant at FFBL. • Supervision for the construction / erection of producer storage building at FFBL. • Supervision for the construction of RAW water / cooling water at FFBL. • Supervision for the construction of pilling work at tank farm area. • Supervision for the construction of Pre-cast columns purloins. • Planning & Construction Of Structural Excavation, Machinery Foundation, Building Structures, Pedestal, Trench Work like and other jobs. • Concrete prevention and repair like walkways, and pathways, curbs and dewatering jobs at the work site. • Prepared Cost Estimate Of The Project, Calculated the Quantities Of Various Items Required For Completion Of The Work And Prepared Estimate Of The Same. Prepared Project Budget And Cost Schedule Of The Project, Advised Management On Minimizing Cost. • Supervision of different projects under BMR Deptt. Like DAP revamp, extension of Ammonia Plant.

Education

  • GOVT: JAMIA MILLIA POLITECHNICAL INSTITUTE
    Associate's Degree, CIVIL
    2004 - 2006
  • GOVT JAMIA MILLIA POLITECHNICAL INSTITUTE
    Civil Engineering
    2003 - 2006

Community

You need to have a working account to view this content. Click here to join now