Jason Hooper
Site Manager at Green Frog Connect- Claim this Profile
Click to upgrade to our gold package
for the full feature experience.
Topline Score
Bio
Experience
-
Green Frog Connect
-
United Kingdom
-
Utilities
-
1 - 100 Employee
-
Site Manager
-
Jan 2023 - Present
-
-
-
Walters
-
United Kingdom
-
Civil Engineering
-
100 - 200 Employee
-
Project Manager
-
Oct 2021 - Nov 2022
278 Scheme including earthworks, utilities, infrastructure & deep drainage 278 Scheme including earthworks, utilities, infrastructure & deep drainage
-
-
-
Montel Civil Engineering
-
United Kingdom
-
Civil Engineering
-
1 - 100 Employee
-
Site Manager
-
Jun 2021 - Sep 2021
Freelance Holiday / Night cover on various sites Freelance Holiday / Night cover on various sites
-
-
-
Kier Group
-
United Kingdom
-
Construction
-
700 & Above Employee
-
Project Manager
-
Sep 2020 - Apr 2021
Demolition, earthworks & provision of piling mat for a new university building Demolition, earthworks & provision of piling mat for a new university building
-
-
-
Dyer & Butler
-
United Kingdom
-
Civil Engineering
-
200 - 300 Employee
-
Project Manager
-
Oct 2018 - Aug 2020
1. M5 Jn 22-23 Surfacing, Concrete Barrier Installation and various maintenance works 2. A350 Chippenham, night works to assist with Surfacing operations 3. Valley Gardens Brighton, Pedestrianization scheme including new road layout and signalized junction 1. M5 Jn 22-23 Surfacing, Concrete Barrier Installation and various maintenance works 2. A350 Chippenham, night works to assist with Surfacing operations 3. Valley Gardens Brighton, Pedestrianization scheme including new road layout and signalized junction
-
-
-
Fitzgerald Contractors Limited
-
Civil Engineering
-
1 - 100 Employee
-
Project Manager
-
Oct 2015 - Sep 2018
-
-
-
Cirencester Civil Engineering Ltd
-
Nationwide
-
Contracts Manager
-
Jun 2012 - Sep 2015
Resin Bound and Resin Bond Surfacing specialists Resin Bound and Resin Bond Surfacing specialists
-
-
-
Skanska
-
Sweden
-
Construction
-
700 & Above Employee
-
Senior Site Manager
-
Mar 2010 - Jun 2012
Working on the Olympic Park LPR Working on the Olympic Park LPR
-
-
-
-
Senior Site Manager
-
Jul 2009 - Oct 2009
Main Contract Include: 1.2m Duke St. Pedestrianisation, Cardiff 2000m2 pedestrianisation scheme & new signalised crossing in the very busy city centre under a very tight 12 week timescale involving 24hr working delivered within the contract timescale Permanent Main Contract Include: 1.2m Duke St. Pedestrianisation, Cardiff 2000m2 pedestrianisation scheme & new signalised crossing in the very busy city centre under a very tight 12 week timescale involving 24hr working delivered within the contract timescale Permanent
-
-
-
Wrekin Construction
-
Construction
-
1 - 100 Employee
-
Operations Manager (Contracts Manager)
-
Aug 2008 - Mar 2009
Main Contracts Include: 8.0m Coln Park Development, Lechlade Infrastructure for the development of 48 luxury lakeside holiday homes including all roads and services, access bridges and also piled, reinforced concrete bases for the dwellings 8.0m Unilever Cold Store, Gloucester A new 16,000m², 30 metre high cold store for Partner Logistics in Gloucester which includes he main, 14,600m² high bay, clad rack warehouse also has an adjoining 6,000m² expedition/picking area with loading bays, used for shipping customer orders to the UK and overseas, and a 1,400m² administration facility that will be the Partner Logistics' offices as well as the control centre for the Gloucester facility. 1.5m Seven Bridge Upgrade Contract - Rail The upgrade of 7 nr bridges within the South West region (Devon and Cornwall) for Network Rail Freelance Show less
-
-
-
-
Project Manager
-
Jun 2007 - Sep 2008
Main Contracts Include: 8.0m St Ann's Bridge Link Gloucester New Steel Lift Bridge over Canal in Gloucester, my role includes producing Method Statements and Risk Assessments for all aspects of the work and preparing and managing the Quality Management systems on site, also developing the Health & Safety File for the completion of the contract 400k A46 Ashchurch Traffic Light Improvements Replace existing junction with new signals and revised road layout, acting as Project Manager 1.0m Environment Agency - Main River Maintenance Contract River, Brook and stream maintenance contract for the EA. My role was developing the Health & Safety Plan, producing Method Statements and Risk Assessments, also on site assessment of requirements and liaison with the EA Show less
-
-
-
-
Site Manager
-
Jan 2006 - Jun 2007
Completion of Groundwork's Package around conversion of existing Hospital Buildings into residential properties 1.0m Thornhill Park & Ride, Oxford Construction of new Bus Terminal on the existing Park & Ride site Completion of Groundwork's Package around conversion of existing Hospital Buildings into residential properties 1.0m Thornhill Park & Ride, Oxford Construction of new Bus Terminal on the existing Park & Ride site
-
-
-
-
Site Manager
-
May 2005 - Jan 2006
Main Contracts Include: 500k Structure's Repairs Replacement and Repair of Various bridges and structures throughout the County as part of the Term Maintenance contract between Ringway Main Contracts Include: 500k Structure's Repairs Replacement and Repair of Various bridges and structures throughout the County as part of the Term Maintenance contract between Ringway
-
-
-
-
Contracts Manager
-
Nov 2003 - May 2005
Main Contracts Include: Main Contracts Include:
-
-
-
-
Senior Site Manager
-
Nov 2002 - Nov 2003
Main Contracts Include: 1.5m Main Contracts Include: 1.5m
-
-
-
-
Project Manager
-
Oct 2000 - Oct 2002
Main Contracts Include; Infrastructure for large development on the outskirts of Reading 3.0m Locking Castle, Weston New Road link, Sustainable Drainage Scheme & Rising Main installation. Deep Drainage & Heavy Structures to be built. Main Contracts Include; Infrastructure for large development on the outskirts of Reading 3.0m Locking Castle, Weston New Road link, Sustainable Drainage Scheme & Rising Main installation. Deep Drainage & Heavy Structures to be built.
-
-
-
-
Project Manager
-
Jan 1988 - May 2000
-
-
-
-
Setting Out Engineer
-
Jan 1988 - Jan 1992
Main Contracts Include: 2.8m Wills Development Swindon New carriageway, diversion works, major drainage & Infrastructure 120k Staunton Pitts WRW Upgrading of sewage Treatment Works include sinking 6m dia by 6m depth shaft 800k Stroud Valley SO Rationalisation of sewage systems include large diameter pipes and holding tanks 130k Main Contracts Include: 2.8m Wills Development Swindon New carriageway, diversion works, major drainage & Infrastructure 120k Staunton Pitts WRW Upgrading of sewage Treatment Works include sinking 6m dia by 6m depth shaft 800k Stroud Valley SO Rationalisation of sewage systems include large diameter pipes and holding tanks 130k
-
-
Education
-
Gloucestershire College of Arts & Technology
HND Buiklding Construction, Mathematics, Physics, Human Biology, English, Computer Studies, Design, Geology; Mathematics -
Gloucestershire College of Arts & Technology
HNC, Building Construction -
Crypt Grammar School, Gloucester
O and A Levels, Various